Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-I-99-026A, on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation1999-06-0101 June 1999 PNO-I-99-026A:on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release1999-05-19019 May 1999 PNO-I-99-026:on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release PNO-I-97-072, on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test1997-11-24024 November 1997 PNO-I-97-072:on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test PNO-I-97-061, on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued1997-09-23023 September 1997 PNO-I-97-061:on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR1997-08-22022 August 1997 PNO-I-97-053:on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR PNO-I-97-019, on 970401,declared Unusual Event at Pilgrim Nuclear Power Station,Due to Inability to Provide Offsite Electrical Power to Safety Related Electrical Busses.Loss of Offsite Electrical Power Resulted from Faults on Lines1997-04-0202 April 1997 PNO-I-97-019:on 970401,declared Unusual Event at Pilgrim Nuclear Power Station,Due to Inability to Provide Offsite Electrical Power to Safety Related Electrical Busses.Loss of Offsite Electrical Power Resulted from Faults on Lines PNO-I-93-066, on 931207,licensee Security Representative in Technical Support Ctr Notified NRC Region I That Actual Demonstration Taking Place in Downtown Plymonth.No Other Interference W/Exercise Activities Identified1993-12-0707 December 1993 PNO-I-93-066:on 931207,licensee Security Representative in Technical Support Ctr Notified NRC Region I That Actual Demonstration Taking Place in Downtown Plymonth.No Other Interference W/Exercise Activities Identified PNO-I-93-066A, demonstration to Protest Inadequacy of Plant Emergency Plan Ended About 2:00 Pm.Three Stink Bombs Introduced Into Media Center Ventilation Sys,But Did Not Interrupt Activities.No Other Untoward Occurrences Reported1993-12-0707 December 1993 PNO-I-93-066A:demonstration to Protest Inadequacy of Plant Emergency Plan Ended About 2:00 Pm.Three Stink Bombs Introduced Into Media Center Ventilation Sys,But Did Not Interrupt Activities.No Other Untoward Occurrences Reported PNO-I-93-052, on 930910,lightning Strike in Switchyard Resulted in Loss of Both 345 Kv Supply Lines to Site.Reactor Tripped as Expected.All Sys Responded as Designed,Offsite Power Reestablished within 11 Minutes1993-09-10010 September 1993 PNO-I-93-052:on 930910,lightning Strike in Switchyard Resulted in Loss of Both 345 Kv Supply Lines to Site.Reactor Tripped as Expected.All Sys Responded as Designed,Offsite Power Reestablished within 11 Minutes PNO-I-91-046, on 910626,irradiated Fuel Bundle Became Degrappled from Refuel Bridge Handling Device.Caused by Grapple Mechanism Failure to Unlatch Fuel Bundle.All Fuel Movement Operations Secured1991-06-26026 June 1991 PNO-I-91-046:on 910626,irradiated Fuel Bundle Became Degrappled from Refuel Bridge Handling Device.Caused by Grapple Mechanism Failure to Unlatch Fuel Bundle.All Fuel Movement Operations Secured PNO-I-90-095, on 901031,radioactive Matl Transported Offsite as Nonradioactive Matl1990-11-0101 November 1990 PNO-I-90-095:on 901031,radioactive Matl Transported Offsite as Nonradioactive Matl PNO-I-90-076, on 900902,licensee Initiated Manual Reactor Scram to Preclude Anticipated Automatic Scram Due to Increasing Reactor Vessel Water Level.Licensee Established Multidisciplinary Analysis Team to Evaluate Reactor Scram1990-09-0505 September 1990 PNO-I-90-076:on 900902,licensee Initiated Manual Reactor Scram to Preclude Anticipated Automatic Scram Due to Increasing Reactor Vessel Water Level.Licensee Established Multidisciplinary Analysis Team to Evaluate Reactor Scram PNO-I-90-053, on 900703,util Declared Unusual Event Following 900702 Tripping of Recirculation Pump Motor Generator Due to Generator Lockout.Reactor Power Reduced to Approx 30% & Reactor Scram Initiated.Commonwealth of Ma Notified1990-07-0303 July 1990 PNO-I-90-053:on 900703,util Declared Unusual Event Following 900702 Tripping of Recirculation Pump Motor Generator Due to Generator Lockout.Reactor Power Reduced to Approx 30% & Reactor Scram Initiated.Commonwealth of Ma Notified PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing1989-09-21021 September 1989 PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies1989-09-21021 September 1989 PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies ML20247N0071989-09-11011 September 1989 PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage1989-08-0808 August 1989 PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage ML20247C9711989-07-18018 July 1989 PNO-89-059:on 890718,reactor Manually Tripped from 50% Power After Loss of Air Ejectors Caused Decreased Condenser Vacuum Condition.Cause of Failure Not Immediately Evident,However Air Ejectors Shifted Due to Slightly Degraded Vacuum PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred1989-07-0505 July 1989 PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred PNO-I-89-049, on 890626,WT Russell Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Third NRC Approval Point in Licensee Power Ascension Test Program.Testing Activities Scheduled for Next Phase1989-06-26026 June 1989 PNO-I-89-049:on 890626,WT Russell Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Third NRC Approval Point in Licensee Power Ascension Test Program.Testing Activities Scheduled for Next Phase ML20245D0071989-06-19019 June 1989 PNS-I-89-009:on 890619,unidentified Male Scaled Outer Fence Around Plant & Chained to Outside of Protected Area Fence. Individual Arrested.Individual Claimed to Be Part of Massachusetts Public Interest Research Group PNO-I-89-027, on 890412,RCIC Injection Valves Unexpectedly Opened During Testing of Sys Logic.Discharge Check Valve Failure Also Allowed Feedwater Backleakage,Contaminating Five Workers Slightly.Augmented Insp Team Dispatched1989-04-13013 April 1989 PNO-I-89-027:on 890412,RCIC Injection Valves Unexpectedly Opened During Testing of Sys Logic.Discharge Check Valve Failure Also Allowed Feedwater Backleakage,Contaminating Five Workers Slightly.Augmented Insp Team Dispatched ML20248H9311989-04-0606 April 1989 PNS-I-89-002:on 890405,telephone Call Received by Licensee, Indicating That Bomb Was on Site.Security Force Responded by Implementing Bomb Threat Contingency Procedure.Nothing Suspicious Found.Threat Considered to Be Hoax PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred1989-04-0303 April 1989 PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants1989-03-23023 March 1989 PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants PNO-I-89-016, on 890303,JM Allan Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Second Approval Point in Power Ascension Test Program. Testing Activities for Next Phase Stated1989-03-0303 March 1989 PNO-I-89-016:on 890303,JM Allan Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Second Approval Point in Power Ascension Test Program. Testing Activities for Next Phase Stated PNO-I-89-010, on 890221,startup Transformer Tripped & Locked Out on Ground Differential Relay Actuation.Licensee Investigating Cause.Decay Heat Minimal & Reactor Water Temp Decreased About 1 F in First 3 H After Loss of Power1989-02-21021 February 1989 PNO-I-89-010:on 890221,startup Transformer Tripped & Locked Out on Ground Differential Relay Actuation.Licensee Investigating Cause.Decay Heat Minimal & Reactor Water Temp Decreased About 1 F in First 3 H After Loss of Power PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process1988-11-0909 November 1988 PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley1988-06-27027 June 1988 PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities1988-06-13013 June 1988 PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities PNO-I-88-058, on 880527,util Mgt Halted Performance of General Maint at Facility.Licensee self-assessment Completed on 880526 Identified Maint Program Weaknesses.Addl Maint Tasks Being Reviewed on case-by-case Basis1988-05-27027 May 1988 PNO-I-88-058:on 880527,util Mgt Halted Performance of General Maint at Facility.Licensee self-assessment Completed on 880526 Identified Maint Program Weaknesses.Addl Maint Tasks Being Reviewed on case-by-case Basis PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends1988-05-0909 May 1988 PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom1988-02-16016 February 1988 PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom PNO-I-88-019, on 880211,fire in Contaminated Area of Machine Shop Discovered.Fire Identified as Burning Insulation from heat-treating Machine Being Used on Valve Disc in Shop.Fire Extinguished.No Spread of Contamination from Area Occurred1988-02-12012 February 1988 PNO-I-88-019:on 880211,fire in Contaminated Area of Machine Shop Discovered.Fire Identified as Burning Insulation from heat-treating Machine Being Used on Valve Disc in Shop.Fire Extinguished.No Spread of Contamination from Area Occurred PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named1988-02-0202 February 1988 PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure1988-01-0404 January 1988 PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted1987-11-24024 November 1987 PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted PNO-I-87-105B, on 871112,offsite Power Reestablished to Vital & Nonvital Buses Via Backfeeding Through Main & Auxiliary Transformers After Loss of Power.Loss of Power Possibly Caused by Icing in Switchyard.Switchyard Sprayed1987-11-13013 November 1987 PNO-I-87-105B:on 871112,offsite Power Reestablished to Vital & Nonvital Buses Via Backfeeding Through Main & Auxiliary Transformers After Loss of Power.Loss of Power Possibly Caused by Icing in Switchyard.Switchyard Sprayed PNO-I-87-106, NRC Dispatched Augmented Insp Team to Facility to Commence Insp on 871115.Insp Will Focus on Sequence of Events & Licensees Response Re 871112 Loss of Offsite Power. Team Expected Onsite 871115-201987-11-13013 November 1987 PNO-I-87-106:NRC Dispatched Augmented Insp Team to Facility to Commence Insp on 871115.Insp Will Focus on Sequence of Events & Licensees Response Re 871112 Loss of Offsite Power. Team Expected Onsite 871115-20 PNO-I-87-105A, as of 871112,offsite Power Remained Unavailable to Site.Personnel Shutdown Emergency Diesel Generator B Due to Problem W/Transformer C,Resulting in Another Shutdown Cooling Isolation.Switchyards Sprayed1987-11-12012 November 1987 PNO-I-87-105A:as of 871112,offsite Power Remained Unavailable to Site.Personnel Shutdown Emergency Diesel Generator B Due to Problem W/Transformer C,Resulting in Another Shutdown Cooling Isolation.Switchyards Sprayed PNO-I-87-105, on 871112,plant Experienced Complete Loss of Offsite Power.Cause Associated W/Switchyard Icing Due to Adverse Weather Conditions.Licensee Continuing to Determine Cause of Loss of Offsite Power.Ice & Salt Being Removed1987-11-12012 November 1987 PNO-I-87-105:on 871112,plant Experienced Complete Loss of Offsite Power.Cause Associated W/Switchyard Icing Due to Adverse Weather Conditions.Licensee Continuing to Determine Cause of Loss of Offsite Power.Ice & Salt Being Removed PNO-I-87-104A, on 871108,normally Locked High Radiation Barrier Leading to Refueling Floor Was Found W/Locking Mechanism Taped Over.Info Serves as Update to PNO-I-87-104, Discussing Licensee Decision to Stop Work at Plant1987-11-10010 November 1987 PNO-I-87-104A:on 871108,normally Locked High Radiation Barrier Leading to Refueling Floor Was Found W/Locking Mechanism Taped Over.Info Serves as Update to PNO-I-87-104, Discussing Licensee Decision to Stop Work at Plant PNO-I-87-104, on 871107 & 08,util Identified Potential Breach of Security Vital Area Barrier & Series of Radiological Problems.Ongoing Maint & Mod Work Onsite Suspended.Licensee Presently Evaluating Situation1987-11-0909 November 1987 PNO-I-87-104:on 871107 & 08,util Identified Potential Breach of Security Vital Area Barrier & Series of Radiological Problems.Ongoing Maint & Mod Work Onsite Suspended.Licensee Presently Evaluating Situation PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems1987-11-0303 November 1987 PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems PNO-I-87-095, on 871015,State of Ma Atty General Jm Shannon Filed Petition Requesting Order to Show Cause Why Plant Should Not Remain Closed Until Full Adjudicatory Hearing Resolves Issues Re GE Mark I Containment & Evacuation Plans1987-10-16016 October 1987 PNO-I-87-095:on 871015,State of Ma Atty General Jm Shannon Filed Petition Requesting Order to Show Cause Why Plant Should Not Remain Closed Until Full Adjudicatory Hearing Resolves Issues Re GE Mark I Containment & Evacuation Plans PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations1987-10-13013 October 1987 PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted1987-10-0909 October 1987 PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted PNO-I-87-090, on 870926-27,util Scheduled to Start Reloading Fuel Into Core of Plant.Plant Shutdown Since Apr 1986 for Maint & Program Improvements.Licensee Required to Obtain NRC Approval Before Restart of Reactor1987-09-25025 September 1987 PNO-I-87-090:on 870926-27,util Scheduled to Start Reloading Fuel Into Core of Plant.Plant Shutdown Since Apr 1986 for Maint & Program Improvements.Licensee Required to Obtain NRC Approval Before Restart of Reactor ML20238D8591987-09-0808 September 1987 PNS-I-87-015:on 870905,four Males Found in Owner Controlled Area Adjacent to Protected Area Barrier.Individuals Arrested & Charged W/Trespassing.No Indication Found That Protected Area Perimeter Barrier Breached by Individuals PNO-I-87-069, corrects & Updates Info Contained in 870728 PNO-I-87-068 Re 870727 Apparent Contamination of Worker W/ Radium.Licensee Subsequently Determined That Worker Contaminated w/Pm-147.Clean-up Will Be Performed by Worker1987-07-30030 July 1987 PNO-I-87-069:corrects & Updates Info Contained in 870728 PNO-I-87-068 Re 870727 Apparent Contamination of Worker W/ Radium.Licensee Subsequently Determined That Worker Contaminated w/Pm-147.Clean-up Will Be Performed by Worker 1999-06-01
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000293/19990051999-10-0808 October 1999 Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19990041999-08-27027 August 1999 Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20209G2331999-07-0909 July 1999 Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good PNO-I-99-026A, on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation1999-06-0101 June 1999 PNO-I-99-026A:on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release1999-05-19019 May 1999 PNO-I-99-026:on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release IR 05000293/19990021999-05-17017 May 1999 Insp Rept 50-293/99-02 on 990308-0418.Two Level 4 Violations Occurred & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000293/19990011999-04-20020 April 1999 Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05 IR 05000293/19980101998-12-22022 December 1998 Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program IR 05000293/19980081998-12-0101 December 1998 Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19983011998-11-24024 November 1998 NRC Operator Licensing Exam Rept 50-293/98-301OL (Including Completed & Graded Tests) for Tests Administered on 981016- 23.Exam Results:All Applicants Passed All Portions of Exam IR 05000293/19982031998-11-24024 November 1998 Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted. Major Areas Inspected:Capability of Selected Sys to Perform Safety Functions Required by Design Bases,Adherence of Sys to Design & Licensing Bases & Consistency of Configuration ML20154J8991998-10-0707 October 1998 Notice of Violation from Insp on 980726-0906.Violation Noted:Licensee Did Not Establish Measures to Assure Regulatory Requirements & Design Basis of Control Room High Efficiency Air Filtration Sys IR 05000293/19980071998-10-0707 October 1998 Insp Rept 50-293/98-07 on 980726-0906.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20239A1231998-08-28028 August 1998 Notice of Violation from Insp on 980609-0725.Violation Noted:From 1980 to 980609,licensee Failed to Maintain Provisions to Ensure That One Train of Cables Were Free from Fire Damage IR 05000293/19980061998-08-28028 August 1998 Insp Rept 50-293/98-06 on 980609-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19980091998-08-20020 August 1998 Insp Rept 50-293/98-09 on 980713-24.No Violations Noted. Major Areas Inspected:Engineering Activities in Areas Including Evaluations to Address Operability Concerns,C/A Process & Actions Associated W/Findings from Previous Insps ML20237A3031998-08-0606 August 1998 Notice of Violation from Insp on 980427-0515.Violation Noted:From 960710-970427,licensee Elected Not to Monitor Performance or Condition of Control Rod Drive Sys Against Established Goals IR 05000293/19980051998-07-0909 July 1998 Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified ML20247P0221998-05-19019 May 1998 Notice of Violation from Insp on 980225-0418.Violations Noted:Work Plan to Replace External Cooling Water Flexible Hoses to a Core Spray Pump Motor Not Commensurate with Complexity of Task.As Result,Physical Damage Occurred ML20247N8441998-05-19019 May 1998 Partially Deleted Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000 (Ref 10CFR2.790(b) for Violations Noted During Insp on 980302-05 & 11-12 ML20248J3981998-05-14014 May 1998 EN-98-038:on 980519,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on One Violation Involving Apparent Failures Associated W/Assessment Aids at Facility ML20217N5971998-04-27027 April 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $165,000.Violations Noted:Between Jan 1995 & 970120 Licensee Failed to Take Prompt & Effective Corrective Action for Significant Condition Adverse to Quality ML20247M3891998-04-22022 April 1998 EN-98-032:on 980427,notice of Proposed Imposition of Civil Penalty in Amount of $165,000 Issued to Licensee.Action Based on Two Severity Level III Violations & One Severity Level III Problem Re Failure to Identify & Take C/As ML20217P7801998-04-0303 April 1998 Insp Rept 50-293/98-03 on 980302-05 & 11-12.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Security Force Capability IR 05000293/19980011998-03-24024 March 1998 Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20217F0101998-03-24024 March 1998 Notice of Violation from Insp on 980107-0224.Violation Noted:Nrc Identified That Condition Outside Design Basis of Plant Involving EDG Fuel Oil Storage Sys Was Not Reported to NRC within 1 Hour ML20202D2441998-02-0606 February 1998 Notice of Violation from Insp on 971111-980106.Violations Noted:Util Did Not Properly Evaluate Cause & Implement Corrective Actions to Preclude Repetition of Temporary Temp Detectors Deficiencies from Reactor Vessel Flange IR 05000293/19970131998-02-0606 February 1998 Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20197K1101997-12-17017 December 1997 Notice of Violation from Insp on 971006-10 & 1119.Violation Noted:Nine Penetrations Were Not Qualified in That Qualification Methodology Used by Boston Edison Had Not Been Validated by Test Results to Be Equivalent to Type Testing IR 05000293/19970121997-12-17017 December 1997 Insp Rept 50-293/97-12 on 971006-10 & 1119.Violations Noted. Major Areas Inspected:Eq Documents for EQ Equipment That Required Requalification Due to Containment Environ Changes Resulting from CS Flow Rate Reduction in 1988 ML20197H2411997-12-11011 December 1997 Notice of Violation from Insp on 970914-1110.Violation Noted:On 971001,licensee Identified That,Tagout T97-61-162 Was Incorrectly Prepared & Applied;Breaker 1021 Was Placed in Closed Vice Open Position as Required by Tagout IR 05000293/19970111997-12-11011 December 1997 Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970101997-11-26026 November 1997 Insp Rept 50-293/97-10 on 971104-07.No Violations Noted. Major Areas Inspected:Emergency Response Organization, Simulated Events,Mitigation Actions Emergency Declarations & off-site Agencies IR 05000293/19970991997-11-26026 November 1997 Correction to SALP Rept 50-293/97-99.Page 2 of Subj Rept Corrected PNO-I-97-072, on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test1997-11-24024 November 1997 PNO-I-97-072:on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test ML20198P8241997-11-0404 November 1997 SALP Rept 50-293/97-99 for Period 960407-970913 IR 05000293/19970081997-10-24024 October 1997 Insp Rept 50-293/97-08 on 970805-0913.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20198L9231997-10-21021 October 1997 Insp Rept 50-293/97-05 on 970514-0828.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Engineering PNO-I-97-061, on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued1997-09-23023 September 1997 PNO-I-97-061:on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued ML20211A2741997-09-17017 September 1997 Notice of Violation from Insp on 970721-0801.Violation Noted:For Problem Rept PR97.9220,trip of B Residual Heat Removal Pump,Individual Performing Root Cause Analysis Was Not Formally Trained in HPI Methodology IR 05000293/19970071997-09-15015 September 1997 Insp Rept 50-293/97-07 on 970625-0816.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970801997-09-12012 September 1997 Insp Rept 50-293/97-80 on 970721-0801.Violations Noted.Major Areas Inspected:Effectiveness of Processes for Identifying Resolving & Preventing Issues That Degrade Quality of Plant Operations & Safety ML20216G8181997-09-0404 September 1997 Insp Rept 50-293/97-09 on 970827-28.No Violations Noted. Major Areas Inspected:Licensee Access Authorization Program PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR1997-08-22022 August 1997 PNO-I-97-053:on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR IR 05000293/19970041997-08-0707 August 1997 Insp Rept 50-293/97-04 on 970505-23.No Violations Noted. Major Areas Inspected:Effectiveness of Licensees Efforts in Maintaining Design Basis of safety-related Sys ML20149K0401997-07-22022 July 1997 Notice of Violation from Insp on 970429-0624.Violation Noted:On 970602,station Services Dept Worker Tied Open Boiler Room Door Which Forms Part of Radiologically Controlled Area & Action Not Directed by RP Personnel ML20149K0431997-07-22022 July 1997 Insp Rept 50-293/97-03 on 970429-0624.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20149K1291997-07-18018 July 1997 Notice of Violation from Exam on 970505-09.Violation Noted: Two SRO Applications Dtd 970418,documented Five Manipulations Based on Credit Taken for Multiple Manipulations Due to Power Change & One Should Be Credited ML20149K1311997-07-18018 July 1997 NRC Operator Licensing Exam Rept 50-293/97-06 (Including Completed & Graded Tests) for Tests Administered on 970505-09 ML20141K7841997-05-22022 May 1997 Notice of Violation from Insp on 970303-0428.Violation Noted:Function of 180/120 Voltage Regulating Transformers Not Correctly Translated Into Specification 1999-08-27
[Table view] |