Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-I-99-026A, on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation1999-06-0101 June 1999
[Table view]PNO-I-99-026A:on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release1999-05-19019 May 1999 PNO-I-99-026:on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release PNO-I-98-051, on 981112,licensee Shutdown Seabrook Station, After Visual Insp Indicated Damage to Main Generator a Phase Output bus.One-week Outage Planned to Troubleshoot & Repair Bus Ductwork.Licensee Did Not Issue Press Release1998-11-13013 November 1998 PNO-I-98-051:on 981112,licensee Shutdown Seabrook Station, After Visual Insp Indicated Damage to Main Generator a Phase Output bus.One-week Outage Planned to Troubleshoot & Repair Bus Ductwork.Licensee Did Not Issue Press Release PNO-I-98-022, on 980611,Seabrook Station Commenced Plant Shutdown After Declaring Control Bldg Air Conditioning Sys Inoperable.Licensee Evaluating Problems Associated W/Air Conditioning Sys.State of Nh Has Been Notified1998-06-12012 June 1998 PNO-I-98-022:on 980611,Seabrook Station Commenced Plant Shutdown After Declaring Control Bldg Air Conditioning Sys Inoperable.Licensee Evaluating Problems Associated W/Air Conditioning Sys.State of Nh Has Been Notified PNO-I-97-072, on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test1997-11-24024 November 1997 PNO-I-97-072:on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test PNO-I-97-061, on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued1997-09-23023 September 1997 PNO-I-97-061:on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR1997-08-22022 August 1997 PNO-I-97-053:on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR PNO-I-97-025A, on 970426,protest Related to Twentieth Anniversary of Mass Arrest at Seabrook in 1997 Update Made. Forty Protestors Arrested for Trespassing After Climbing owner-controlled Fence1997-04-28028 April 1997 PNO-I-97-025A:on 970426,protest Related to Twentieth Anniversary of Mass Arrest at Seabrook in 1997 Update Made. Forty Protestors Arrested for Trespassing After Climbing owner-controlled Fence PNO-I-97-025, on 970426,Clamshell Alliance Planning Twentieth Anniversary civil-disobedience Rally at Seabrook Site. Licensee Made Special Arrangements to Escort Reporters to Cover Demonstration from Inside Site Boundary Fence1997-04-25025 April 1997 PNO-I-97-025:on 970426,Clamshell Alliance Planning Twentieth Anniversary civil-disobedience Rally at Seabrook Site. Licensee Made Special Arrangements to Escort Reporters to Cover Demonstration from Inside Site Boundary Fence PNO-I-97-019, on 970401,declared Unusual Event at Pilgrim Nuclear Power Station,Due to Inability to Provide Offsite Electrical Power to Safety Related Electrical Busses.Loss of Offsite Electrical Power Resulted from Faults on Lines1997-04-0202 April 1997 PNO-I-97-019:on 970401,declared Unusual Event at Pilgrim Nuclear Power Station,Due to Inability to Provide Offsite Electrical Power to Safety Related Electrical Busses.Loss of Offsite Electrical Power Resulted from Faults on Lines PNO-I-93-066, on 931207,licensee Security Representative in Technical Support Ctr Notified NRC Region I That Actual Demonstration Taking Place in Downtown Plymonth.No Other Interference W/Exercise Activities Identified1993-12-0707 December 1993 PNO-I-93-066:on 931207,licensee Security Representative in Technical Support Ctr Notified NRC Region I That Actual Demonstration Taking Place in Downtown Plymonth.No Other Interference W/Exercise Activities Identified PNO-I-93-066A, demonstration to Protest Inadequacy of Plant Emergency Plan Ended About 2:00 Pm.Three Stink Bombs Introduced Into Media Center Ventilation Sys,But Did Not Interrupt Activities.No Other Untoward Occurrences Reported1993-12-0707 December 1993 PNO-I-93-066A:demonstration to Protest Inadequacy of Plant Emergency Plan Ended About 2:00 Pm.Three Stink Bombs Introduced Into Media Center Ventilation Sys,But Did Not Interrupt Activities.No Other Untoward Occurrences Reported PNO-I-93-052, on 930910,lightning Strike in Switchyard Resulted in Loss of Both 345 Kv Supply Lines to Site.Reactor Tripped as Expected.All Sys Responded as Designed,Offsite Power Reestablished within 11 Minutes1993-09-10010 September 1993 PNO-I-93-052:on 930910,lightning Strike in Switchyard Resulted in Loss of Both 345 Kv Supply Lines to Site.Reactor Tripped as Expected.All Sys Responded as Designed,Offsite Power Reestablished within 11 Minutes PNO-I-93-050, on 930907,security Force Member (Sfm) Accidentally Discharged Shotgun within Arms Room as Weapon Being Prepared for Storage.Weapon Had Already Been Unloaded & Cleared.Sfm Subjected to Fitness for Duty Testing1993-09-0707 September 1993 PNO-I-93-050:on 930907,security Force Member (Sfm) Accidentally Discharged Shotgun within Arms Room as Weapon Being Prepared for Storage.Weapon Had Already Been Unloaded & Cleared.Sfm Subjected to Fitness for Duty Testing PNO-I-91-046, on 910626,irradiated Fuel Bundle Became Degrappled from Refuel Bridge Handling Device.Caused by Grapple Mechanism Failure to Unlatch Fuel Bundle.All Fuel Movement Operations Secured1991-06-26026 June 1991 PNO-I-91-046:on 910626,irradiated Fuel Bundle Became Degrappled from Refuel Bridge Handling Device.Caused by Grapple Mechanism Failure to Unlatch Fuel Bundle.All Fuel Movement Operations Secured PNO-I-90-095, on 901031,radioactive Matl Transported Offsite as Nonradioactive Matl1990-11-0101 November 1990 PNO-I-90-095:on 901031,radioactive Matl Transported Offsite as Nonradioactive Matl PNO-I-90-076, on 900902,licensee Initiated Manual Reactor Scram to Preclude Anticipated Automatic Scram Due to Increasing Reactor Vessel Water Level.Licensee Established Multidisciplinary Analysis Team to Evaluate Reactor Scram1990-09-0505 September 1990 PNO-I-90-076:on 900902,licensee Initiated Manual Reactor Scram to Preclude Anticipated Automatic Scram Due to Increasing Reactor Vessel Water Level.Licensee Established Multidisciplinary Analysis Team to Evaluate Reactor Scram PNO-I-90-055, on 900720,nonlicensed Supervisor Tested Positive from Drug Test Administered on 900718.Test Indicated Presence of Cocaine.Individual Unescorted Site Access Suspended for 14 Days.State of Nh Notified1990-07-23023 July 1990 PNO-I-90-055:on 900720,nonlicensed Supervisor Tested Positive from Drug Test Administered on 900718.Test Indicated Presence of Cocaine.Individual Unescorted Site Access Suspended for 14 Days.State of Nh Notified PNO-I-90-052, on 900702,power Reduction to 10% Initiated Due to Discovery That 6-inch Elbow in Heater Drain Tank Spill Line Thinned to Less than Required Min Wall Thickness & Offsite Phone Communication Degraded.State of Nh Notified1990-07-0303 July 1990 PNO-I-90-052:on 900702,power Reduction to 10% Initiated Due to Discovery That 6-inch Elbow in Heater Drain Tank Spill Line Thinned to Less than Required Min Wall Thickness & Offsite Phone Communication Degraded.State of Nh Notified PNO-I-90-053, on 900703,util Declared Unusual Event Following 900702 Tripping of Recirculation Pump Motor Generator Due to Generator Lockout.Reactor Power Reduced to Approx 30% & Reactor Scram Initiated.Commonwealth of Ma Notified1990-07-0303 July 1990 PNO-I-90-053:on 900703,util Declared Unusual Event Following 900702 Tripping of Recirculation Pump Motor Generator Due to Generator Lockout.Reactor Power Reduced to Approx 30% & Reactor Scram Initiated.Commonwealth of Ma Notified PNO-I-90-048, on 900618,util Security Organization Notified of Bomb Threat Reported to State of Nh Police.Threat Received by Prof Psychic Providing Info on Patient Claiming to Possess Enough Dynamite to Blow Up Plant1990-06-19019 June 1990 PNO-I-90-048:on 900618,util Security Organization Notified of Bomb Threat Reported to State of Nh Police.Threat Received by Prof Psychic Providing Info on Patient Claiming to Possess Enough Dynamite to Blow Up Plant PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies1989-09-21021 September 1989 PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing1989-09-21021 September 1989 PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing ML20247N0071989-09-11011 September 1989 PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage1989-08-0808 August 1989 PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage ML20247C9711989-07-18018 July 1989 PNO-89-059:on 890718,reactor Manually Tripped from 50% Power After Loss of Air Ejectors Caused Decreased Condenser Vacuum Condition.Cause of Failure Not Immediately Evident,However Air Ejectors Shifted Due to Slightly Degraded Vacuum PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred1989-07-0505 July 1989 PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred PNO-I-89-048C, on 890629,corporate Officer Relieved of Duties.Action Based on Executive Mgt Decision by Facility Owners Per Review of Action Taken Following Manual Reactor Trip Event1989-06-30030 June 1989 PNO-I-89-048C:on 890629,corporate Officer Relieved of Duties.Action Based on Executive Mgt Decision by Facility Owners Per Review of Action Taken Following Manual Reactor Trip Event PNO-I-89-048B, on 890626,W Russell Directed Formation of Augmented Insp Team to Review Circumstances Surrounding 890622 Manual Reactor Trip Event.Onsite Team Activities Currently Planned to Begin on 890628 & End on 8906301989-06-26026 June 1989 PNO-I-89-048B:on 890626,W Russell Directed Formation of Augmented Insp Team to Review Circumstances Surrounding 890622 Manual Reactor Trip Event.Onsite Team Activities Currently Planned to Begin on 890628 & End on 890630 PNO-I-89-049, on 890626,WT Russell Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Third NRC Approval Point in Licensee Power Ascension Test Program.Testing Activities Scheduled for Next Phase1989-06-26026 June 1989 PNO-I-89-049:on 890626,WT Russell Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Third NRC Approval Point in Licensee Power Ascension Test Program.Testing Activities Scheduled for Next Phase PNO-I-89-048A, on 890623,TT Martin Issued Confirmatory Action Ltr (CAL) 89-11 Re 890622 Manual Reactor Trip Event.Cal Confirms Commitments Made by E Brown That Prior to Restart of Unit,Licensee Will Complete post-trip Review Process1989-06-23023 June 1989 PNO-I-89-048A:on 890623,TT Martin Issued Confirmatory Action Ltr (CAL) 89-11 Re 890622 Manual Reactor Trip Event.Cal Confirms Commitments Made by E Brown That Prior to Restart of Unit,Licensee Will Complete post-trip Review Process PNO-I-89-048, on 890622,reactor Manually Tripped While Natural Circulation Startup Test Being Conducted.Steam Dump Valve to Main Condenser Stuck Open Resulting in RCS Temp & Pressurizer Level Decrease.Operators Restored Charging Sys1989-06-22022 June 1989 PNO-I-89-048:on 890622,reactor Manually Tripped While Natural Circulation Startup Test Being Conducted.Steam Dump Valve to Main Condenser Stuck Open Resulting in RCS Temp & Pressurizer Level Decrease.Operators Restored Charging Sys ML20245D0071989-06-19019 June 1989 PNS-I-89-009:on 890619,unidentified Male Scaled Outer Fence Around Plant & Chained to Outside of Protected Area Fence. Individual Arrested.Individual Claimed to Be Part of Massachusetts Public Interest Research Group PNO-I-89-045, on 890613,criticality Delayed for 7 Days Due to Problems W/Mods Made to Steam Supply Valves to Emergency Feedwater Pump Turbine.State of Nh & Commonwealth of Ma Notified1989-06-14014 June 1989 PNO-I-89-045:on 890613,criticality Delayed for 7 Days Due to Problems W/Mods Made to Steam Supply Valves to Emergency Feedwater Pump Turbine.State of Nh & Commonwealth of Ma Notified PNO-I-89-042, on 890601,instrumentation & Control Technician Shirt Contaminated w/Cl-36 While Handling Discarded Radiation Protector.Caused by Leaking Check Source.Skin Dose Estimate for Affected Individual Surveyed1989-06-0505 June 1989 PNO-I-89-042:on 890601,instrumentation & Control Technician Shirt Contaminated w/Cl-36 While Handling Discarded Radiation Protector.Caused by Leaking Check Source.Skin Dose Estimate for Affected Individual Surveyed ML20247L8621989-05-25025 May 1989 PNS-I-89-006:on 890524,Seabrook,NH Police Notified Plant of Bomb Threat Received by Boston Television Station.Licensee Determined Bomb Threat to Be Noncredible.Heightened Security Awareness Initiated in & Around Station PNO-I-89-027, on 890412,RCIC Injection Valves Unexpectedly Opened During Testing of Sys Logic.Discharge Check Valve Failure Also Allowed Feedwater Backleakage,Contaminating Five Workers Slightly.Augmented Insp Team Dispatched1989-04-13013 April 1989 PNO-I-89-027:on 890412,RCIC Injection Valves Unexpectedly Opened During Testing of Sys Logic.Discharge Check Valve Failure Also Allowed Feedwater Backleakage,Contaminating Five Workers Slightly.Augmented Insp Team Dispatched ML20248H9311989-04-0606 April 1989 PNS-I-89-002:on 890405,telephone Call Received by Licensee, Indicating That Bomb Was on Site.Security Force Responded by Implementing Bomb Threat Contingency Procedure.Nothing Suspicious Found.Threat Considered to Be Hoax PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred1989-04-0303 April 1989 PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants1989-03-23023 March 1989 PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants PNO-I-89-016, on 890303,JM Allan Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Second Approval Point in Power Ascension Test Program. Testing Activities for Next Phase Stated1989-03-0303 March 1989 PNO-I-89-016:on 890303,JM Allan Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Second Approval Point in Power Ascension Test Program. Testing Activities for Next Phase Stated PNO-I-89-010, on 890221,startup Transformer Tripped & Locked Out on Ground Differential Relay Actuation.Licensee Investigating Cause.Decay Heat Minimal & Reactor Water Temp Decreased About 1 F in First 3 H After Loss of Power1989-02-21021 February 1989 PNO-I-89-010:on 890221,startup Transformer Tripped & Locked Out on Ground Differential Relay Actuation.Licensee Investigating Cause.Decay Heat Minimal & Reactor Water Temp Decreased About 1 F in First 3 H After Loss of Power PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process1988-11-0909 November 1988 PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process ML20150B8341988-07-0505 July 1988 Corrected PNO-I-88-070:on 880702,public Meeting Held Re Emergency Preparedness Exercise on 880627-28.Meeting Attended by Approx 150 People W/Only Loud Verbal Comments & Heckling Occurring.Comments Received Negative & Positive PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley1988-06-27027 June 1988 PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities1988-06-13013 June 1988 PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities PNO-I-88-058, on 880527,util Mgt Halted Performance of General Maint at Facility.Licensee self-assessment Completed on 880526 Identified Maint Program Weaknesses.Addl Maint Tasks Being Reviewed on case-by-case Basis1988-05-27027 May 1988 PNO-I-88-058:on 880527,util Mgt Halted Performance of General Maint at Facility.Licensee self-assessment Completed on 880526 Identified Maint Program Weaknesses.Addl Maint Tasks Being Reviewed on case-by-case Basis PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends1988-05-0909 May 1988 PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom1988-02-16016 February 1988 PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom PNO-I-88-019, on 880211,fire in Contaminated Area of Machine Shop Discovered.Fire Identified as Burning Insulation from heat-treating Machine Being Used on Valve Disc in Shop.Fire Extinguished.No Spread of Contamination from Area Occurred1988-02-12012 February 1988 PNO-I-88-019:on 880211,fire in Contaminated Area of Machine Shop Discovered.Fire Identified as Burning Insulation from heat-treating Machine Being Used on Valve Disc in Shop.Fire Extinguished.No Spread of Contamination from Area Occurred 1999-06-01 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000293/19990051999-10-0808 October 1999
[Table view]Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000443/19990101999-09-24024 September 1999 Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Major Areas Inspected:Corrective Action Program IR 05000293/19990041999-08-27027 August 1999 Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000443/19990051999-08-25025 August 1999 Insp Rept 50-443/99-05 on 990621-0801.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20210P3431999-08-0303 August 1999 Notice of Violation from Insp on 990129-0527.Violation Noted:On 980116,G Pageau Engaged in Deliberate Misconduct That Caused Naesco to Be in Violation of 10CFR50.7 ML20210P3251999-08-0303 August 1999 Notice of Violation from Insp on 980129-0527.Violation Noted:On 990116,Willimas Power Corp (Wpc),Contractor for Naesco,Discriminated Against Wpc Electrician Due to Employee Involvement in Protected Activity ML20210N5781999-08-0303 August 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:On 980116,licensee Contractor Discriminated Against Contractor Electrician Due to Employee Involvement in Protected Activity ML20211A7351999-07-29029 July 1999 EN-99-029:on 990803,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Based on Severity Level III Violation Involving Licensee Contractor That Discriminated Against Contractor Electrician IR 05000443/19990061999-07-26026 July 1999 Insp Rept 50-443/99-06 on 990510-0620.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support,Including Security Controls ML20209G2331999-07-0909 July 1999 Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good ML20196E0261999-06-21021 June 1999 Insp Rept 50-443/99-01 on 990321-0509.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support PNO-I-99-026A, on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation1999-06-0101 June 1999 PNO-I-99-026A:on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation IR 05000443/19990031999-05-20020 May 1999 Insp Rept 50-443/99-03 on 990308-0408.Non-cited Violations Noted.Major Areas Inspected:Licensee Engineering Activities Which Included in-depth Review of PCCW Sys PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release1999-05-19019 May 1999 PNO-I-99-026:on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release IR 05000293/19990021999-05-17017 May 1999 Insp Rept 50-293/99-02 on 990308-0418.Two Level 4 Violations Occurred & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000443/19990011999-04-20020 April 1999 Insp Rept 50-443/99-01 on 990207-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19990011999-04-20020 April 1999 Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05 IR 05000443/19980111999-02-26026 February 1999 Insp Rept 50-443/98-11 on 981228-990207.No Violations Noted.Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000443/19980101999-01-28028 January 1999 Insp Rept 50-443/98-10 on 981115-1227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000293/19980101998-12-22022 December 1998 Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program ML20198C1441998-12-11011 December 1998 Notice of Violation from Insp on 981004-1114.Violation Noted:On 981113, a Service Water & a Cooling Tower SWS Removed from Service to Conduct Planned Maint on SWS Valve & Applicable TS Action Statement Not Identified & Tracked IR 05000443/19980091998-12-11011 December 1998 Insp Rept 50-443/98-09 on 981004-1114.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000293/19980081998-12-0101 December 1998 Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000443/19983011998-11-25025 November 1998 NRC Operator Licensing Exam Rept 50-443/98-301 (Including Completed & Graded Tests) for Tests Administered on 981016- 981016-23.All Five SRO & All Four RO Applicants Passed All Portions of Exam IR 05000293/19983011998-11-24024 November 1998 NRC Operator Licensing Exam Rept 50-293/98-301OL (Including Completed & Graded Tests) for Tests Administered on 981016- 23.Exam Results:All Applicants Passed All Portions of Exam IR 05000293/19982031998-11-24024 November 1998 Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted. Major Areas Inspected:Capability of Selected Sys to Perform Safety Functions Required by Design Bases,Adherence of Sys to Design & Licensing Bases & Consistency of Configuration PNO-I-98-051, on 981112,licensee Shutdown Seabrook Station, After Visual Insp Indicated Damage to Main Generator a Phase Output bus.One-week Outage Planned to Troubleshoot & Repair Bus Ductwork.Licensee Did Not Issue Press Release1998-11-13013 November 1998 PNO-I-98-051:on 981112,licensee Shutdown Seabrook Station, After Visual Insp Indicated Damage to Main Generator a Phase Output bus.One-week Outage Planned to Troubleshoot & Repair Bus Ductwork.Licensee Did Not Issue Press Release IR 05000443/19980061998-11-0606 November 1998 Insp Rept 50-443/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000443/19980081998-10-16016 October 1998 Insp Rept 50-443/98-08 on 980921-25.No Violations Noted. Major Areas Inspected:Long Term MOV Program Under GL 89-10 Program at Seabrook Station & Will Review long-term MOV Program Under GL 96-05 IR 05000293/19980071998-10-0707 October 1998 Insp Rept 50-293/98-07 on 980726-0906.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154J8991998-10-0707 October 1998 Notice of Violation from Insp on 980726-0906.Violation Noted:Licensee Did Not Establish Measures to Assure Regulatory Requirements & Design Basis of Control Room High Efficiency Air Filtration Sys IR 05000443/19980071998-10-0202 October 1998 Errata to Insp Rept 50-443/98-07 on 980803-07,including Coversheet & Executive Summary Pages ML20154B1681998-09-28028 September 1998 Insp Rept 50-443/98-09 on 980803-07.Violations Noted.Major Areas inspected:medium-voltage & low-voltage Power Circuit Breakers IR 05000443/19980051998-09-25025 September 1998 Insp Rept 50-443/98-05 on 980705-0822.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Licensee Security Facilities & Equipment in Areas of Protective Area Assessment Aids IR 05000293/19980061998-08-28028 August 1998 Insp Rept 50-293/98-06 on 980609-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20239A1231998-08-28028 August 1998 Notice of Violation from Insp on 980609-0725.Violation Noted:From 1980 to 980609,licensee Failed to Maintain Provisions to Ensure That One Train of Cables Were Free from Fire Damage IR 05000293/19980091998-08-20020 August 1998 Insp Rept 50-293/98-09 on 980713-24.No Violations Noted. Major Areas Inspected:Engineering Activities in Areas Including Evaluations to Address Operability Concerns,C/A Process & Actions Associated W/Findings from Previous Insps ML20237A3031998-08-0606 August 1998 Notice of Violation from Insp on 980427-0515.Violation Noted:From 960710-970427,licensee Elected Not to Monitor Performance or Condition of Control Rod Drive Sys Against Established Goals IR 05000443/19980041998-07-30030 July 1998 Insp Rept 50-443/98-04 on 980517-0704.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20236W2411998-07-30030 July 1998 Notice of Violation from Insp on 980517-0704.Violation Noted:On 980504,licensee Did Not Take Action to Promptly Identify Whether Steam Pressure Protection Channels for a & D Steam Generators Operable,After Three Found Inoperable IR 05000293/19980051998-07-0909 July 1998 Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified IR 05000443/19980031998-07-0909 July 1998 Insp Rept 50-443/98-03 on 980602-04.No Violations Noted. Major Areas Inspected:Insp Observed & Evaluated Licensee Biennial full-participation Exercise in Simulator Control Room,Technical Support Ctr & Operations Support Ctr PNO-I-98-022, on 980611,Seabrook Station Commenced Plant Shutdown After Declaring Control Bldg Air Conditioning Sys Inoperable.Licensee Evaluating Problems Associated W/Air Conditioning Sys.State of Nh Has Been Notified1998-06-12012 June 1998 PNO-I-98-022:on 980611,Seabrook Station Commenced Plant Shutdown After Declaring Control Bldg Air Conditioning Sys Inoperable.Licensee Evaluating Problems Associated W/Air Conditioning Sys.State of Nh Has Been Notified IR 05000443/19980021998-06-12012 June 1998 Insp Rept 50-443/98-02 on 980329-0516.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20247N8441998-05-19019 May 1998 Partially Deleted Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000 (Ref 10CFR2.790(b) for Violations Noted During Insp on 980302-05 & 11-12 ML20247P0221998-05-19019 May 1998 Notice of Violation from Insp on 980225-0418.Violations Noted:Work Plan to Replace External Cooling Water Flexible Hoses to a Core Spray Pump Motor Not Commensurate with Complexity of Task.As Result,Physical Damage Occurred ML20248J3981998-05-14014 May 1998 EN-98-038:on 980519,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on One Violation Involving Apparent Failures Associated W/Assessment Aids at Facility ML20217N5971998-04-27027 April 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $165,000.Violations Noted:Between Jan 1995 & 970120 Licensee Failed to Take Prompt & Effective Corrective Action for Significant Condition Adverse to Quality ML20217L8311998-04-27027 April 1998 Insp Rept 50-443/98-01 on 980201-0328.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20217L8231998-04-27027 April 1998 Notice of Violation from Insp on 980201-0328.Violation Noted:On 980313,inspector Identified That Four Individuals Performing Work Inside Posted Contaminated Area Failed to Comply W/Radiation Work Permits & Posted Instructions 1999-09-24 |
Text
/
DCS: 50-443/860824 50-293/860824 Date: August 25, 1986 PRELIMINARY NOTIFICATION OF SAFEGUARDS EVENT--PNS-I-86-13 This preliminary notification constitutes EARLY notice of events of POSSIBLE national security or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region I staff on this date.
Facility: 1. Public Service of New Hampshire Licensee Emergency Classification: '
Seabrook Nuclear Station Unit 1 Notification of Unusual Event (Docket No. 50-443) Alert
- 2. Boston Edison Company Site Area Emergency Pilgrim Nuclear Pwr. Station General Emergency (Docket No. 50-293) X Not Applicable
Subject:
B0MB THREATS The Boston Globe newspaper was notified at 12:30 a.m. on August 24, 1986 that bombs would explode at Seabrook Station, Seabrook, New Hampshire and Pilgrim Nuclear Power Station, Plymouth, Massachusetts within the next 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />. The newspaper notified the Massachusetts State Police who notified the New Hampshire State Police.
The Massachusetts State Police notified the Pilgrim Nuclear Power Station at 12:57 a.m. A f bomb search procedure was imediately started inside the plant, and enhanced security measures were implemented. The search was completed at 4:35 a.m. and yielded negative results. The additional security measures were terminated at 9:00 p.m. on August 24, 1986.
The New Hampshire State Police notified Seabrook Nuclear Station at 1:17 a.m. A bomb search procedure was started immediately at the site. The search was completed at 6:19 a.m. with negative results.
The FBI was notified by the licensees. The Information Assessment Team, State of New Hampshire and the Commonwealth of Massachusetts have been notified.
This PNS is issued for infonnation only and is current as of 11:00 a.m. No additional action is planned by the NRC at this time.
CONTACT: W. Martin R. Keimig 488-1374 488-1255 DISTRIBUTION:
H. St. MNBB Phillips E/W Willste _ Mail: ADM:DMB Chairman Zech EDO t;RR IE NMSS D0T:Trans only Com. Carr PA OIA RES Comm. Bernthal MPA AE0D Com. Roberts ELD Com. Asselstine ACRS Air Rights INP0 E g SECY SP NSAC 1 #
CA 3 PDR Regional Offices TMI Resident Section "2 RI Resident Office Licensee:
ge2 81 60025 @eaN Ucensees)
PNS-I-86-013 8 PDR
/f 3 y el<