Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
M01'T)ILY RrPORTS (FOR GRAY BOOK PREPARA'1'IO D - BIBUTIQN FOR PART 50 DOCKEl ~IATERIAL
'BC (TEMPORARY FORM)
CONTROL NO. 11985 .
Fl LF hfONTI1LY PEPORT FILE
~
F ROM: Fl ordi a Power 8 Li ght Co. DATE OF DOC DATE REC'D LTR TWX OTHER Miami, Flordia TO: ORIG CC OTHER NRC 1 S'i ned 0 CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXX 1 50-250 DESCRIPTION: ENCLOSURES:
Ltr trans the following: hlonthly Report for September 1975 Plant & Conponent Operability & Availability This Report to be used in preparing Gray Book by Plans & Operations.
NUhIBER OP COPIES REC'D:
PLANT NAME: Turkey Point 3 It' FOR ACTION/INFORMATION SAB 10-15-75 BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)
W/ Copies W/ Copies LV/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) ]LEAR (L)
W/ Copies W/ Copies VASSALLO (L)
W/ Copies KNIGHTON (E)
W/ CopiesDP SPELS NOT H;EMOVE PARR (L)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E)~ hHPC/PH W/ Copies W/ Copies W/ Copies W.'l> Copies +CENO+/K INTERNAL DISTR I BUl ION G FIL TECH REVIEW DENTON LIC ASST A/T IND .
~N SCHROEDER G R IMES R. DIGGS (L) BRAITMAN OGC, ROOM P-506A. MACCARY GAMMILL H. GEARIN (I ) SALTZMAN GOSSI CK/STAF F KNIGHT KASTNER E. GOULBOURNE (L) ME LTZ CASE PAWLICKI BALLARD P. KBFUTZER (E)
GIAMBUSSO SHAO SPANGLER J. LEE (L) PLANS BOYD IVlOORE (L)
STELLO HOUSTON ENVIRO M. Rd"lBRCCK (L)
S. REED (E)
~~CHAPMAN MCDOIiIALD DEYOUNG (L) NOVAK MULLER M. SEBVICF. (L) DUBE (Ltr)
SKOVHOLT- (L) ROSS DICKER S. SIIEPPARD (L) E.,COUPE GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E) PETERSON P. COLLINS TEDESCO YOUNG 8 LOOD H. SMITH (L) HARTFIELD (2)
DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR - LAINAS PROJECT LDR G. WILLIAMS(E) EISENHUT Fll F. 5 REGION (2) BENABOYA V. WILSON (L) WIGGINTON VOLLMER HAR LESS gR. INGRAM (L)
STEE LE M DUh'CAN EXTERNAL DISTRIBUTION
~1 LOCAL PDR Ming Flordia P D R-SAN/LA/NY
~1 TIC (ABEBNATIIY) (1){2)(10) NATIONALLABS.Bm E-201 GT 1
BROOKHAVEN NAT LAB
~l NSIC (BUCHANAN)'
1 ASLB 1 W. PENNINGTON, CONSULTANTS 1
1 G. ULRIKSON, OBNL 1 Newton Anderson NEWM ARK/BLUME/AGBABIAN 1 AGMED (RUTH GUSSMAN)
ACRS I IOLD ING/SENl Rm 8-127 GT J. D. RUNKLES, Rm E-201
@I 1 GT
4 P.O. BOX 3100 MIAMI, FLORIDA 33101 FLORIDA POWER 5 LIGHT COMPANY October 9, 1975 Office of Management Information 4Bifqgc~.
and Program Controls U. S. Nuclear Regulatory Commission Washin'gton, D. C. 20555 Gentlemen:
Attached are the September, 1975 Operating Status Reports for Turkey Point Unit Nos. 3 and 4.
Very truly yours,
. D. chmidt Vice President Power Resources gg ~
I0 VTC/cpc ~ " ~'LI;g:iIIN0'I Sgtii'3<~'+
Attachments \
cc: hfr. Norman C. Moseley Jack R. Newman, Esquire
'i~/~
/
iD .
@soar.
OOT45$ 76~ =>
1 qf
,.I 6 (
>~
1
~ >
HELPING BUILD FLOFIIDA
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turkey Point Unit No. 3 DATE October 6 1975 COMPLETED BY Varylee Montgomery TELEPHONE (305) 245-2910 Ext. 228 MONTH Seotember 1975 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 647 638 648 18 641 19 610 611 . 20 '03
~
697 21 512 650 .22 628 643 23 .6 640 24 65 642 626 10 645 26 600 647 27 636 12 647 2S 639 13 643 2S 636 14 641 30 373 643 16 642
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50-250 UNIT Turkey Point Unit No. 3 DATE October 6 1975 COMPLETED BY Mar lee Mont ornery TELEPHONE 305 245-2910 Ext. 228 OPERATING STATUS thru 2400,75,09,30 PERI'OD'001'5>09p01 / GROSS HOURS IN REPORTING PERZQD4 720400 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 MAX. DEPEND. CAPACITY (MWe-Net): 666 DESIGN ELECTRICAL RATING (MWe-Net):
3; POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None 4~ REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 718.g 6296.2 20324.9 6 REACTOR RESERVE SHUTDOWN HOURS... ~ .. . LINE..................
7~
8 HOURS GENERATOR ON UNIT RESERVE SHUTDOWN HOURS........ . . ~
'0-717.2 6194.0 19612. 3 85.0
>>6>>8 ~96 558 8 10 'ROSS ELECTRICAL ENERGY GENERATED (MWH).. 463 928 4 128 994 ll 556 799 ll NET ELECTRICAL ENERGY GENERATED (MWH).... 440 276 3 949,751 10,930,916
- 12. REACTOR SERVICE FACTOR...........;...... ~ 99.8 96.1 82.1
- 13. REACTORI AVAILABILITYFACTOR............. ~ 99.8 96.1 82.1 14 ~ UNIT SERVICE FACTOR..................... 99.6 94.6 79. 3
- 88. 6 94.6 79.6
- 16. UNIT CAPACITY FACTOR (Using MDC).. ~ .....- 91.8 90.5 67.7
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 88.2 87. 0 64.9 18 'NIT FORCED OUTAGE RATE............ ..... 0.4 3.4 4.0 19 'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
October 27 . December 7, 1975 Refueling, Maintenance, and Inspection 20 ~ 'F 'I SHUTDOWN AT END OF PURPORT PERIOD t ESTIMATED DATE OF STARTUP 214 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
-8 669884~
8.
88946M ' I84 '4. ~ 6 5'p 4 I
~ ( ~
0*'A Wttt
ii APPENDIXa D DOCKET NO. Q 2'P
);) REASON UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point Unit, No. 3 A: EQUI PLANT FAILURE (EXPLAIN) i B: FAINT. OR TEST i . DATE October 6 1975 C: REFUELING D REGULATORY RESTRICTION COMPLETED. BY Marylee Montgomery E: OPERATOR TRAINING AND LICENSE EXAMINATION TFLEPHONE 305) 245-2910 Ext. 229 Ft ADMINISTRATIVE REPORT MONTH September, 1975 G: OPERATIONAL ERROR (EXPLAIN)
H: OTiiER (EXPLAIN)
~)' METHOD METHOD OF 1: YJZ>UAL TYPE SHUTTING DOWN 2: MANUAL SCRAM Fi FORCED DURATION THE REACTOR OR 3! AUTOMATIC SCRAM NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS COMMENTS 4: OTHER (EXPLAIN)
Turbine was tripped on steam generator: No. 3B high-high 1<<el 28 75-09-1 2.8 A caused by the failure of steam generator No. 3B feedwat~
control valve actuator linkage. Turbine trip caused reaMor trip. Corrective action was to repair the failed linkage.
(NON-NUCLEAR SYSTEM) e 29 75-09-2 >>0- Load on Unit No. 3 wa's maintained below 505 R.P. because the indicated axial flux difference was outside the target band f more than sixty effective minutes (cumulative) out of the preceding 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period. (NUCLEAR SYSTEM) 30 75-09-2 .A Load on Unit No. 3 was manually reduced to approximately 504 R.P. to investigate and correct condenser tube leak.
Corrective action was to locate and plug the leaking condense tube. (NON-NUCLEAR SYSTEM) 4 31 5-09-30 A Load on Unit No. 3 was manually reduced to approximately 50$
R.P. to investigate and correct condenser tube leak.
Corrective action was to locate and plug the leaking coense tube. (NON-NUCLEAR SYSTEM) sulBIARY: 'nit No. 3 operated at 1005 R.P. for entire month except for turbine-rea ctor 'trip on September 19, 1975, 505 R.P. load restriction on September 20, 1975, and load reductions to.repair condenser tube leaks on September 26, and 30, 1975.
I APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point Unit No. 4 DATE October 6, 1975 COMPLETED BY Marylee Montgomery TELEPHONE 05 2 -2 10 Ext. 228 MONTH September 1975 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t) (MWe-Net) 6 8 17 597 638 18 603 348 19 595 496 20 596 599 606 22 606 23 24 608 -25 10 604 26 615 27 12 613 28 13 610 14 602 30 15 599 16 601
APPENDIX C
~ OPERATING DATA REPORT DOCKET NO. 50-251 UNIT Turkey Point Unit No. 4
'DATE October 6 1975
- ~59:
COMPLETED BY Mar lee Mont ornery TELEPHONE 305 245-2910 Ext. 228 OPERATXNG STATUS thru 2400,75,09,30 7
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 MAX. DEPEND. CAPACITY (MWe-Net): 666 DESIGN ELECTRICAL RATING (MWe-Net):
- 3. POWER LEVEL TO WHZCH RESTRICTED {XF ANY) (MWe-Net): None 4~ REASONS FOR RESTRICTXON (ZF ANY) s THIS MONTH YEAR TO DATE CUMULATXVE
- 5. 'NUMBER OP HOURS REACTOR WAS CRITICAL .... 480.6 4143.9 ~P
- 6. REACTOR RESERVE SHUTDOWN HOURS........... 97.3 97.3
- 7. HOURS GENERATOR ON LINE................I
~ . 473.7 4035.4 13093.2 8~ UNIT RESER~ SHUTDOWN HOURS... ~ .. -0~ 9. GROSS THERMAL ENERGY GENERATED (>AH)..... 990883 8541709 26893919
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH).. 299140 2702476 , 8476737 ll. NET ELECTRICAL ENERGY GENERATED (MWH).... 282212 2559218 8028274 12 REACTOR SERVICE FACTOR .. . .......... 66.8 63.3 74;5
- 13. REACTOR AVAILABXLZTYFACTOR..... .. ~ . 66.8 64.7 75.0 14 UNIT SERVXCE FACTOR........... .......... 65.8 61.6 72.4 AVAZLABILXTYFACTOR............. ... 65.8 61.6 72.4
'5.
UNIT ~
- 16. UNXT CAPACXTY FACTOR (Using MDC)......... 58-9 58.7 67.7 .
'7. UNIT CAPACITY FACTOR (Using Design MWe).. 56.4 65.1
- 18. UNIT FORCED OUTAGE RATE...... . . . . 1.8 0.4 3.9 19m SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATEg AND DURATION OF EACH):
None 20 XF sHUTDowN AT END QP REPoRT PERzoD, EsTIMATED DATE QF sTARTUP: October 1 1975 2lo UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRXTXCALITY INITIAL ELECTRXCITY COMMERCIAL OPERATION
APPENDIX D DOCKET NO, 9U-deal ON UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point Unit No. 4.
EQUIPetgXNT FAILURE (EXPLAIN) t k'B: MAINT OR TEST I . DATE October 6 1975 Ic: REFUELING t;:D: REGULATORY RESTRICTION COMPLETED. BY Viar lee Vont orner OPZFZtTOR TRAINING AND LICEaeSE EXiQ1INATION TELEPHONE 305 245-2910 Ext. 228 L-'F: ADMINISTRATIVE 975 5G: OPERATIONAL ERFOR (EXPLAIN) PAGE ONE OF TI'10 OTHER (EXPLAIN)
LPETHOD METHOD OF real w MÃUAL TYPE SHUTTING DOWN j2 MANUAL SCRAM F! FORCED DURATION THE REACTOR OR AUTOMATIC SCRAM NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS/COMMENTS jg: OTHER (EXPLAIN) 13 75/09/0 2.3 .A Reactor was tripped on steam generator No. 44 low level, coincident with steam flow greater than feedwater flow cau by a transient condition on steam generator feedwater pu=p suction header associated with the failure of the mechanical fasteners on steam generator No. 4A feedwater control valve actuator connection to valve body. Corrective action was to install new mechanical fasteners, align the actuator with the valve body, and torque the mechanical fasteners to the proper valves.. (NON-NUCLEAR SYSTEM) 75/09/0 4.7 A Turbine was tripped on steam generator No. 4A high-high level caused by the failure of steam generator No. 4A bypass feed-water system control valve positioner drive arm. Turbine trip caused reactor trip. Corrective action was to install new positioner drive arm. (NON-NUCLEAR SYSTEM) 15 5/09/03 1.6 A Turbine was trapped on steam generator No. 4A high-high level caused by the failure of steam generator No. 4A bypass fee~
water system control valve positioner drive arm. Turbine caused reactor trip. Corrective action was to install t~
a new WV VtTVn nV Pare Unit, No. 4 operated at an average reactor power level of 975 R.p. except'for unit, shutdovms on September 4, 1975, load reduction on Septem'ber 5, 1975, and scheduled maintenance outage beginning Septem'ber 21, 1975.
I APPENDIX D DOCKET NO K) MASON UNIT SHUTDOWNS AND POWER REDUCTIONS Turkey Point Unit No. 4 g>>. ~
C'e A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST . DATE October 6 1975 C: FEE'UELING D: REGULATORY RESTRICTION COMPLETED .BY Mar lee>>Mont orner E: OPEFATOR TRAINING AND LICE".S XAIQNATION TELEPHONE 305 245-2910 Ext. 228 AD!~INISTRATIVE REPORT MONTH September 1975 OPERATIONAL ERROR (EXPLAIN) PAGE TWO OF TRIO OTHER (EXPLAIN)
L.
I) P~HGD ':
METHOD OF RITUAL TYPE SHUTTING DOWN UAL SCRAM F: FORCED DURATION THE REACTOR OR 3 AUTO!y>TIC SCRM NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER(?) CORRECTIVE ACTIONS/COMENTS 4! OTHER (EXPLAIN) g 15 CO TINUED FROM PAG ONE ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ poeitioner drive arm and properly align the oontrol val+
positioner with the valve body. (NON-NUCLEAR SYSTEM) 16 5/09/04 A Load on Unit No. 4 .was manually reduced to approximately 255 to investigate apd correct problem with the control signal to No. 4C feed'water control valve positioner.
Corrective action was to install a new pressure the bourdon-tube element on the existing gauge'ecause pressure gauge was leaking. (NON-NUCLEAR SYSTEM) 17 5/09/21 S 237 5 A Unit No. 4 was removed from service (controlled manual shut-down) to repair steam generator No. 4B tube leak (small leak in one of 3,260 tubes). There were no significant quantities of radioactive material released as a resu1t of this small leak. (NUCLEAR SYSTEM)