Clarifies Request for Extension of CP in Support of Const Schedule Reported in 840123 Const Status Rept.Util Firmly Committed to June 1985 Fuel Load Date
ML18018B627
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/10/1984
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-84-153, NUDOCS 8404200078
Download: ML18018B627 (4)


Text

REGULATORY Ii ORMATION DISTRIBUTION SYSl i (RIDS) ~A.

ACCESSION NBR;,B404200078 DOC DATEt 84/04/10 NOTARIZED; NO DOCKET FACIL;50 40'hearon Harris

~

Nuclear Power Plant~ Unit ii Carolina O5000400 AUTH, NAPE AUTHOR AFFILIATION MCDUFFIEpM ~ A Carol ina Power L Light Co ~

RECAP ~ NAME RECIPIENT AFFILIATION DENTONiH,RE Office- of Nuclear Reactor Regulationr Director-

SUBJECT:

Clarifies request for extension of CP in -support of const schedule reported in 840123 const status rept, Util firmly committed to June 1985 fuel load date+

DISTRIBUTION CODE: B001S COPIES RECEIVED;LTfk ENCL Licensing Submittal'SAR/FSAR Amdts L Related Corr SIZE'ITLE:

espondence'OTES:

RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME I.TTR EN ID'CODE/NAME LTTR ENC NRA/DL/ADL 1 NRR LB3 BC 1 NRR LB3 lA 1 BUCKLEYtB 01 1 INTERNALS ELo/HDS1 1 IE FILE IE/DEPER/EPB 36 IE/DEPER/IRB 35 IE/DQASIP/QAB21 1 NRR/DE/AEAB NRR/DE/CEB 11 1 NRR/DE/EHEB iVRA/DE/EQB 13 NRR/DE/GB 28 NRA/DE/MEB 18 1 iVRR/DE/MTEB 17 NRf)/DE/SAB 24 NRR/DE/SGEB 25 NRR/DHFS/HFEB40 NRR/DHFS/LQB 32 NRA/DHFS/PSRB 1 NRR/Dl/SSPB NRR/DS I/AEB 26 1 NRR/DS I/ASB NRA/DSI/CPS 10 1 NRR/DSI/CSB 09 NRA/DSI/ICSB 16 1 NRR/DS I/METB 12 NRR/DSI/PSB 19 i N RAB 22 NRR/DSI/RSB 23 1 RE F IL 04 RGN2 3 AMI/MIB EXTERNAL: ACRS 41 BNL(AMDTS ONlY) 1 DMB/DSS (AMDTS) FEMA REP .DIY 39 1 LPf)R 03 NRC PDR 02 1 NSiC 05 NTIS 1 TOTAL NUMBER OF COPIES REQUIRED o LTTR 53 ENCL

C C

f')I N

Lt N lt f l ') a jr' ')N I" >>

)

)'I Ij Ij r

~ g t Ilt

)

t l fi jj'

>>) I NNI lip j N (r') )t 'j grt' r)t. f Iju N'Ig gA I

),') Q f I'Ij II 'I k>>

~ '

)I III I)N>> Itt 7 j X.0

. I MMt ~ t t>>% ~~ ( Nif,', .

Mu ruM

~>>

>>rl Ir p j'rlr<<lj l I "J III'ff j-t))rt <<" ~a'1)),l 9gflf~ j lr)>> 1$ I II t'lj t>> f (j jf,V f. 'I' I I Ijfj)'I II) '

l I u,)

jf tl if 'li I, 4

jj J<

P, n

N M jr fiN jf cx R jl L I

JI

>>N, fa II, ', q R i, I

I'i NI J' Iy<y rl,iINjlr jf r I ij, x IM Ittlf, I( 'j j '~ I j

'I r't

~ t

'i CRQE, Carolina Power & Light Company SERIAL: NLS-84-153 APR 10 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO ~ 1 DOCKET NO ~ 50-400 CONSTRUCTION PERMIT EXTENSION

REFERENCE:

(1) March 16, 1984 Letter/M. A. McDuffie to H. R. Denton (2) January 23, 1984 Letter/S. R. Zimmerman to R. A. Hartfield,

Dear Mr. Denton:

Carolina Power & Light Company (CPSL) hereby clarifies that the request for extension of the construction permit for the Shearon Harris Nuclear Power Plant (Reference 1) is in support of the construction schedule reported in the latest construction status report (Reference 2).

This request in Reference 1 is consistent with the construction schedule shown in Reference 2. Carolina Power 6 Light Company remains firmly committed to a fuel load date of June, 1985.

Should you have any questions regarding this matter, please contact my staff.

Yours very truly, M. A. McDuffie Senior Vice President Nuclear Generation PSA/cfr (9805PSA)

Cct Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Dr. Phyllis Lotchin Mr. J. P. O'Reilly (NRC-RII) Mr. John D. Runkle Mr. Travis Payne (KUDZU) Dr. Richard D. Wilson Mr. Daniel F. Read (CHANGE/ELP) Mr. G. 0. Bright (ASLB)

Chapel Hill Public Library Dr. J. H. Carpenter (ASLB)

Wake County Public Library Mr. J. L. Kelley (ASLB) 8404200078 840410  !

PDR ADOCK 05000400 A PDR 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602

I

)r