Forwards Interim Deficiency Rept Re Omission of Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall.Corrective Action Will Be Completed 800630 & Final Rept Will Be Submitted
ML18017B075
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/13/1980
From: CHIANGI N J
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18017B076 List:
References
SH-N-2-18, NUDOCS 8005200520
Download: ML18017B075 (4)


Text

REGULATOR NFORMATION DISTRIBUTION TEM (RIDS)ACCESSION NBR:8005200520 DOC~DATE: 80/05/13 NOTARIZED'O FACIL:50 400 Shearon Harris Nuclear Power Plant~Unit ir Carolina 50 401 Shearon Harris Nuclear Power Plantr Unit 2r Carolina 50~402'Shearon Harris Nuclear Power Plantr Unit 3r Carolina AUTHRNAME AUTHOR AFFILIATION CHIANGIiN,J.

Carolina Power Ij'ight Co, REC IP~NAME RECIPIENT AFFILIATION OiREILLYe JBPB Region 2i Atlanta'ffice of the Director DOCK¹050 0401 05000402 50/4'3 SUBJECT!Forwards interim deficiency rept fe ommission of reinforcing steel in Unit 1 containment bldg exterior: wall, Corrective action will be completed 800630 8 final rept will be submitted.

DISTRIBUTION CODE: BOIGS COPIES RECEIVED:LTR J.ENCL I.SIZE: J TITLE!Construction Deficiency Report (10CFR50~55E)N CQ~~WWp~WWH&&WAaf&W&Wt&lflll&&eOIO&OI&fa&~&te&Pt&~&OPO+%&OtW RECIPIENT ID CODE/NAME ACTION: 14 PM Q<y4g~20 LA g g)p INTERNAL 01 05 IIt'8 MPA 10 GAB 13F IELD COOR/IE 17 AD PLANT SYS 22 DIR DPM AD/RCI/IE AEOD GEOSCIENCES BR ISC SYS BR MECH ENG BR STRUCT ENG BR EXTERNAI'3 LPDR 24 ACRS COPIES'TTR ENCL 1 1>'E 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16 16 RECIPIENT ID CODE/NAME-.

15 BC'~R-3'1 ADE.Qg.02 NRC PDR 57 EDO 8 STAFF 09 DEPY DIR~DPM 11 STANDRDS DEV 16 AO FOR ENGR 17 AO REAC SFTY 23 OELD AD/SITE TECH DIRECTOR DSE HARA ERpS, NATL"ENG BR PONER SYS BR 04 NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAY 22 1980 TOTAL NUMBER OF COPIES REQUIRED t LTTR 48 ENCL 48 n ll p',)'A I:))II-'I lt 7~k lf II 1$c"'ii lP-J C r~+a~PI r kc aC'Q'[~V II FORM 21.5+A~CII@L 8605200&I Carolina Power&Light Company Raioigh, N.C, 2?602.Pile: SH N-2/18 May 13, 1980 Mr.James P.O'Reilly United States Nuclear Regulatory Commission Region II 101 Mirietta Street, W Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POSER PLANT UNITS 1, 2, 3, AND 4 DOCKET NOS, 50-400, 50-401, 50-402, 50-403 OMISSIOH OP REBAR IN UNIT III1 CONTAINMENT BUILDING INTERIM REPORT Dear Mr.O'Reilly's Attached is an interim report on the omission of reinforcing steel in the Unit 81 containment building.exterior wall.Implementation of the corrective action is in progress.It is anticipated that comple-tion of corrective action will be accomplished by June 30, 1980, at which time the final 10CPR50.55(e) report will be submitted.

If you have any questions regarding this matter, please do not hesitate to contact me.KVH/gc 458-256)Attachment Yours very truly, Original Signed BY N~.Chiangi H.J.Chiangi-Manager Engineering

&Construction Quality Assurance cc: Mr.V.Stello (2)9/Av golf I/t

'/~I/I'Ij'IJP i)IP f Q W)J)I, g L Jll')aILJJ."+e I)J ll),'i)J'S>g<P-fy'f k'.L-y~~)~l JI J Ig I4 g'Pl.t*I t L 4 JJI~4 d I L f)j Iy')J'J))g)JL j,+)F~'.LPf)II'I<f I)II'IJ>P HAJJ)++J)i)I'If gf IIIP J<~Ij),'I ()()'I)g f lg I'l fear).")<>l 1 J JLIIP7tge,~~.lIJ)$'g j,)$1 J I)Ill'$',III I II II)M J")'j lf" y+L))JQ I)II V