ML19325D403
| ML19325D403 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/11/1989 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | Hunemueller N NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-89-124 VPNPD-89-530, NUDOCS 8910230218 | |
| Download: ML19325D403 (2) | |
Text
. - -
Msconson Electnc ro.e coumr 231 W MICHIG AN.P o DOX 2046. MILWAUKEE,Wi 63201 (414) ??t.2345 VPNPD-89-530 NRC-89-124 l'
October 11, 1989 i
U. S. NUCLEAR REGULATORY COMMISSION l
Document Control Desk Mail Station Pl-137 Washington, D. C.
20555 l
Attention:
Mr. Heal Hunemueller Operator Licensing Branch OWFN-10D18 Gentlement DOCKETS 50-266 AND 50-301 PLANT SIMULATOR PRESENTATION l
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
[
The Point Beach Nuclear Plant Simulator Project began in April
[
1988.
The simulator is currently scheduled for delivery in l
December 1990 and ready to be used for training in February 1991.
Because of the unique nature of the Pojnt Beach i
simulator and the closeness of the delivery dLte to the I
required certification date, Wisconsin Electric believes it to I
be important to brief the NRC staff (simulator group) on the simulator's capabilities and unique features well in advance of those dates.
We, therefore, request the opportunity to conduct a j
presentation that would include the following:
1 I
1.
General Plans 2.
Capabilities a.
Modes of Operation b.
Unique features c.
Modeling approach d.
Software and control architecture AnoF i
1 8910230218 891011 PDR ADOCK 05000266 p
FDC d
o NRC Document Control Desk i
October 11, 1989 l
Page 2
+
l 3.
Status of the Project l
a.
Current b.
Potential problems 4.
Certification r
a.
Program overview l
b.
Plan i
We propose that a presentation ~be made in your offices sometime i
during February 1990.
Upon agreement of a suitable meeting date, we will confirm the. presentation date with a follow-up i
letter, which would include a folder of material to be presented at the meeting.
l Please contact our simulator coordinator, Steve Pullins, or our regulatory engineer, Jim Knorr, at 414-755-2321 if you have any questions concerning this matter.
l Very truly yours, avu /
f C.
. Fay Vice President Nuclear Power Enclosure l
Copies to NRC Regional Administrator, Region III NRC Resident Inspector j
i e
r i
..