Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20126D19012 August 1977PNO-77-143:Pacific Pump Co Supplied Facilities W/Production Lot of 40 Pumps Mfg Using Shafts Made of Inferior Matl. Cause Unstated.All Utils W/Pumps Were Notified.Nrc Headquarters Notified on 770812
ML20134A97511 August 1975PN-III-75-027:during Predocket Insp,Several QA Deviations Identified Leading to Conclusion & Recommendation to Reject Tendered Application
ML20135G57913 September 1985PNS-V-85-004:on 850913,two Telephone Threats Received from Unidentified Caller.Searches Found No Bomb.Air Force Bomb Sniffing Dogs & Handlers Enroute to Site.Plant & Surrounding Facilities Evacuated
ML20136B03014 November 1985PNS-V-85-005:on 851113,two Contractors from Nuclear Power Svc Allowed Access to Proctected Area W/O Being Searched or Badged.Contractors Discovered by Nuclear Power Svc Supervisor & Escorted to Access Control Area
ML20136J1065 January 1986PNO-IIT-86-001A:on 851226,loss of Integrated Control Sys Occurred.Caused by Simultaneous Deenergizing of All Redundant Dc Power Supplies.Licensee Preparing Action Plans for Systematic Troubleshooting.Sequence of Events Encl
ML20137G8979 January 1986PNO-IIT-86-001B:on 851228,Incident Investigation Team Began Investigation Into 851226 Loss of Power to Integrated Control Sys Reactor Trip on High Pressure & Rapid Cooldown Following Reactor Trip
ML20138E1946 December 1985PNS-V-85-006:on 851206,util Notified NRC of Arrest of Five Individuals,Including Three Plant Security Employees,For Use & Sale of Narcotics During 3-wk Period Ending 851205.No Evidence of Use of Narcotics at Plant Site Identified
ML20140F5934 February 1977PNO-77-022:on 770204,reactor Scrammed When Torus Temp Increased to 110 F.Caused by Two Target Rock Safety/Relief Valves Opening W/O Reseating Until Pressure Decreased to 100 Psig.Reactor Placed in Cold Shutdown
ML20140G32527 November 1974PNO-74-136:on 741124,during Startup Tests of Main Steam Relief Valves at 75% Power,Target Rock Safety Relief Valve Failed to Reseat.Cause Not Stated.Valve Will Be Replaced
ML20140G34321 July 1975PNO-75-053:on 750720,during Attempt to Reseat Leaking Relief Valve D,Valve Manually Actuated & Did Not Reseat.Reactor Manually Scrammed.Investigation Continuing
ML20147H0841 March 1988PNS-V-88-001:on 880229,plant Notified of Bomb Threat. Licensee Conducted Routine Search,Found Three Suspicious Packages.Packages Examined & Found to Be Innocuous
ML20151X52427 June 1977PNO-77-114:on 770624,unplanned Release of Airborne Radioactivity Was Reported When Craft Personnel of Contractor (Scott Co) Attempted to Repair Inward Buckling. Staff Successfully Reclosed Valve within Approx 10 Minutes
ML20196B68830 November 1988PNS-V-88-006:on 881126,licensee Received Telcon Alleging That Nonlicensed Equipment Operator Observed Using Illegal Drugs.Individual Submitted to Urinalysis Test & Showed Positive for Marijuana.Individual Terminated on 881130Fitness for Duty
ML20209D51323 April 1987Updated PNO-V-87-030B:on 870421,onsite Phase of AIT Team Special Insp Into 870410 Loss of Suction to RHR Sys While in half-loop Concluded W/Meeting at Site
ML20209J41227 April 1987PNS-V-87-003:on 870427,two safety-related Wires Inside 480- Volt West Switchgear Room Controlling Sys for Train a Suction Valve from Borated Water Tank to Low Pressure Safety Injection/Containment Spray Sys Discovered Cut
ML20210B8253 February 1986PNS-V-86-001:on 860202,NRC Senior Resident Inspector Denied Access to Site When Unloaded 38 Caliber Revolver & Ammunition Found in Briefcase.Caused by Confusion When Inspector Relocated from Out of State.Briefcase ConfiscatedContraband
ML20210V34913 February 1987PNS-V-87-001:on 870212,security Officer Found 18x24-inch Drawing on Ground Next to Centrally Located Roadway Inside Protected Area,Adjacent to Gantry Crane.Security Alert Declared.State of CA Notified.Investigation Continuing
ML20211F32917 February 1987PNS-V-87-002:on 870213,call Received Threatening Direct Attack on Site Internal Areas,Security Sys & Personnel. Licensee Declared Security Alert Followed by Declaration of Unusual Event.Fbi Notified.Investigation Continuing
ML20211G38017 February 1987PNS-V-87-001A:on 870214,preliminary Investigation by Util Determined That Homemade Security Drawing Found Unattended on Site on 870212 Had Been Made by One of Licensee Engineers.Investigation by Licensee Continuing
ML20212N55825 August 1986PNS-I-86-013:on 860824,Boston Globe Newspaper Received Bomb Threat Re Plants.Police Notified & Bomb Search Procedures Instituted W/Negative Results
ML20215F90017 June 1987PNS-V-87-005:on 870617,American Protective Svc Notified Util That Security Personnel on Strike Over Monetary Benefits. Licensee Capable to Meet Security Staffing Requirements Through Use of Proprietary Security Personnel
ML20215G96317 June 1987PNS-V-87-004:on 870616,Sacramento Narcotics Task Force Arrested Six Persons Involved in Possession,Sale & Use of Cocaine as Result of tri-county Wide Drug Investigation.Two Individuals Employed by Util.Investigation Continuing
ML20235X16123 September 1987PNS-V-87-007:on 870923,security Received Info That Three Local Television Stations Telephoned by Male Indicating Intention to Blow Up Plant.Surveillance Activities increased.Common-user Areas Searched But Nothing Identified
ML20236A34521 July 1987PNS-V-87-006:on 870721,Sacramento,CA Television Channel 3 Scheduled to Broadcast First of three-part Series on Drug Use at Facility.Nrc Interviewed Informant on 870719.Info Comprehensive & Factual.Law Enforcement Authority Informed
ML20236F17216 June 1976PNS-76-027:on 760615,Region V Public Affairs Office Received Telephone Call from Reporter at San Jose Mercury-News Re Apparent Threat Against Facility.Reporter Received Photocopy of Flyer from Group Friends of Future in Mail
ML20236F4616 May 1976PNS-76-017:on 760506,licensee Reported That Disc Jockey at Radio Station in California Reported That He Had Received Phone Call from Man Who Stated That Two Individuals Had Welded Bomb Into Pipe at Diablo Canyon Reactor.Fbi Informed
ML20236L0345 November 1987PNS-V-87-004B:on 870616,Sacramento Narcotics Task Force Arrested Six Persons Involved in Possession,Sale & Use of Cocaine.Util Clerk Indicated Transactions Conducted in Site Parking Lot or Offsite,Not at Facility
ML20236U1067 March 1975PN-75-001:on 750307,ofc Was Notified of Fire on 750306 at Plant.Fire Resulted from Ignition of Box of CAD-WELD Ignitors Located on Scaffold Near Containment Liner. Inspector Will Be at Site IAW Existing Scheduled Insp
ML20236U37316 July 1975PN-75-051:on 750714,Sacramento Municipal Utility District Notified Region V by Telephone That 47 of 69 CRD Stator Coils Damaged Due to Overheating.Crd Stator Cooling Sys Shutdown
ML20236U3918 July 1975PN-75-047:on 750701 Sacramento Municipal Utility District Notified Region V by Telephone That Exam of Turbine Disclosed That Several Blades Had Broken Off of Fifth Stage on Low Pressure Side of Turbine.Facility Shutdown on 750701
ML20236U7784 August 1975PN-75-064:an Earthquake Registering 5.7 on Richter Scale at Univ of California,Berkeley & 6.4 at California Institute of Technology,Pasadena,Occurred in Vicinity of Oroville,Ca on 750801Earthquake
ML20244A61423 April 1979PNO-79-89:on 790422,coolant Sys Pressure on 790422 Resulted in Automatic Reactor Shutdown.Caused by Failure of a Inverter Power Supply.Unit Returned to Operation on 790423
ML20244A98113 March 1980PNO-V-80-19:on 800312,visual Insp Revealed Degradation of Cladding on One Fuel Rod in Discharged Assembly.Damage Consisted of two-three Inch Split Between Fifth & Sixth Spacer Grids & Pin Hole Between Fourth & Fifth Spacer Grids
ML20245C01425 June 1987PNS-V-87-004A:on 870617,Sacramento Narcotics Task Force Arrested Six Persons Involved in Possession,Sale & Use of Cocaine,Including Util Clerk & Util Helper Employed at Plant.Licensee Interviewed 36 Employees Re Drug Sales & Use
ML20247N00711 September 1989PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom
ML20248F18713 June 1978PNO-78-122:on 780612,Rancho Seco Facility Was Shut Down When Reactor Coolant Sys Unidentified Leakage Rate Reached TS Limit of 1 Gpm.Power Operations Scheduled for Resumption During Wk of 780619,following Completion of Repairs
ML20248F20129 June 1978PNO-78-127:on 780629,util Informs That Three of Five Containers Broke Open & Spilled Ammonium Hydroxide & Vapors Causing Personnel Discomfort Due to Inhalation.No Structural Damage Occurred to Turbine Building
ML20248J05217 April 1978PNO-78-083:on 780412,NRC Inspector Performing Routine Construction Insp at Diablo Canyon Plant Questioned Licensee Intended Use of Threaded Couplers for Splicing Rebar Segments to Form Dowels Associated W/Structural Mods
ML20249A01120 November 1978PNS-78-055:on 781116,French Hospital in San Luis Obsipo,Ca, Received Two Anonymous Telephone Bomb Threats Re Diablo Canyon.Licensee Conduted Searches for Bomb,W/Negative Results
ML20249A66531 July 1978PNS-78-037:antinuclear Demonstrations Scheduled to Take Place at Several Licensed Nuclear Facilities on 780806. Licensees Have Taken Security Precautions Which Include Coordination W/Local Law Enforcements Agencies
ML20249A89531 March 1977PNS-77-013:on 770330,unknown Male Called Diablo Canyon Switchboard & Stated That Explosive Device Planted in Unit 1 & Would Explode Before Midnight.Search Made W/Negative Results & Normal Activities Resumed
ML20249B19324 February 1976PNO-76-031:on 760222,eight People Were Arrested for Trespassing on Licensee Private Road,While Demonstration Was Taking Place.Util Filed Complaints & Eight Arrested Being Held on Bail
ML20249B31311 May 1976PNO-76-086:on 760403,reactor Was Shutdown to Remove Reactor Vessel Surveillance Specimens.Insp of Stator Disclosed That 11 Coils Faulted (Shorted or Grounded).Rewinding of Only 11 Coils Would Extend Current Outage Until July 1976
PNO-I-85-071, on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35%27 September 1985PNO-I-85-071:on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35%
PNO-I-85-071A, on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage27 September 1985PNO-I-85-071A:on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered DamageHigh winds
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted9 October 1987PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure4 January 1988PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named2 February 1988PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom16 February 1988PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process9 November 1988PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process