ML19347A898

From kanterella
Revision as of 00:33, 3 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revision to Monthly Operating Rept for Aug 1980
ML19347A898
Person / Time
Site: Pilgrim
Issue date: 09/23/1980
From: Machon R
BOSTON EDISON CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19347A899 List:
References
80-232, NUDOCS 8009300500
Download: ML19347A898 (1)


Text

h*

C

{ gg(){} crapaw P!LGRIM NUCLtAR PCwcR start N A FC **1 RCCKY NiwL R C AG ALYMCUTd. MA33 AC *w 3rTT3 C 33 S O September 23, 1980 BECo Ltr. #80-232 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Comission Washington, D.C. 20555 Docket No. 50-293 License DPR-35

Subject:

August, 1980 Monthly Report (REVISED)

Dear Sir:

In accordance with PNPS Technical Specification 6.9.A.2, a revised copy of the Operational Status Sumary for Pilgrim Nuclear Power Station is attached for your infor=acion and planning.

This revision changes information on the Major Safety Related Maintenance Sheet.

The "cause" section of the battery charger and the "D" Relief Valve were in-advertently reversed.

Respectfully submitted, NJ R. D. Machon Nuclear Operations Manager Pilgrim Station GGW:ep pection and Enforcement Office of Nuclear Regulatory Comission U. S. Nuclear Regulatory Comission Washington, D.C. 20555 Director of Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, PA 19406 COh 5

.

//  ;

1 1

1 1

1 "UO9300$9 o