ML19325D403

From kanterella
Revision as of 18:13, 18 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Opportunity to Conduct Presentation to Include General Plans,Capabilities,Status & Certification of Plant Simulator Project.Proposes Presentation Be Made During Feb 1990
ML19325D403
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/11/1989
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Hunemueller N
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-89-124 VPNPD-89-530, NUDOCS 8910230218
Download: ML19325D403 (2)


Text

. - -

Msconson Electnc ro.e coumr  :'

231 W MICHIG AN.P o DOX 2046. MILWAUKEE,Wi 63201 (414) ??t.2345 VPNPD-89-530 NRC-89-124 ,

l October 11, 1989 i

U. S. NUCLEAR REGULATORY COMMISSION .

Document Control Desk l Mail Station Pl-137  :

Washington, D. C. 20555 l

Attention: Mr. Heal Hunemueller -

Operator Licensing Branch OWFN-10D18 ,

Gentlement DOCKETS 50-266 AND 50-301  !

PLANT SIMULATOR PRESENTATION l POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 [

The Point Beach Nuclear Plant Simulator Project began in April [

1988. The simulator is currently scheduled for delivery in l December 1990 and ready to be used for training in February

  • i 1991. Because of the unique nature of the Pojnt Beach simulator and the closeness of the delivery dLte to the I required certification date, Wisconsin Electric believes it to I be important to brief the NRC staff (simulator group) on the

, simulator's capabilities and unique features well in advance of

  • those dates.

We, therefore, request the opportunity to conduct a j presentation that would include the following:  ;

1 I 1. General Plans

2. Capabilities  ;
a. Modes of Operation
b. Unique features
c. Modeling approach
d. Software and control architecture ,

AnoF i

1 8910230218 891011 PDR ADOCK 05000266 p

FDC -

d

o ,  !

NRC Document Control Desk i October 11, 1989 l Page 2 +

l

3. Status of the Project l
a. Current
b. Potential problems  !
4. Certification  ;

r

a. Program overview l
b. Plan i We propose that a presentation ~be made in your offices sometime i during February 1990. Upon agreement of a suitable meeting date, we will confirm the. presentation date with a follow-up i letter, which would include a folder of material to be  ;

presented at the meeting. l Please contact our simulator coordinator, Steve Pullins, or our >

regulatory engineer, Jim Knorr, at 414-755-2321 if you have any questions concerning this matter. l Very truly yours, avu / f C. . Fay ,

Vice President Nuclear Power  ;

Enclosure l Copies to NRC Regional Administrator, Region III  !

NRC Resident Inspector j i

e r

i

..