IR 05000395/2013001

From kanterella
Revision as of 22:54, 9 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Annual Assessment Letter for Virgil C. Summer Nuclear Station, Unit 1 - Report 05000395/2013001
ML14063A380
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/04/2014
From: King M F
NRC/RGN-II/DRP/RPB5
To: Gatlin T D
South Carolina Electric & Gas Co
References
IR-13-001
Download: ML14063A380 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 March 4, 201 4 Mr. Thomas Vice President

- Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065

SUBJECT: ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/20 1 3 00 1

Dear Mr. Gatlin:

On February 1 9, 201 4, the Nuclear Regulatory Commission (NRC)

completed its end

-of-cycle performance review of Virgil C. Summer Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 201 3. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Virgil C. Summer Nuclear Station, Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Virgil C. Summer Nuclear Station, Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 201 5. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid

-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security related inspections, which will be sent via separate, non

-publicly available correspondence.

Additionally, the NRC plan s on conducting three non-ROP baseline inspections which include Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping

- Phase 2, TI

-189, Inspection to Determine Compliance of Dynamic Restraint (Snubber) Program with 10 CFR 50.55a, and Independent Spent Fuel Storage Installation (ISFSI) Pad Construction. As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross

-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The CY 2013 end

-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross

-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross

-reference in IMC 0310 during the mid

-cycle assessment review and evaluated for cross

-cutting themes and potential substantive cross

-cutting issues in accordance with IMC 0305.

In accordance with 10 CFR 2.390 of the NRC

's "Rules of Practice, "a copy of this letter and it s enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room

).

Please contact me at 404-997-45 11 with any questions you may have regarding this letter.

Sincerely,/RA/ Michael F. King, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50

-395 License No.: NPF

-12

Enclosure:

Virgil C. Summer Inspection/Activity Plan (03/01/201 4 - 06/30/201 5)

_________________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE SON /RA/ Via email MFK /RA/ NAME SNinh JReece MKing DATE 02/27/2014 03/03/2014 03/04/2014 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Thomas from Michael F. King dated March 4, 2014

SUBJECT: ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/20 13 00 1 Distribution w/encl

C. Evans, RII L. Douglas, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource Institute of Nuclear Power Operations (INPO)

ROP Assessment

Page 1 of 2 03/04/2014 08:50:29 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SummerInspection / Activity Plan 03/01/2014

-06/30/2015TI-182-TI-182 BURIED PIPING/TANK - PHASE 2 1 1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 03/03/2014 03/05/2014 RP-RP OCCUPATIONAL BASELINE WEEK 1 3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/07/201404/11/2014 1 IP Occupational ALARA Planning and Controls71124.02 04/07/201404/11/2014 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/07/201404/11/2014 1 IP Occupational Dose Assessment71124.04 04/07/201404/11/2014 1 IP Radiation Monitoring Instrumentation71124.05 04/07/201404/11/2014 1 IP Performance Indicator Verification71151 04/07/201404/11/2014 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/14/2014 04/18/2014 RP-RP OCCUPATIONAL BASELINE WEEK 2 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/21/2014 04/25/2014 1 IP Occupational ALARA Planning and Controls71124.02 04/21/2014 04/25/2014 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/21/2014 04/25/2014 1 IP Occupational Dose Assessment71124.04 04/21/2014 04/25/2014 1 IP Radiation Monitoring Instrumentation71124.05 04/21/2014 04/25/2014 1 IP Performance Indicator Verification71151 04/21/2014 04/25/2014 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 2 1 IP Inservice Inspection Activities - PWR7111108P 04/21/2014 04/25/2014TI-189-TI-189 DYNAMIC RESTRAINT PROGRAM 1 1 IP Inspection to Determine Compliance of Dynamic Restraint (Snubber) Program with 10 CFR 50.55a 2515/189 04/21/2014 04/25/2014 ISFSI-ISFSI PAD CONSTRUCTION 1 1 IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 07/28/2014 08/01/2014 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1 IP Problem Identification and Resolution71152B 08/04/2014 08/08/2014 1 IP Problem Identification and Resolution71152B 08/18/2014 08/22/2014 EP-EP PROGRAM INSPECTION 3 1 IP A lert and Notification System Testing7111402 09/08/2014 09/12/2014 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 09/08/2014 09/12/2014 1 IP Emergency Action Level and Emergency Plan Changes7111404 09/08/2014 09/12/2014 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 09/08/2014 09/12/2014 1 IP Performance Indicator Verification71151 09/08/2014 09/12/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 03/04/2014 08:50:29 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SummerInspection / Activity Plan 03/01/2014

-06/30/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 6 1 IP Component Design Bases Inspection7111121 09/15/2014 09/19/2014 1 IP Component Design Bases Inspection7111121 10/06/2014 10/10/2014 1 IP Component Design Bases Inspection7111121 10/20/2014 10/24/2014 1 IP Component Design Bases Inspection711112111/03/201411/07/2014 TFPI-TRIENNIAL FIRE PROTECTION INSP 4 1 IP Fire Protection [Triennial]7111105T 04/20/2015 04/24/2015 1 IP Fire Protection [Triennial]7111105T 05/04/2015 05/08/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.