Clarifies Request for Extension of CP in Support of Const Schedule Reported in 840123 Const Status Rept.Util Firmly Committed to June 1985 Fuel Load Date
ML18018B627
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/10/1984
From: MCDUFFIE M A
CAROLINA POWER & LIGHT CO.
To: DENTON H R
Office of Nuclear Reactor Regulation
References
NLS-84-153, NUDOCS 8404200078
Download: ML18018B627 (4)


Text

REGULATORY Ii ORMATION DISTRIBUTION SYSl i (RIDS)~A.ACCESSION NBR;,B404200078 DOC~DATEt 84/04/10 NOTARIZED; NO DOCKET FACIL;50 40'hearon Harris Nuclear Power Plant~Unit ii Carolina O5000400 AUTH, NAPE AUTHOR AFFILIATION MCDUFFIEpM

~A Carol ina Power L Light Co~RECAP~NAME RECIPIENT AFFILIATION DENTONiH,RE Office-of Nuclear Reactor Regulationr Director-

SUBJECT:

Clarifies request for extension of CP in-support of const schedule reported in 840123 const status rept, Util firmly committed to June 1985 fuel load date+DISTRIBUTION CODE: B001S COPIES RECEIVED;LTfk ENCL SIZE'ITLE:

Licensing Submittal'SAR/FSAR Amdts L Related Corr espondence'OTES:

RECIPIENT ID CODE/NAME NRA/DL/ADL NRR LB3 lA INTERNALS ELo/HDS1 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/CEB 11 iVRA/DE/EQB 13 NRA/DE/MEB 18 NRf)/DE/SAB 24 NRR/DHFS/HFEB40 NRA/DHFS/PSRB NRR/DS I/AEB 26 NRA/DSI/CPS 10 NRA/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23 RGN2 EXTERNAL: ACRS 41 DMB/DSS (AMDTS)LPf)R 03 NSiC 05 COPIES I.TTR EN 1 1 1 1 1 1 1 1 1 1 i 1 3 REC IP IENT ID'CODE/NAME NRR LB3 BC BUCKLEYtB 01 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 iVRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/Dl/SSPB NRR/DS I/ASB NRR/DSI/CSB 09 NRR/DS I/METB 12 N RAB 22 RE F IL 04 AMI/MIB BNL(AMDTS ONlY)FEMA REP.DIY 39 NRC PDR 02 NTIS COPIES LTTR ENC 1 1 1 1 1 1 TOTAL NUMBER OF COPIES REQUIRED o LTTR 53 ENCL C Lt N C f')I lt', f l')N a jr)N I">>)Ij Ij r~g t Ilt)tl>>)I NNI lip j fi jj'N~')I (r'))t'j grt'r)t.f Iju N'Ig I),')Q f I'Ij II gA III I)N>>Itt 7 j X.0)'I'I k>>.I MMt~t t>>%~Mu ruM~(Nif,',.j-t))rt<<"~a'1)),l 9gflf~j~>>>>rl Ir p j'rlr<<lj l I"J III'ff lr)>>1$I II t'lj t>>f (j jf,V f.'I'I I Ijfj)'I II)'l I u,)jf tl if'li jj I, 4 J<P, cx jl JI R L I R I I'i jf jr fiN NI rl,iINjlr fa i, J'>>N, II,', q Iy<y jf r I n N M ij, x Ittlf, I('j j'~I j'I IM r't

~t'i CRQE, Carolina Power&Light Company APR 10 1984 SERIAL: NLS-84-153 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO~1-DOCKET NO~50-400 CONSTRUCTION PERMIT EXTENSION

REFERENCE:

(1)March 16, 1984 Letter/M.A.McDuffie to H.R.Denton (2)January 23, 1984 Letter/S.R.Zimmerman to R.A.Hartfield,

Dear Mr.Denton:

Carolina Power&Light Company (CPSL)hereby clarifies that the request for extension of the construction permit for the Shearon Harris Nuclear Power Plant (Reference 1)is in support of the construction schedule reported in the latest construction status report (Reference 2).This request in Reference 1 is consistent with the construction schedule shown in Reference 2.Carolina Power 6 Light Company remains firmly committed to a fuel load date of June, 1985.Should you have any questions regarding this matter, please contact my staff.Yours very truly, M.A.McDuffie Senior Vice President Nuclear Generation PSA/cfr (9805PSA)Cct Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)

Mr.J.P.O'Reilly (NRC-RII)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)

Chapel Hill Public Library Wake County Public Library Mr.Wells Eddleman Dr.Phyllis Lotchin Mr.John D.Runkle Dr.Richard D.Wilson Mr.G.0.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)8404200078 840410!PDR ADOCK 05000400 A PDR 411 Fayetteville Street o P.O.Box 1551 o Raleigh, N.C.27602 I)r