ML19347A898
| ML19347A898 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/23/1980 |
| From: | Machon R BOSTON EDISON CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19347A899 | List: |
| References | |
| 80-232, NUDOCS 8009300500 | |
| Download: ML19347A898 (1) | |
Text
h*
C
{ gg(){} crapaw P!LGRIM NUCLtAR PCwcR start N A FC **1 RCCKY NiwL R C AG ALYMCUTd. MA33 AC *w 3rTT3 C 33 S O September 23, 1980 BECo Ltr. #80-232 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Comission Washington, D.C.
20555 Docket No. 50-293 License DPR-35
Subject:
August, 1980 Monthly Report (REVISED)
Dear Sir:
In accordance with PNPS Technical Specification 6.9.A.2, a revised copy of the Operational Status Sumary for Pilgrim Nuclear Power Station is attached for your infor=acion and planning.
This revision changes information on the Major Safety Related Maintenance Sheet.
The "cause" section of the battery charger and the "D" Relief Valve were in-advertently reversed.
Respectfully submitted, NJ R. D. Machon Nuclear Operations Manager Pilgrim Station GGW:ep pection and Enforcement Office of Nuclear Regulatory Comission U. S. Nuclear Regulatory Comission Washington, D.C.
20555 Director of Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission 631 Park Avenue COh King of Prussia, PA 19406 5
//
1 "UO9300$9 o