Annual Assessment Letter for Shearon Harris Nuclear Power Plant NRC Inspection Report 05000400/2014001
ML15063A309
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/04/2015
From: Hopper G
NRC/RGN-II/DRP/RPB4
To: Waldrep B
Progress Energy Carolinas
References
IR 2014001
Download: ML15063A309 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2014001

Dear Mr. Waldrep:

On February 11, 2015, the NRC completed its end-of-cycle performance review of the Shearon Harris Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, the Shearon Harris Nuclear Power Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

We also plan on conducting the following infrequently performed inspections and temporary instructions: Operator Licensing Exams; and TI 2515/191: Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4645 with any questions you may have regarding this letter.

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63 Enclosure: Harris Inspection/Activity Plan (03/01/2015 - 06/30/2016)

cc Distribution via ListServ

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE DXW4 JSD GTH NAME D. Jackson J. Dodson G. Hopper DATE 02/13/2015 03/04/2015 02/20/2015 E-MAIL COPY? YES NO YES NO YES NO Letter to Mr. Benjamin from George T. Hopper dated March 4, 2015.

SUBJECT: ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2014001 DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 Harris 03/04/2015 09:40:17 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ASM EP - 2015 EP ASM & RES BASELINE 3 1 01/01/2015 12/31/2015 IP 7111406 Drill Evaluation SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 04/13/2015 04/17/2015 IP 7111108P Inservice Inspection Activities - PWR ISI - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 04/13/2015 04/17/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK 1 2 1 04/13/2015 04/17/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/13/2015 04/17/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 04/13/2015 04/17/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/13/2015 04/17/2015 IP 71124.04 Occupational Dose Assessment 1 04/13/2015 04/17/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 04/13/2015 04/17/2015 IP 71151 Performance Indicator Verification RP - RP OCCUPATIONAL BASELINE WEEK 2 3 1 04/27/2015 05/01/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/27/2015 05/01/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 04/27/2015 05/01/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/27/2015 05/01/2015 IP 71124.04 Occupational Dose Assessment 1 04/27/2015 05/01/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 04/27/2015 05/01/2015 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSP 2 1 08/03/2015 08/07/2015 IP 7111111B Licensed Operator Requalification Program PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 09/14/2015 09/18/2015 IP 71152B Problem Identification and Resolution 1 09/28/2015 10/02/2015 IP 71152B Problem Identification and Resolution EP - EP EXERCISE 8 1 10/26/2015 10/30/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 10/26/2015 10/30/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1 10/26/2015 10/30/2015 IP 71151 Performance Indicator Verification MODS - PLANT MODIFICATIONS INSPECTION 3 1 11/16/2015 11/20/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1 12/07/2015 12/11/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Harris 03/04/2015 09:40:17 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ASM EP - 2016 EP ASM & RES BASELINE 3 1 01/01/2016 12/31/2016 IP 7111406 Drill Evaluation EP - EP PROGRAM INSPECTION 2 1 05/23/2016 05/27/2016 IP 7111401 Exercise Evaluation 1 05/23/2016 05/27/2016 IP 7111402 Alert and Notification System Testing 1 05/23/2016 05/27/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 05/23/2016 05/27/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 05/23/2016 05/27/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1 06/13/2016 06/17/2016 IP 7111107T Heat Sink Performance OL EXAM - INITIAL LICENSE EXAM PREP 3 1 06/13/2016 06/17/2016 V23474 HARRIS JULY 2016 INITIAL EXAM AT POWER FACILITIESS This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.