ML18227A390
| ML18227A390 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/03/1975 |
| From: | Schmidt A Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227A390 (15) | |
Text
MONTHLY REPORTS (FOR GRAY BOOK PREPARATION)
NRC TRIBUTION FOR PART 50 DOCK
.NIATERIAL (TEMPORARY FORM)
CONTROL NO:
\\
FII F MONTHLY REPORT FILE FROM Florida Power
& Light Co Miami, Fla, AD Shmd DATE OF DOC DATE R EC'D LTR TWX RPT OTHER TO:
ORIG i Signed CC OTHER SENT AEC PDR~R~P CLASS UNCLASS PROPINFO XXXX INPUT NO CYS REC'D DOCKET NO:
50-25 25k DESCR IPTION:
, Ltr trans the following:
PLANT NAME T k
Turkey Point 3 & 4 ENCLOSURES:
Monthly Report for June 1975 Plant
& Component Operability 6 Availability This Report: to be used in preparing Gray Book by Plans
& Operations.
IRHBER OF COPIES REC'D:
FOR ACTION/INFORMATION
~ m,A V ~~ 'CR 7-8-75 BUTLER (L)
W/ Copies CLARk (L)
W/ Copies PARR (L)
W/ Copies KNIEL (L)
W/ Copies SCHWENCER (L)
W/ Copies STOLZ (L)
W/ Copies VASSALLO (L)
W/ Copies PURPLE (L)
W/ Copies ZIEMANN(L)
W/ Copies DICKER (E)
W/ Copies KNIGHTON (E)
W/ Copies YOUNGBLOOD W/ Copies REGAN (E)
W/ Copies g LEAR (L)
W/ Copies SPELS W/ Copies (E)~ MIPC/PE W.4 Copies OGC, ROOM P-506A.
GOSS I CK/STAF F CASE GlAM8USSO BOYD MOORE (L)
DEYOUNG (L)
SKOVHOLT (L)
GOLLER (L) (Ltr)
P. COLLINS DENISE REG OPR FILE & REGION (2)
T.R. WILSON
'STEELE TECH REVIEW SCHROEDER MACCARY KNIGHT PAW LICK I SHAO STE LLO HOUSTON NOVAK ROSS IPPO LITO TEDESCO J.
COLLINS LAINAS BENAROYA VOI LMER DENTON GRIMES R.
GAMMILL H.
KASTNER E.
BALLAR0 P,
SPANG LE R J.
M.
ENVIRO S.
MUL LE R M.
DICKER S.
KNIGHTON M.
YOUNGB LOOD H.
REGAN S.
PROJECT LDR G.
V.
HAR LESS LIC ASST DIGGS (L)
GEAR IN (L)
GOULBOURNE (L)
KREUTZER (E)
LEE (L)
MAIGRET (L)
REED (E)
SERVICE (L)
SHEPPARD (L)
SLATER (E)
SMITH (L)
TEETS (L)
WILIIAMS (E)
WILSON (L)
INGRAM (L)
INTER MAL D ISTR I BUT ION
'A/T IND.
BRAITMAN SALTZMAN MELTZ PLANS
~MCDONALD CHAPMAN DUBE (Ltr)
E. COUPE PETERSON HARTFIELD (2)
KLECKER EISENHUT WIGGINTON
~
-XTERNALDISTRIBUTION
~1 LOCALPDR p
~1 TIC (ABER ATHY)
(1)(2)(10) NATIONALLABS
~1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rrn E-201 Gl 1 ASLB 1
CONSULTANTS 1 Newton Anderson NEWMARK/8LUME/AGBABIAN ACRS HOLDING/SENT 1 PD R-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON, ORNL 1 AGMED (RUTH GUSSMAN)
Rrn B-127 GT 1 J. D. RUNKLES, Rin E-201 GT
Office of Management Information and Program Controls U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Pg,~C,S f~~i, ),-,
.O. IDX 8100 MIAMI,B.OIIIOA 3$ IOI
.<%life f/)g+
FLORIDA POWER 5 LIGHT COiVIPANY July 3, 1975 CD (p
l-JUf g i/7~I" II S. l'V/(I.>> pi;jjpv Ljl e>> ij(~
Gentlemen:
Attached are the June, 1975 Operating Status Reports for Turkey Point Units Nos.
3 and 4.
Very truly yours, g
/'.
chmidt Vice President Power Resources VTC/mid Attachments cc:
Mr. Norman C. Moseley Jack 'R.
Newman, Esquire 1218 IIbLPIYG BUILD FLO'~IOA
'I I
'0 l
h Wl~ e*
f pl i(
P E
~
~
1
~ p
~ p
I I
~
~ ~
~ I III
~
~
I
~
I I I 0 I
I I
~ Ii I
~
I I
I
~
a
~
~
~
I
~
I'L
~
~
l a
~
~
~
~
I ~
~
~
~
~
~
~
~
~
I ~
~
~
I
~
a
~
~
~
~
a I
~
~
~
~
~ 4 a
~
~
a I ~
~ '
~
a a
I ~
I I
~
Ia a
I
~
~
0
~ ~-
I
~
~
I I ~
I I
~
lI
~ ~
I ~
'I
~
a
~
~
~
~
~ I
~
I
~
I
~
ENCLOSURE A.
DOCKET~0; UNIT NAME 00i%'LETED BY TELEPHOiNE NO..
Turkey Point Unit No.
3 July 1, 1975 Mary Lee Montgom'cry 305 245-2910
-Fxt.
2
'I
~
'DAILY 'UNIT POIKR OUTPUT hoiVIH June AVERAGE DAILY'N)'e-net DAY 639 20 AVERAGE DAILYhive-net 639
~
~
4 623'19 640 622'34 630 21 22 23 24' 26.
636 640
'39
'627' 629 630 '
550
~
10 13
, 15
. 625 624 620 612 625 622 622 623 28 29 30 31 622
" '616 3.8 629 633 638
~ 4,l
Unit No.
3 reactor was operated at full power except'. for reducing load to perform the periodic turbine valve t,ests on June 27, 1975,
'I I'
Docket No.
50-250 UNIT.M1E Turke Point Unit No.
3 Jul
'1, 197 5 PREPARED BY Mar Lee Mont orner TELEPHONE
. '0 245-2910 Ext.
228 REPORT M3iVVH June',
'1975'NIT SHUTDOWNS/REDUCTIONS.
KO.
19 75-0 6-27 E
F-FORCED S-SCHEDULED DURATION HOURS)
'REASON ~
0 MF.THOD OF SHUTTING DO)(N THE REACTOR "*
N/A CO%1ENTS Load on Unit No.
3 reduced to perform periodic test of turbine main steam stop and control valves, reheat intercept and reheat stop valves.
'Non-Nuclear systems)
~
~
~
"'EASON:
A-EQJIPiK FAILURE (EXPLAIN@
B-i~fAINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINIiNG AND LICENSE EXAMINATION F-AD>HNISTRATIVE G-OPERATIOiAL ERROR H-OTHER (nPLAIN)
'i ** METHOD:
1-I ihXUAL 2-NIAL SQMi 3-AUTOMATIC SCRAM n
ENCLOSURE A DOCKET NO.
'UNIT NAME.
.EATH KM'LETED BY TELEPJ 10NE NO.
50-251 Turkey Point Unit No.
4
~July 1, 1975 Mary Lee Montomery (305 245-2910 Ext.
228
'DAILY UNIT'OWER OUTPUT N3NIH June 197 5 AVERAGE DAILY N<e-net DAY AVHBA(Z DAILYN<e-net 20 21
.22 36 143 407 10 13 24 25 26.
27 28 29 30 31 595
'526'83
" '66K
'6'63 15 19
I
ppcl',ET HO.
UNIr NAML:
~
~
DAIE 50-251 TURKEY POXNT JULY 1, 1975 NO 4
PORT HONTH JUNE 1975 CgsgiLI";I'IiD BY TELEIiHOVE Kh,RY LEE NONTC~OMERY 305 245-2910 Ext.
228 OPERATING S.TATUS REPORTING. PERIOD:
0001 75 06 01 TIIROUGH 2400'5 06 30'ROSS.
klOURS IN REPOI<TING PERIOD:
720:0 2.
CURRENTLY AUBIORIZED POKR LEVEL (gfg) 2200 MAX. DEPEND.
CAPACITY (Mfe NET)
POEM LEVEL TO NIICH RESTRICTED (IF ANY): (MVe NET) 4.
REASONS FOR RESTRICTIONS (IF ANY):
None TklIS MORI YR-TO-DATE'UiiULATIVE TO DATE 5.
NOSER OF HOURS 'IHE REACTOR WAS CRITICAL...........;.............;.;..
287. 9 6..
REACTOR RESERVE SMJIDO1% HOURS........ 2323.6 97.3 ll 657.4 97.3';
HOURS GENERATOR OiV LINE............;
8."
UNIT RESERVE SkIUTImh'N HOURS......;..
9.
GROSS TkIE15IAL EiVERGY GEiVERATED(M)H)..
10.
GROSS ELECTRICAL DiERGY GENERATED (P<IL 3
'fhILtg ll1 Il) ~
~
~
~
~
~
~
~
~ ~, ~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
ll:
NET ELECTRICAL ENERGY GENERATED (Mh'H) 12, RECTOR AVAILABLITY FACTOR Ql
- 13. 'NIT AVAILABILITYFACTOR Q2 218. 8 2232.0 115 098 1510 476 104 538 1429 108 40.0 30.4 53.5 51.4 354 306 4659 680 11 289.9 23 011 890 7 284 737 6
898 164
- 73. 4 71.1 14.
UNIT CAPACITY FACfOR J3,..............
f 15.
UNIT FORCED OUTAGE RATE g4 21.8 0.9 49.4 0.1 66.5 4.8 16.
SHtJID01NS SCHEDULED OVER. NEXT 6 MOiVVI1S (TYPE, DATE AND DURATION OF EACH):
None 17.
IF SHUTD01% AT END OF REPORT PERIOD, ESTDIATED DATE OF STARTUP:
REACTOR AVAILABILITYFACTOR I-IOURS REACTOR WAS CRITICAL X 100 GROSS HOURS IN REPOI<TIN PERIOD HOURS GEiVERATOR-ON LINE X-100 UNIT AVAILABILITYFACTOR GROSS HOUI~ IN I~~RT PERIOD FACTOR NET ELECTRICAI POWER GENERATED X 10 0 MAX. DLiPEiVDAHLE CAI'ACI'IY X GROSS HOURS IN REPORT PERIOD FORCED OtJTAGE HOURS X 100 kIOURS GENL'IKfOR ON I.IiVE +
FORCED OUTAGE lIOVIS
SUK~1ARY:
Unit. No.
4 was.returned to service on June 21, 1975 after completion of refueling'aintenance, and inspections.
Reactor was returned to full power based on performance of reactor physics test'program.
Unit No.'
performance was satisfactory ex'cept for mal-functions of heater drain pump discharge control valve actuator linkage on June 27, 1975.
and condenser tube leak on June 28, 1975.
REPORT ~oiiH June,'975 DATE-Jul:
1 1975 I
PREPARED BY TELEPHONE Mar Lee Yiont orner (3051 245-291 t.
2 Docket No.
50'-, 251
~,.- GAIT YME
-. Turke Point Unit No.
4 UN IT SHUTDONNS/RE'DUCT I ONS XO.
05 06 75-03-29 75-06-22 1
PE F-FORCED S-SCHEDULED S
2.7 B
DURATION 0-AMOURS)
REASON
- 496. 5 i~1ETHOD OF SHUTTING DO%if THE ACTOR
, N/A COP<ANTS Unit No.
4 was removed from service (de3.iberate manual shutdown) for refueling, maintenance and inspection:
{Nuclear and.non-Nuclear'.systems)
Unit No.
4 was removed from service to perform turbine overspeed trip test.
(Non-Nuclear system) 07 08 09 75-06-22 75-06-27 75>>06-28 2.0
>>0 A
A
~
N/A AN/A Load on Unit No.
4 was reduced to 54% R;P.. to clean steam generator feedwater pump No.
4A suction strainer.
{Non-Nuclear system).
Reactor tripped by steam generator No.
4A low level in coincidence with steam flow greater =than feedwater flow during transient caused by malfunction of heater drain pump discharge contiol valve actuator linkage.
(Non-Nuclear syst'm).
Load on Unit No.
4 was-reduced to 40$ R.P. to repair condenser tube leak (Non-Nuclear system)
REASON
'-EQJIPiiKNT FAILURE {'EXPLAIN/
B-iWINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER (EXPLAIN)
-; ** METHOD:
1-M4%JAL 2-h~egAL SCRui
~
. g A~~(<TIC'CRAM