|
---|
Category:Letter
MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles IR 05000250/20243012024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report IR 05000250/20240112024-08-0606 August 2024 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000250/2024011 and 05000251/2024011 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-112, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report IR 05000250/20240102024-05-0101 May 2024 Design Basis Assurance Inspection Programs Inspection Report 05000250/2024010 and 05000251/2024010 and Notice of Violation L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-057, 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications2024-04-11011 April 2024 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications ML24087A1992024-04-0505 April 2024 Achp Section 106 Letter Re Notice of Availability of the Final Environmental Impact Statement for Turkey Point Units 3 & 4 Subsequent License Renewal Application ML24096A2162024-04-0505 April 2024 Ltr. to Marcellus Osceola, Chairman, Seminole Tribe of Florida, Re., Section 106 Letters for Turkey Point ML24087A1982024-04-0505 April 2024 Notice of Availability of the Final Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML24096A2182024-04-0505 April 2024 Ltr. to Stephanie Bryan, Tribal Chair, Poarch Band of Creek Indians, Re., Section 106 Letters for Turkey Point ML24096A2152024-04-0505 April 2024 Ltr. to Lewis Johnson, Principal Chief, Seminole Nation of Oklahoma, Re., Section 106 Letters for Turkey Point ML24087A2012024-04-0505 April 2024 Letter to Talbert Cypress, Miccosukee Tribe of Indians of Florida; Re., Section 106 Letters for Turkey Point ML24087A2002024-04-0505 April 2024 Letter to Miami-Dade County Office of Historic Preservation Re Section 106 on Turkey Point Units 3 & 4 EIS ML24096A2142024-04-0505 April 2024 Ltr. to David Hill, Principal Chief, the Muscogee (Creek) Nation, Re., Section 106 Letters for Turkey Point ML24072A2832024-04-0101 April 2024 Ltr to Dianne Strand-Notice of Avail.-Final Site-Specific Supp. 5a, 2nd Renewal to the GEIS for License Renewal L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
E" U,S. NVCLL'AfiAEQUI ATOICY MISSION OOCKLT NUMOEII NRC!:ORM 195 I2.7v!
FII.E NV>tI04R NRC DISTRIB!JTiON Fo'R PART 50 DOCKET MATERIAL HONi'HLY REPORT FROM: OATC OF OOCVMENT TO:
MIPC Florida Power & Light Co 10-8-76 Miami, Fla DATE RECEIVEO A D Schmidt 10-22-76 gt ETTER QNOTOIIIZEO PROP INPUT FORM NUMoER or. coPIEs REcE!vEo OORIGINAL RUN c LASS IF I E 0 SCOP Y lcc DESCRIPTION ENCLOSURE t LETTER TRANS THE FOLLOWING: MONTHLY REPORT FOR ~~~mh PLANT & COHPON""NT OPERABILITY &
AVAILABILITY'HISREPORT TO BE USED IN
~ PREPARING G'iViY BOOIC BY. PLANS & OPERATIOi'IS.
PLANT NAME:
Turkey Point 3 & 4 "tlt l'Q Qi$ 'I;,r- q.>
)r ~~t FOR ACTION!/INFOnh1ATION ~5=76 e i'IIPC liUTF.RitIAL0 IST R I QUTIOI!I
'RQ PD
. HGDZU6iiP
. ~GHA""~MH BRANCH CH EF+fg g4 v LC MSST..~L} rr Lluli M
1~I I >f 1, t-f>
I'.XTI IINRI. I) IS1'IlllIUTION L: CO"I I IIOI NUMHI:fl lp~ vr t ~ ~ t,,l t ltg,
~ ~ e ~ ~ t~
P.O. OOX 013IGO, MIAMI, A. ~A 33Il'LOIIIOA POWEA S LIGHT COMPh'$
I October 8, 1976 ~C j/yQ Ct Office of Management Information and Proqram Controls U.S. Nuclear Requlatory Commission c" Washington, D. D. 20555 OE Gentlemen:
Attached are the September 1976 Operatinq Status Reports for Turkey. Point Units No. 3 and 4 and St. Lucie Unit No. l.
Very truly yours,
. A. D. Schmidt E@I.A Igy 00-Vice President Power Resources VTC/ar Attachments cc: Mr. Norman C. Moseley Jack R. Newman, Esquire o~
ugHKC 6
ou "- "-",
ynv""
u.S. t"~~svc ga)l
C I '
r
nf I i..0<X C OPERATZNC DiYI'A REI'ORT
~ ~ ~
t 0'OCYKT NO. 50 250 UNIT Turke Point Unit No.
REPORT MONTH, Se tember 1976 DATE COMPLETED BY V. T. Chilson
- OPERATING STATUS
~ ~
~ ~
1~ REPORTING PERIOD ~
1 P 7 P 9 P 01 GROSS HOURS IN REPORTING PERXOD:
THROUGH 2400, 76 09, 30 2~ CURREiNT . c! c. ~ r r., LKV"L (fit'Jt) r 2 200 l(AX. DEP ND. CAPACITY (.'ice-;let):
D'SIGN EDZCTRICAD RATING (Nile-A'e~t 693'.
POhER LFVEL TO hHXCH R""STRXCTFD (Xi'NY) (NNe-Net) r 4~ REASONS FOR RESTARICTION (ZF ANY):
THIS MONTH YEAR TO DATE CU>1UL TIVE
- 5. NUAi&ER Or fiOURS REACTOR I'iAS CRITICAL. ~ ~ ~
702.1'.0 5 701.1 26 981.3
- 6. RE'bCTOR RESERWr. SHUTDO'1'JNI HOURS..... ~ .... ~
64.2 ~
- 64. 7
- 7. HOURS GEi'IERATOR ON LXNE.....
- 8. UNIT RESErYi'~ SHUTDO'NN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0.0 85.0 e
9 GROSS TIIER'~AL EN" RGY Gr lF.I'YOKED (I!l ti)..... ~ 1 525 830 12 118 588 49 430 848
- 10. GROS" LECTRrCAL EN=?GY GEN M~ D ("1NH) .. 478 577 3 834 905 . 15 8'50 141 NET FLECTRXCAL ENc.RGY GFNFRATED (i~."lH).... 454 835 3 638 678 14'9'94 440 12e P CTDR SERVICE: FACTO "....I.:............... 97.5 86.7 '80.5
- 13. R""ACTOR AVAILABILITYFACTOR..... '7.5 87.7 80.7 15 'i UAAIIT SFRVXC- FACTOR:
IT. AVAILABILITYFACTOR.
~ ..;....
iiDC).........
97 '
97.0 85.7 85.7 77.6 77.8 16.
17.
UNIT CAPACITY FACTOR (Using UNIT CAPACITY FACTOR (Using Design ftÃe).. ~
94.9 91.2 83.1 79.9 'A.S 68.2
!J 19 ~ SHUTDOÃ"S SCHEDULr D OVER NEXT 6 MONTHS (T ?E I DAT>>, AAXD DURAT ON OF Refueling, Maintenance, and Inspections October 31 through December ll; 1976
- 20. XF SHUTDO!'N AT E ID OF R PORT P" RZOD, ESTZ.'~~%TED DATE CF STARTUP:
21 ~ UNITS XN TEST STATUS (PRIOR TO CO:~iPERCXAL OPERATIC<I): FORECAS ACHIEVED XNXTIAL CRITICALITY XNZTXAL EIDECTRXCZTY
'0 l AP?EXDIX D DOCKET NO, 50 - 250 e
e
" ~ g AEON UNIT SHUTDO'nNS AND PO'dJER REDUCiIONS ~ IJNIT NJNE E~VIPME!t'T FAILURE (EXPLAIN)
D: h'AINTa Olt VESa ~ DATE Oct. / 1976 c: rcrglr!r 'Nc r'c ~TORY RJ:srRICTIOX COMPLETED.DC rhflson Ft OaPERATOR TauAINIXG dtyD LIC t!SE EXeLt:IN'ACTION '1ELEPllo't'E 305) 552 r: ADMIJ::STn.i-.lVE nnpout uogtg de~tenn r tppd C: OP" RATIONAL ERROR (EXPLA N) '
ll: OT!!Eil (EXPLAIN) i~~CD METHOD OF I: hvLX UAL TYPE SHUT a INC DO'saN 2 J erAXUAL SCOW Fz FORCED DURATION Tlli REACTOR Oit l
3:
dl; AUTO!'%C OT!JER !
SCRA-'4 XP'IN)
DATE S: SCIIEDVLED (llCVRS) REASON (1) REDUCING PO)tiR(?) ~too~
CORRECTIVE ACTIONS/COXVaEXTS 19 76-08-25 21.6 continuation ar August outage. (Nuclear system)
SURGERY l Unit lio, y ope ated at approrinat ly tdd g R.p. during nonth atter tha unit uae returned to nerviee on September 1, 1976.
C
~ 1 APPENDZX B AVERAGE. DAiLY UNZT POWER LEV L DOCKET NO 50 250 UNn'urke Point Unz.t No 3 DATE Dot. 4, 1906 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 3830 ANTH September 1976 DAY AVERAGE DAZLY POWER L"VEL DAY AVERAGE DAZLY POWER LEVEL (NWe-Net) (Mwe-Net)
~ - 17 625 18 19 660 649 20 656
'650 21 652 .22. 656 648 23
'8 24 652 25 65 10 654 '27 658 12 656 28
.662 29 649 661 .30 645 15 659 l6
APIIIP.III)IH C QPERATZNC DATA REFQL~
RR DOCYAET tlO. 50 -251 UN ZT Turke Poit)c Ut)ic No.
REPORT HONTH September 1976 DATE CO."IPZAEPTED BY V. T. CI)ZISO22 TEPP.PIION E OPERATI!:C STATUS I ~ REPORTZNC PERZOD. 0001, 76 09 V
01 CROSS EQUI)S XN R POIITZNG ?EIIZQO 2 720. 0 THROUGH 2400, 76. 09, 30 2~ CURP~~RIAfAY PR A!a PLS, - E'zr. L Vc L ()EPIC) ) 2 200
.NAE. DEPFRD. CAF.C 'I (Tt -It 41:2 DFSZCS c RZCAL R T NC -( lll R I: 4 3~ PO(IE,R LEVEL TO WHICH R-STRXCTED (ZF MIY) (AV)fe-tte~) ilO'IE 4 R-2)SOtIS FOR RESTRXCTZOiV (ZF ANY) 5.
6 uu!NER CP llcuRS REACTOR:I 2 C!I T REAC OR IKSEARV- SHUTDOIi'iu IIOURS C 'L '.. '...~4
.........
~
TH S HOST 0.0 4~
YEAR,AO DARE 0.0 CUYVULRATZV
~Z~4 117.1 7 HOURS CEIIERATOR Q:I 4
LI'IL.... ~ ~.......... 4. 430.1 4 630.7'.0 19 344'.3 S Ut:ZT RESERV. SHUTDONI'.I HOURS... ~... 0 0
~ 0.0 9 CROSS THERIAL ENERC' IIEFAATED (HA:IAI) ~ ~ ~ ~ ~ @~4 42 4~)9 lc. cRoss -I O.R'cAL EEF .c" c ".!: "')1 I
-D (Ni!u) .. ~44 L1J~)K3
- 11. N T CL-C RZC&, !'ERCY C ~::Z"4 ED ('Z"4) .. . ~44 ~29 %9
~4
~
....... ~2
~
- 12. P !CTOR S"IIVZC'-':AC.OA.......,
- 12. R=.ACTOR AVA L'll: E Y !'AC O!L.............'~ ~74 14 14.
~ UNXT SERVXCE:AC OR.
CSZT Avlz)luz z.z pic".DE.................
~4 F20
- 14. IINZT CAPACZTY PACTOR (II 1 g l)DC), ...... ~4 DR I . Nllal .. ~24 4
- 17. Dill. CAPACZ Y PAC OR (CS'.S 18 U)IIZT FORCED OUTAGE RP'ATE. ~
19 SHUTDON IS SCHEDU '0 OV" R NEET 6 )IO ~ HS (TYPE~ DA -, AVD DURA ZON El(CII}
OS'ONE
!
20 ZF SHUTOO'PIN A END OF F PORT P RXQD, ES ZHATED DA . OF STA'tTUP:
21 ~ Util S Ztl,EST STA US (PRIOR 0 CO:P'sc'RC 'RL QPE;POTION) ) FQMAST A I{"~V~~
XVXT Af CRXTXC IAIITZAL EfAECTRICZTY COYAIERCZPRL OPERATION I
I 4
0 APPENDIX D DOCKET 'HO. 50 - 251 REASOV UHIT SHVTDOHMS AND PTER REDUCTIONS UNIT MANE 'danke Pn(nt U (t Hn h: ECUIPX MT FAILURE (EXPLAIN)
- l: Mhltir OR T ST ~ DATE Oct. 4, 1976 c~ rcrvrLIEG D: >>ECUAToRY lu:s rnxcTIDN COMPLETED.DY:V. T. Chilson OPERATOR TRAIMIHG AMD
-
Fc G:
ll:
LICENSE EXAIIIMATIOM ALE lxH I STBATIVE OPEBATIOVAL ERROR (EXPLAIN)
OTIIER (EXPLAIN) Sheet 1 of 2
>>P TELEPHONE 05 552 3830
- 2) M TROD MET!lOD OF I: ttulVAL TYPE SHUTTING DOWN TllE REACTOR OR 2t 3t 4 s HAMVAL SCRAM AVTOllhTIC SCRAM OT!IEB (EXPLAIN)
'O. DATE Fs FORCED S. SCllrDULED DURATION (llOURS) REASON(l) REDUCING POHER(2) CORRECTIVE ACTIONS/Coill&NTS 16 76-09-Oj -N/A Load reduction to locate and repair condenser tube leak (Hon-Nuclear System) 17 76-09-10 155.5 A Unit Ho. 4 was removed from service to locate and repair tube leak in steam generator Ho. 40. There were no significant quantities of radioactive materials released as a result of'his small leak. Corrective action was to plug leakhng tube. (Nuclear System) 18 76-09-16 1.4 Reactor, wns tripped by stean generator No. 48 low level coincident with steam flow greater than ('eedwater flow caused by failure o(eedwnter control valve to open.
76-09-16 1.0 A Reactor was tripped by stcam generator Ho. 4A low level coincident with steam flow granter than feedwater f'low caused by failure oleedwater control valve to open.
Corrective actions included veri('ication of I'eedwater control system electrical connections. (Non-Nuclear System)
APPE!)DIX D DOCKET MO.
')
': Turkey Point Unit No. 4 RF~LSOM UNIT Sl!UTDOMNS AND PONER REDUCTIONS h: E~UIPMEMT FAILURE (EXPLAIN) i>lttT. OR TEST ~ DATE Act 1 6 C: REFUl:LIt!G D: REGULATORY RESTRICTION E: OPCl!ATOR TBAIMItlG AMD COMPLETED'Y V, T. Chllson LICENSE L'XAHItlATIOM Ft ADHIttISTBATIVE TELEPllotlE REPORT MOMTttz~i~enhi~v' G: Ol'ERATIOMAL ERROR (EXPLAIN) $6 ll: OT~ttL'It EXPLAIN)
Sheet 2 of 2 I) METHOD METIIOD OF I: MANUAL TYPE SllUTTIMG DOMM 2t MAMUAf SCRAM Ft FORCED DURATION Tllg REACTOR OR 3t AUTO)!ATIC SCRAM NO. DATE S: SCHEDULED (I!OURS ) -
REASON(1) REDUCING POI(ER(2) CORRECTIVE ACTIOttS/COHHEtlTS a t OTIIClt (EXPI bitt) 20 76-09-1 ,3.1 Unit was tripped during load increase by malfunction of'urbine load limit valve. (Non-Nuclear System) 21 76-09-1 5.2 Unit was tripped by actuation of generator lock-out relay caused. by malfunction of automatic voltage regulator system.
Corrective action included checking electrical connections to ensure proper contact.. (Hon.-.Nuclear..System) 22 76-09-2 A H/A Loud reduction to locate und repair condenser tube leuk.
(Hon-Nuclear System) 23 76-09-2) 1.5 Unit was tripped due to malfunction of'urbine loud limit valve. Corrective actions included repair of turbine loud limit valve mechuniaa during Sept. 23, 1976 outage.
(Hon-Nuclear Syste!a) 24 7o-09-2 122.7 A Unit wus rctaoved f'roa service to locate and repair tube leak in steam generator No. 4D. There were no significant, quantities of radioactive raaterials released as a result of t)tis small leak. Plugged leaking tube. (Nuclear System)
Unit Ho. 4 operated ut upproxftautely 100 C R.P. during month except l'or loud reductions on Sept. 6 and 20, 1976 and outuges - Sept. 10 to 16, Sept. 16, 18, 21, and Sept. 23 - 29, 1976.
APPE~iZX B AVERAGE DAZLY UNZT ?OWER L-V-L Doczm Ho. 50 - 251 DHzT Turke Point Unit No. 4 DATE Oct. 4 976 COMPLETED BY V.. i> on TELE P HO i~ (305) 552 3830
,I i
HOHTH September 1976 DAY AV RAGE DAZLY ?Oec,R M~~L DAY AVERAGE DAZLY ?OWER LEV:-L (HÃe-He t) (Kne-Net) 648 ~
17
" 594 1
18 474 3 6 19 669 4 20 633 21 481
.22 ~ 669 7 390 596 t 24 647 603 25 10 26
'27 12 28 13 29 545 30 662 16 '20 NOTE: Daily Power Level Greate Than 666)4We Due To.
Cooler Condenser Cooling Water.
~ ~
~ ~ ~ t ~ ~ 4 ~
~ i ~ ~
~ ~
~~ . ~
~ ~ 0 ~
~ ~ ~
~ ~
~ ~
~ ~
I ~
t ~
~ ~
~ ~
~ ~ ~ ~ ~ ~
~ ~ 4 ~
~ ~ ~ ~
\ ~
~ 2 JW tV aa ~ 6$ ~'RR IRE TPWQ~
,APPE:. IX D DOCX=T NO. >0 - u~
(
~ REIXSON VNIT SIIUTDO'(fNS A',ID PO'(IEA REDUCiIONS U:II'r HARE . St. Lucie Un'. Ho. 1 h: EQUIPaNFNT FAILURE (EXPLAIN) ffh lNT. OA TEST - . DATE Oct. /, 1976 c: rErUE LING )
0( REGULATORY RESTRICTION ~
CONPLEiED DY V. T. Ghilson Ef OPERATOR TRXZNZIIG AND LICENSE EXRQaIVaaXTION I'ELFPEONE ff!5) 059 lff F:
G:
AD:.IZI!ZSTrahriVE OP -
ilXTIO::AL ERIAOA (EXPLAIN) 1'EPOflT a2!ONT!I S((( ~l( r~76 U: OilX~!l EXPLhIN)
IXETfIUD f(ET!!OD OF I: RN)NUAL (
TYPE SIIUTTZhG D(FEIN ~
22 FANUAL SCAARI Ff FORCED DURATION TNE REACTOR OR 3f AUTO!IARIC SCP~Y4 iNO. DATE S: SCIIEDUlED (IIOUIIS) RERERE(1) RERREIRE RQi(ER(2) COARECTZVE ACTIONS COR!vaENTS 4 f OTIIER {EXPLAIN) 16 76-07-1 '/20.0 Vnit f(as removed From service ('r reactor tests and inspection. (Nuclear System) 2 Ei)a I(a . 1 reactor ins p ection continued durin g faont h .
APPEi'IDZX 8 AVERACE DAZLY QWZT PCCER L-VEL DOCENT wo. 50 - 335 mzT St. Lucie Unit No. 1 DATE Oct. 4 19'/6 r rED BY v. T. Chilson 'orn woRTE SeataWer 1976 DAY AVcRAC DAZLY POWER LEV=L DAY AVc.RACE DAZLY POWER LEVEL (HRe-Net ) (NÃe-Net) 17 18 I
3 19
~
4 20 21 22 7 23 t
8 24 25 10 26
'27 12 28 13 29 14 30 15 31 16