Forwards Interim Deficiency Rept Re Omission of Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall.Corrective Action Will Be Completed 800630 & Final Rept Will Be Submitted
ML18017B075
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/13/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18017B076 List:
References
SH-N-2-18, NUDOCS 8005200520
Download: ML18017B075 (4)


Text

REGULATOR NFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:8005200520 DOC ~ DATE: 80/05/13 NOTARIZED'O DOCK ¹ FACIL:50 400 Shearon Harris Nuclear Power Plant~ Unit ir Carolina 50 401 Shearon Harris Nuclear Power Plantr Unit 2r Carolina 050 0401 50~402'Shearon Harris Nuclear Power Plantr Unit 3r Carolina 05000402 AUTHRNAME AUTHOR AFFILIATION 50 /4'3 CHIANGIiN,J. Carolina Power Ij'ight Co, REC IP ~ NAME RECIPIENT AFFILIATION OiREILLYeJBPB Region 2i Atlanta'ffice of the Director SUBJECT! Forwards interim deficiency rept fe ommission of reinforcing steel in Unit 1 containment bldg exterior: wall, Corrective action will be completed 800630 8 final rept will be submitted.

DISTRIBUTION CODE: BOIGS COPIES RECEIVED:LTR J. ENCL I. SIZE:

TITLE! Construction Deficiency Report (10CFR50 ~ 55E)

J N CQ ~

~ WWp~WWH&&WAaf&W&Wt&lflll&&eOIO&OI&fa&~&te&Pt&~&OPO+%&OtW RECIPIENT COPIES'TTR RECIPIENT COPIES ID CODE/NAME ENCL ID CODE/NAME-. LTTR ENCL ACTION: 14 PM Q<y4g~ 1 1> 'E 15 BC'~R-3'1 1 20 LA g g)p 1 ADE.Qg. 1 1 INTERNAL 01 1 1 02 NRC PDR 1 1 05 IIt'8 2 2 57 EDO 8 STAFF 1 1 MPA 1 1 09 DEPY DIR~DPM 1 1 10 GAB 1 1 11 STANDRDS DEV 1 1 13F IELD COOR/IE 1 1 16 AO FOR ENGR 1 1 17 AD PLANT SYS 1 17 AO REAC SFTY 1 1 22 DIR DPM 1 23 OELD 1 1 AD/RCI/IE 1 1 AD/SITE TECH 1 1 AEOD 1 1 DIRECTOR DSE 1 1 GEOSCIENCES BR 1 1 HARA ERpS, 1 ISC SYS BR 1 NATL"ENG BR MECH ENG BR 1 1 PONER SYS BR 1 1 STRUCT ENG BR 1 1 EXTERNAI '3 LPDR 24 ACRS 16 1 1 16 04 NSIC 1 1 MAY 22 1980 TOTAL NUMBER OF COPIES REQUIRED t LTTR 48 ENCL 48

n ll I II -'I

))

p',) 'A lt 7~

k lf r

II 1$

c" 'ii lP- J kc aC 'Q C

r ~

~+a PI

'[~V II

8605200& I FORM 21.5+A

~ CII@L Carolina Power & Light Company Raioigh, N. C, 2?602

. Pile: SH N-2/18 May 13, 1980 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Mirietta Street, W Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POSER PLANT UNITS 1, 2, 3, AND 4 DOCKET NOS, 50-400, 50-401, 50-402, 50-403 OMISSIOH OP REBAR IN UNIT III1 CONTAINMENT BUILDING INTERIM REPORT Dear Mr. O'Reilly's Attached is an interim report on the omission of reinforcing steel in the Unit 81 containment building. exterior wall. Implementation of the corrective action is in progress. It is anticipated that comple-tion of corrective action will be accomplished by June 30, 1980, at which time the final 10CPR50.55(e) report will be submitted.

If you have any questions regarding this matter, please do not hesitate to contact me.

Yours very truly, Original Signed BY N ~. Chiangi H. J. Chiangi - Manager Engineering & Construction Quality Assurance KVH/gc 458-256)