Requests Opportunity to Conduct Presentation to Include General Plans,Capabilities,Status & Certification of Plant Simulator Project.Proposes Presentation Be Made During Feb 1990
ML19325D403
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/11/1989
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Hunemueller N
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-89-124 VPNPD-89-530, NUDOCS 8910230218
Download: ML19325D403 (2)


Text

. - -

Msconson Electnc ro.e coumr 231 W MICHIG AN.P o DOX 2046. MILWAUKEE,Wi 63201 (414) ??t.2345 VPNPD-89-530 NRC-89-124 l'

October 11, 1989 i

U. S. NUCLEAR REGULATORY COMMISSION l

Document Control Desk Mail Station Pl-137 Washington, D. C.

20555 l

Attention:

Mr. Heal Hunemueller Operator Licensing Branch OWFN-10D18 Gentlement DOCKETS 50-266 AND 50-301 PLANT SIMULATOR PRESENTATION l

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

[

The Point Beach Nuclear Plant Simulator Project began in April

[

1988.

The simulator is currently scheduled for delivery in l

December 1990 and ready to be used for training in February 1991.

Because of the unique nature of the Pojnt Beach i

simulator and the closeness of the delivery dLte to the I

required certification date, Wisconsin Electric believes it to I

be important to brief the NRC staff (simulator group) on the simulator's capabilities and unique features well in advance of those dates.

We, therefore, request the opportunity to conduct a j

presentation that would include the following:

1 I

1.

General Plans 2.

Capabilities a.

Modes of Operation b.

Unique features c.

Modeling approach d.

Software and control architecture AnoF i

1 8910230218 891011 PDR ADOCK 05000266 p

FDC d

o NRC Document Control Desk i

October 11, 1989 l

Page 2

+

l 3.

Status of the Project l

a.

Current b.

Potential problems 4.

Certification r

a.

Program overview l

b.

Plan i

We propose that a presentation ~be made in your offices sometime i

during February 1990.

Upon agreement of a suitable meeting date, we will confirm the. presentation date with a follow-up i

letter, which would include a folder of material to be presented at the meeting.

l Please contact our simulator coordinator, Steve Pullins, or our regulatory engineer, Jim Knorr, at 414-755-2321 if you have any questions concerning this matter.

l Very truly yours, avu /