ML19284A437

From kanterella
Revision as of 00:19, 9 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Board to Hold Public Hearing on Settlement Conditions at Site,Since All Buildings Are Affected.Requests Allowable Settlement Not Be Increased
ML19284A437
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/01/1979
From: Millar F
Potomac Alliance
To: Rosenthal A
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
Shared Package
ML19284A424 List:
References
NUDOCS 7903060412
Download: ML19284A437 (1)


Text

. - _ . , _ _

- ____

_

E , , - . . _ - =e

.

'

/

Chairman, Atomic Safety and Licensing Appeal Board '

=s I

,

fc.Y -

[,

ll

'

U.S. Nuclear Regulatcry Co==ission [ j/-

'dashington, D.C. o p.. f s

,

i A

Dea,r Sir W s As one of the citizen groups which was recently granted intervenor status in regard to the North Anna spent fuel co=paction issue (by decision of ALAB, January 26,1979), sa are very concerned about the status of the settlement issue at North Anna. 'de understand that two sets of Technical Specifications for the settlement limits at North Anna have been in errer as drawn up by the IUiC staff, and tha,t there is currently an investigation by the Justice Department of possible concealment by Vepco from the Atemic Safety and Licensing Board of settlement risks at the site.

In the Appeal Soard's current consideration of whether to double the allowable settlement to be alleued at the pg=phouse, we hope you will take into account the need of the public, especially in Virginia, to have utmost cenfidence that the se'tle=ent c situatien at North Anna i erifiably safe. Such assurance is not now available, especially in light f the conceal =ent by Vepco of the major singing cf August 1977 Our group asks the Boards (1) to hold a public hearing on sekle=ent conditions at North Anna as this affects all buildings on the site, including the spent fuel storage pool (2) not to increase the " allowable settlement" for the pcheuse before s_uch a hea d g.

'Ihank you.

Sincerely,

' A:knowk d;;:d by card. 3. /M. ... .....=

3 red Milla; (202) 462-1782 C. C '.

h. . M th . pb , W. ba bg.

7903060/(2 4 EO. Box 9306 Washington D.c. 20005