ML20236U106
| ML20236U106 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 03/07/1975 |
| From: | Jennifer Davis, Galen Smith, Thornburg H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | |
| References | |
| PN-75-001, PN-75-1, NUDOCS 9807290308 | |
| Download: ML20236U106 (1) | |
Text
-__
y, PM-75-01 March 7, 1975 PRELIMINARY INFORMATION j#
NOT FOR PUBLIC DISCLOSURE
['o p d Me
[1 #
i 1 -
- [h)). \\'
G
. PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURENCE 1
]
(Note: This preliminary notification constitutes EARLY notice of
-l events of POSSIBLE safety or public interest significance.
The $nformation presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 4:00 p.m. on date of this notification.
(
IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY fE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND
~~
ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURRENCE WILL BE FORWARDED IF REVIEW OF LATER INFORMATION INDICATES SUCH
-ACTION.
Facility: Diablo Canyon, Unit 2 i
~
Pacific Gas and Electric Company
Subject:
CONSTRUCTION FIRE AT DIABLO CANYON UNIT 2 Our Region V office was notified on March 7, 1975, that c fire had-occurred at the Diablo Canyon Unit'2 at 4:30 on March 6, 1975.
The fire resulted from the ignition of a box of CAD-WELD ignitors
{
located on a scaffold near the containment liner.
The following
' damage was reported to have occurred:
L j
1.
The. container liner plate'was damaged above the elevations
{
.2_-
of conerete placement.
2.
The reactor pressure vessel cladding was damaged by spatter i
from molten liner plate.
It is reported that the safety related damage is repairable within the requirements of the applicable codes, i
i Based upon preliminary data we believe that the immediate safety implication of this event are minimal.. We are distributing this
{
information because of publicity which may result from the licensee's press. release.
A Region V inspector will be at the site March 10, 1975 in accordance with an existing' scheduled inspection.
1
Contact:
GESmith, IE x7261, HDThornbuig, II x7353, JGDavis, IE x7541 i
g Distribution:
\\
' Chairman Anders Commissioner Gilinsky Commissioner Kennedy' PPTT MNARY INFORMATION Cotur.issioner Mason NOT FOR PUBLIC DISCLOSURE O
I Commissioner Rowden i
L. V. Gossick, EDO Secretary (2) f[,.
i J. A. Harris, PA (2) f JCAE 9907290308 750307 PDR IE PN-75-01 PDR L
-