| mention of the EFW deficiencies acknowledged by GPU Nuclear in its lettar to the staff of August 23, 1983. The staff als~o~ voiced no opposition to GPU s | | mention of the EFW deficiencies acknowledged by GPU Nuclear in its lettar to the staff of August 23, 1983. The staff als~o~ voiced no opposition to GPU s |
| , proposal to delay correcting the acknowledged EFW deficiencies until the first refuel.ing after restart. H. iL !!ukill, Director, TMI-1, .ta J F. Stolz, iE staff, "TMI-1. . . Long Tem EFH Mods," August 23, 1983. (Licensee's counse' i | | , proposal to delay correcting the acknowledged EFW deficiencies until the first refuel.ing after restart. H. iL !!ukill, Director, TMI-1, .ta J F. Stolz, iE staff, "TMI-1. . . Long Tem EFH Mods," August 23, 1983. (Licensee's counse' i |
| sent this letter to the Commission by a cover letter dated September 15, 1983. | | sent this letter to the Commission by a cover {{letter dated|date=September 15, 1983|text=letter dated September 15, 1983}}. |
| Another copy is enclosed for your convenience.) ' | | Another copy is enclosed for your convenience.) ' |
| l | | l |
Line 56: |
Line 56: |
| ; jurisdiction of UCS' Petition for Show Cause Concerning TMI-1 Emergency i Feedwater System. In making this request, we do not mean to imply that the i | | ; jurisdiction of UCS' Petition for Show Cause Concerning TMI-1 Emergency i Feedwater System. In making this request, we do not mean to imply that the i |
| i staff should have no role. | | i staff should have no role. |
| By letter dated January 27, 1984, the staff asked GPU Nuclear to " submit , | | By {{letter dated|date=January 27, 1984|text=letter dated January 27, 1984}}, the staff asked GPU Nuclear to " submit , |
| a response in writing under oath or af.fimation that addresses each of the issues identified by the petition as related to Three Mile Island Nuclear Station, Unit -1 and provide a response to [the staff] as soon as practicable, but no later than February 22, 1984." UCS requests the Commission to direct the licensee to submit its response directly to the Comission. We also recuest the Comission to direct the NRC staff to provide a similar response, in writing under oath or affirmaion by the individual staff member or memoers vno prepare tne response. In addi tion, we recomend that the Commission 70ct the NRC staff to provide the following infomation: | | a response in writing under oath or af.fimation that addresses each of the issues identified by the petition as related to Three Mile Island Nuclear Station, Unit -1 and provide a response to [the staff] as soon as practicable, but no later than February 22, 1984." UCS requests the Commission to direct the licensee to submit its response directly to the Comission. We also recuest the Comission to direct the NRC staff to provide a similar response, in writing under oath or affirmaion by the individual staff member or memoers vno prepare tne response. In addi tion, we recomend that the Commission 70ct the NRC staff to provide the following infomation: |
| O | | O |
Line 97: |
Line 97: |
|
| |
|
| 1 TER Item Equipment Manufacturer Model Tac No(s). No. | | 1 TER Item Equipment Manufacturer Model Tac No(s). No. |
| Solenoid Valves ASCO 8300C6BG 'SV1/EF-V-30A&B 28 SV2/EF-V-30A&B Solenoid Valves ASCO LB83146 SV/EF-V-8A,8&C 31 D/P Switches Barton 277A FI-S-77,78&79 77 Confirm that the above is a complete list of the EFW system electrical equipment located in a harsh environment; or, if not, identify any additional equipment. For each item of additional equipment identified, provide all documentation relied upon to demonstrate qualification. The documentation should address the appropriate comments contained in the enclosure to the staff's April 25, 1984 letter to GPU. Justification for exempting from qualification of any additional equipment identified should be provided using the guidance noted below in 2.b. | | Solenoid Valves ASCO 8300C6BG 'SV1/EF-V-30A&B 28 SV2/EF-V-30A&B Solenoid Valves ASCO LB83146 SV/EF-V-8A,8&C 31 D/P Switches Barton 277A FI-S-77,78&79 77 Confirm that the above is a complete list of the EFW system electrical equipment located in a harsh environment; or, if not, identify any additional equipment. For each item of additional equipment identified, provide all documentation relied upon to demonstrate qualification. The documentation should address the appropriate comments contained in the enclosure to the staff's {{letter dated|date=April 25, 1984|text=April 25, 1984 letter}} to GPU. Justification for exempting from qualification of any additional equipment identified should be provided using the guidance noted below in 2.b. |
| 2.a Justification provided by GPU for exempting certain EFW system electrical equipment from qualification is given below. | | 2.a Justification provided by GPU for exempting certain EFW system electrical equipment from qualification is given below. |
| NAMC0 Limit Switches - TER Item Nos. 66 and 67 Under LOCA and MSLB sufficient flow is provided to the OTSG's by a single motor driven EFW pump. (See GPUN letter dated 3/22/83). The steam driven EFW pump is only required for station blackout which does not produce a harsh environment. Failure of the limit switch (MSB-6) with MSV-6 open may result in initially overfeeding the OTSG's which could be reduced immediately (Manually) based on qualified EFW flow and 0TSG level instrumentation. | | NAMC0 Limit Switches - TER Item Nos. 66 and 67 Under LOCA and MSLB sufficient flow is provided to the OTSG's by a single motor driven EFW pump. (See GPUN letter dated 3/22/83). The steam driven EFW pump is only required for station blackout which does not produce a harsh environment. Failure of the limit switch (MSB-6) with MSV-6 open may result in initially overfeeding the OTSG's which could be reduced immediately (Manually) based on qualified EFW flow and 0TSG level instrumentation. |
Line 105: |
Line 105: |
| These switches are used for diagnostic purposes only. Flow indication for the emergency feedwater system is provided by the qualified redundant flow indicators sensed by FT-779, 782, 788 & 791. They have been installed in accordance with the requirements of Item II.E.1.2 of NUREG-0737. A secondary indication of emergency feedwater flow is provided by the qualified steam generator level indication system. | | These switches are used for diagnostic purposes only. Flow indication for the emergency feedwater system is provided by the qualified redundant flow indicators sensed by FT-779, 782, 788 & 791. They have been installed in accordance with the requirements of Item II.E.1.2 of NUREG-0737. A secondary indication of emergency feedwater flow is provided by the qualified steam generator level indication system. |
| l ASCO Solenoid Valves - TER Item Nos. 26 and 28 l | | l ASCO Solenoid Valves - TER Item Nos. 26 and 28 l |
| As described in GPUN letter dated August 2,1982(82-183) GPUN has removed the EFW 1atch signal from the EFW control valves. Therefore this l solenoid is no longer required to be qualified. | | As described in GPUN {{letter dated|date=August 2, 1982|text=letter dated August 2,1982}}(82-183) GPUN has removed the EFW 1atch signal from the EFW control valves. Therefore this l solenoid is no longer required to be qualified. |
| l i | | l i |
| l | | l |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M0721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Pass Dates ML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L0061999-10-0101 October 1999 Discusses GL 97-06 Issued by NRC on 971231 & Gpu Response for Three Mile Island .Staff Reviewed Response & Found No New Concerns with Condition of SG Internals or with Insp Practices Used to Detect Degradation of SG Internals ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212K8771999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Three Mile Island on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Provides Historical Listing of Plant Issues & Insp Schedule ML20212K8551999-09-30030 September 1999 Informs That During 990921 Telcon Between P Bissett & F Kacinko,Arrangements Were Made for Administration of Licensing Exams at Facility During Wk of 000214.Outlines Should Be Provided to NRC by 991122 ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212J0011999-09-27027 September 1999 Forwards Insp Rept 50-289/99-07 on 990828.No Violations Noted ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211A4261999-08-19019 August 1999 Forwards Insp Rept 50-289/99-04 on 990606-0717.Two Severity Level 4 Violations Occurred & Being Treated as Noncited Violations ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210N7601999-08-10010 August 1999 Informs That NRC Staff Reviewed Applications Dtd 990629, Which Requested Review & Approval to Allow Authority to Possess Radioactive Matl Without Unit Distinction Between Units 1 & 2.Forwards RAI Re License Amend Request 285 ML20210N7191999-08-0606 August 1999 Forwards Notice of Partial Denial of Amend to FOL & Opportunity for Hearing Re Proposed Change to TS 3.1.12.3 to Add LCO That Would Allow Continued HPI Operation ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210B8231999-07-21021 July 1999 Forwards Exemption from Certain Requirements of 10CFR50.54(w) for Three Mile Island Nuclear Station,Unit 2 in Response to Licensee Application Dtd 990309,requesting Reduction in Amount of Insurance for Unit to Amount Listed ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20209H9401999-07-15015 July 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Application for Exemption Dtd 990309. Proposed Exemption Would Reduce Amount of Insurance for Onsite Property Damage Coverage as Listed ML20209G2451999-07-15015 July 1999 Advises That Suppl Info in Support of Proposed License Transfer & Conforming Adminstrative License Amends,Submitted in & Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident ML20216D9861999-07-12012 July 1999 Forwards RAI Re 981019 Application Request for Review & Approval of Operability & SRs for Remote Shutdown Sys. Response Requested within 30 Days of Receipt of Ltr ML20209G5861999-07-0909 July 1999 Forwards Insp Rept 50-289/99-05 on 990510-28.No Violations Noted ML20209F2571999-07-0909 July 1999 Forwards Staff Evaluation Rept of Individual Plant Exam of External Events Submittal on Three Mile Nuclear Station, Unit 1 ML20209D8451999-07-0808 July 1999 Forwards Insp Rept 50-289/99-06 on 990608-11.No Violations Noted.Overall Performance of ERO Very Good & Demonstrated, with Reasonable Assurance,That Onsite Emergency Plans Adequate & That Util Capable of Implementing Plan ML20209D6291999-07-0808 July 1999 Forwards Notice of Withdrawal & Corrected TS Pages 3-21 & 4-9 for Amend 211 & 4-5a,4-38 & 6-3 for Amend 212,which Was Issued in Error.Amends Failed to Reflect Previously Changes Granted by Amends 203 & 204 ML20209D5141999-07-0808 July 1999 Forwards RAI Re 981019 Application & Suppl ,which Requested Review & Approval of Revised Rc Allowable Dose Equivalent I-131 Activity Limit with Max Dose Equivalent Limit of 1.0 Uci/Gram.Response Requested within 30 Days 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License ML20196J7651999-06-29029 June 1999 Provides Updated Info Re Loss of Feedwater & Loss of Electric Power Accident Analyses to Support TS Change Request 279 Re Core Protection Safety Limit,As Discussed at 990616 Meeting ML20196J7701999-06-29029 June 1999 Forwards LAR 285 for License DPR-50,clarifying Authority to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls May Continue to Be Moved Between TMI-1 & TMI-2 Units ML20209C0391999-06-29029 June 1999 Forwards LAR 77 to License DPR-73,clarifying Authority to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-2 License to Amergen,Radioactive Matl May Continue to Be Moved Between TMI-1 & TMI-2 Units ML20196G2061999-06-23023 June 1999 Requests That NRC Update Current Service Lists to Reflect Listed Personnel Changes That Occurred at TMI 05000289/LER-1999-006, Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements1999-06-23023 June 1999 Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements ML20196D2171999-06-17017 June 1999 Forwards Pmpr 99-9, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990508- 0604.New Summary Personnel Table Was Added to Rept Period.Matl Scientist Joined Staff Period ML20196A0431999-06-15015 June 1999 Providess Notification That Design Verification Activities Related to Calculations Supporting Analytical Values Identified in Gpu Nuclear Ltr to NRC Has Been Completed 05000289/LER-1999-004, Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT1999-06-0909 June 1999 Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT ML20212K2541999-06-0808 June 1999 Submits Concerns Re Millstone NPP & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Requests That NRC Provide Adequate Emergency Planning in Case of Radiological Accident ML20212K2671999-06-0808 June 1999 Submits Concerns Re Millstone NPP & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Requests That NRC Provide Adequate Emergency Planning in Case of Radiological Accident ML20195E2751999-06-0404 June 1999 Informs That PCTs & LOCA Lhr Limits Submitted in Util Ltr for LOCA Reanalysis Performed in Support of TMI-1 20% Tube Plugging Amend Request Have Been Revised.Revised PCT & LOCA Lhr Limit Values Are Provided on Encl Table 1 ML20195E3281999-06-0404 June 1999 Forwards Application for Amend to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20195C5721999-06-0202 June 1999 Forwards Description of Gpu Nuclear Plans for Corrective Actions for 1 H Fire Barriers in Fire Zones AB-FZ-3,AB-FZ-5, AB-FZ-7,FH-FZ-2 & Previous Commitments for Fire Zones CB-FA-1 & FH-FZ-6 ML20207E2561999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Change in ECCS Analyses at TMI-1 ML20195B2461999-05-21021 May 1999 Forwards Itemized Response to NRC 990506 RAI for TS Change Request 279 Re Core Protection Safety Limit ML20206R6461999-05-13013 May 1999 Forwards Rev 39 of Modified Amended Physical Security Plan for TMI 05000289/LER-1999-003, Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC1999-05-0707 May 1999 Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC ML20206K6301999-05-0707 May 1999 Provides Addl Info Re TMI-1 LOFW Accident re-analysis Assumptions for 20% Average SG Tube Plugging as Discussed on 990421 ML20206H0781999-04-30030 April 1999 Forwards Rev 0 to 1092, TMI Emergency Plan. Summary of Changes Encl ML20206J4811999-04-30030 April 1999 Provides Summary of Activities at TMI-2 During First Quarter of 1999.TMI-2 RB Was Not Inspected During Quarter.Routine Radiological Surveys of Auxiliary & Fuel Handling Bldgs Did Not Identify Any Significant Adverse Trends ML20206E4121999-04-27027 April 1999 Requests That TS Change Request 257 Be Withdrawn ML20206C5211999-04-23023 April 1999 Requests Mod to Encl Indemnity Agreement Number B-64,on Behalf of Gpu & Affiliates,Meed,Jcpl,Penelec & Amergen Energy Co,Llc.Ltr Supersedes & Withdraws 990405 Request Submitted to NRC ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 1999-09-09
[Table view] Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
MONTHYEARML20055F5681990-07-11011 July 1990 Forwards TMI Citizens Monitoring Network Rept for June 1990. No Unusual Events Reported.Stations 9,10 & 11 Added to Network & Three Addl Monitors to Go on-line for Jul ML20246P4131989-07-0707 July 1989 Presentation of Argument.* Informs That Author Will Present Argument on Behalf of Susquehanna Valley Alliance & TMI Alert on 890726 Re Appeal of Initial Decision LBP-89-7.Svc List Encl ML20245E9551989-06-17017 June 1989 FOIA Request for TMI-2 Accident Rept ML20245G2091989-05-23023 May 1989 Requests Commission to Require Continuation of Existing real-time & Other Monitoring in Vicinity of TMI Reactors in Commonwealth of Pa.Status Rept of Current & Proposed Monitoring in TMI Area by Entities Including Util Requested ML20244C1211989-04-11011 April 1989 Forwards Susquehanna Valley Alliance/Tmi Alert Table of Authorities Inadvertently Left Out of Brief in Support of Notification to File Appeal.W/Certificate of Svc ML20244D8721989-03-23023 March 1989 Raises Concerns Re Unexplained Actuation of Warning Siren at Plant,Located Less than 1 Mile from Author Residence ML20235N1781989-01-26026 January 1989 FOIA Request for Easter Sunday Dosimetry Rept, Ref in Ha Falk 790426 Memo ML20205R4191988-10-31031 October 1988 Requests Time to Make Brief Statement at 881103 Special Hearing on Disposal of Water Generated by 1979 Accident at Plant.Served on 881104 ML20205R6061988-10-24024 October 1988 Requests Time to Make Statement During Special Hearing Re Issue of Public Health & Safety Concerning Disposal of Water from Tmi.Served on 881103 ML20205F7441988-10-24024 October 1988 Requests to Make Oral Statement at Hearing Re Disposal of accident-generated Water at TMI-1.Served on 881024 ML20205F7671988-10-22022 October 1988 Requests Time to Speak at 881103 Hearing in Lancaster,Pa Re Util Plan to Evaporate 2.3 Million Gallons of Radioactive Water Generated by 1979 Accident at Tmi.Served on 881027 ML20206D9711988-09-0808 September 1988 Forwards Ltrs Exchanged Between NRC & Author in 1984 Re Problems in Commercial Nuclear Power Field & Change in Federal Regulations to Allow Senior Reactor Operator to Deviate from Tech Specs in Emergency ML20153D0641988-08-24024 August 1988 Requests Hearing Date for Wk of 881114 Instead of 881031 to Suit Author Witnesses ML20206E0281988-07-0707 July 1988 Advises That Nuclear Industry Overlooked Most Important Lesson Resulting from TMI Accident,To Wit,That Station Operator/Mgt Official Stationed in Control Room Would Have Prevented Accident ML20150D5991988-07-0707 July 1988 Advises That Piccioni Affidavit Noted in Susquehanna Valley Alliance & TMI Alert 880620 Response to Licensee Motion for Summary Disposition Will Not Be Received Due to Piccioni Schedule Not Permitting Completion of Affidavit ML20197F5421988-06-0202 June 1988 FOIA Request for Documents Including 811110 Generic Ltr 81-38 & Nrc/Tmi 83-062 ML20206E0361988-04-29029 April 1988 Opines That 10CFR50.54(x) & (Y) Superfluous & Dangerous.Nrc Should Instruct Operators Not to Depart from Tech Specs in Emergency.Author Resume Detailing Experience in Commercial Nuclear Power Field Encl ML20151P0001988-04-20020 April 1988 Requests Time on Agenda of Next Prehearing Conference Re Disposal of accident-generated Water at TMI-2 So That Author Can Make Oral Statement.Served on 880420 ML20154K2551988-04-0909 April 1988 Requests Info Re Radiological Releases from TMI-2 Accident on 790328 as Recorded by in-plant Monitoring Equipment for First 42 H of Accident.Radioiodine Releases Measured by Iodine Monitoring Sampler Should Also Be Included ML20151D0701988-03-22022 March 1988 Forwards Radiation Monitoring Sys for Nuclear Power Plants (W/Special Ref to TMI Nuclear Power Station) ML20195J1161988-01-12012 January 1988 Requests That Author Name Be Placed on List of Individuals Speaking at Prehearing Conference Re Deposition of accident- Generated Water at Plant.Served on 880120 ML20195J0761988-01-0606 January 1988 Requests Permission to Make Comments at Hearing on Disposal of Water at Tmi.Served on 880120 ML20148H7551988-01-0404 January 1988 Opposes Plan to Steam Vent Radioactive Water from Tmi. Local Residents Should Not Have to Suffer Any Further Health Risks as Result of Util Negligence.Served on 880125 ML20234B9891987-12-22022 December 1987 Opposes Release of Any Radioactive Contaminants.Release of Radioactive Vapor Will Continue to Contaminate Area & Further Seepage Not Warranted.Served on 880104 ML20149G1051987-12-18018 December 1987 Opposes NRC Reduction at TMI-2.Reducing Staff Prior to Completion of Core Removal Inappropriate & Misguided Move. Recent Shutdown of Oyster Creek for Incident Re Destruction of Data Decreases Util Standing W/Local Residents ML20237C5831987-12-16016 December 1987 FOIA Request for Documents Re Nuclear Leak at Plant ML20237E7401987-12-0808 December 1987 Requests Opportunity to Comment Before ASLB on Proposed Evaporation of 2.3 Million Gallons of Radioactive Water from Facility.Served on 871217 ML20237E7321987-12-0707 December 1987 Requests to Make Comment on Util Proposed Evaporation of Accident Generated Water at Facility Before Aslb.Served on 871217 ML20236G8491987-10-15015 October 1987 FOIA Request for Ofc of Investigations & Ofc of Inspector & Auditor Repts Re Ucs Request for NRC Investigation Whether Gpu Made Matl False Statements Concerning Environ Qualification of Safety Equipment at Facility ML20235V1311987-09-24024 September 1987 FOIA Request for Procedures Used to Obtain Sample of Water Known as Accident Generated Water Contained in TMI-2, Including Location from Which Sample Drawn,Number of Samples,Method for Analysis & Analysis of Water ML20235T7341987-09-0101 September 1987 Requests That EIS Documents Re Meltdown Prepared by Impartial Sources Be Made Available to Public.Observation of Plant Life Indicates Level of Contamination of General Environ Causing Widespread Severe Damage ML20237L6681987-08-31031 August 1987 Informs That Author Will Present 20 Minute Oral Argument on Behalf of C Husted.Requests That 5 Minutes Be Reserved for Rebuttal ML20235Y9631987-07-16016 July 1987 Comments on Inadequacies in Board 870522 Recommended Decision on TMI-2 Leak Rate Rept Falsifications.Board Decision,If Allowed to Stand,Will Cause Further Erosion of Morale of All Operators ML20235M1391987-07-0909 July 1987 Requests That General Council Recommend to Commission That Order in CLI-85-02 Be Vacated as to GP Miller.No Basis for Condition in Record Compiled by Presiding Board Exists. Related Correspondence ML20215D6371987-06-12012 June 1987 Forwards Reply to Responses from NRC & B&W Owners Group. NRC Response Evidences No Independent Review of B&W Claims. Commission Urged to Take Personal Jurisdiction of Petition to Ensure That Latest Commitment Not Frustrated ML20214S1881987-06-0101 June 1987 Requests That Aslab Include in Briefing Schedule Brief Period within Which Husted & Parties Supporting Appeal Might File Reply ML20215M5141987-05-0707 May 1987 Requests That Comments Made by E Sternglass & R Piccioni to Citizens Advisory Panel in Harrisburg on 870325,be Accepted as Official Part of Comments on NRC Suppl to EIS ML20215M5051987-04-11011 April 1987 Comments on Draft Suppl 2 to Programmatic EIS Re Decontamination & Disposal of Radwastes.Urges Commission to Disapprove NUREG-0683,EIS Suppl & Order Complete & Reliable Scientific Study of Environ Impacts ML20205A2971987-03-19019 March 1987 FOIA Request for Attachments Q-W to 810107, IE Inspectors Alleged Failure to Rept Info Re 790328 Hydrogen Explosion at TMI-2, Authored by Ofc of Inspector & Auditor ML20215M2101987-03-0303 March 1987 Comments on Draft Suppl 2 to Programmatic EIS for Disposal of Radioactively Contaminated Water Stored at Tmi.Util Should Demonstrate Expertise at Monitoring Safe Storage of Contaminated Water ML20212D0611987-02-24024 February 1987 Notifies of Intent to Respond to GP Miller Motion Re Board Refusal to Take Official Notice of Attachment 1 to Findings of Fact,Filed 870202.Response to Be Served 870302 ML20212B7251987-02-21021 February 1987 Comments on Suppl 2 to NUREG-0683 Re Decontamination of Facility Resulting from 790328 Accident.More Info Re Assumptions Made in Calculations Suggested.Epa Figure of Normal Operation of Liquid Emissions from Plant Encl ML20211D0541987-02-16016 February 1987 Forwards Listed Documents Re Inquiry Into Facility Leak Rate Data Falsification,Including GP Miller Reply to Aamodt Proposed Findings of Fact & Motion to Disregard Attachment 1 to Aamodt Proposed Findings of Fact ML20211D2141987-02-16016 February 1987 Informs That GP Miller Declines Presiding Board Offer to Submit Comments on Numerous Employees 870123 Memorandum of Law Re Inquiry Into Facility Leak Rate Data Falsification. W/Certificate of Svc ML20210N4751987-02-0303 February 1987 Forwards Errata to 870202 Proposed Findings of Fact Re Leak Rate Data Falsification,Correcting Dates.Copy Also Annotated to Refer Reader to Documentation on Record.Control Room Logs for Stated Period Will Not Be Included,Per 870203 Telcon ML20211B6601987-01-0505 January 1987 FOIA Request for Documents Re Allegations,Investigations, Fines,Convictions & Other Dispositions of Cases in Which Operators of Listed Facilities Charged W/Violating Federal whistle-blowing Statutes ML20211Q7421986-12-0808 December 1986 FOIA Request for Rept of Performance Appraisal Team 860825- 0905 Review of TMI-1 ML20203P0791986-10-0909 October 1986 Disagrees W/Conclusion & Finding That E Wallace Should Have Notification Requirement Lifted Based on Lack of Review of Record or Finding That Record Flawed or Unfair.Served on 861015 ML20215C6891986-10-0202 October 1986 Requests Eg&G Rept Re Status of Facility Released in Apr 1985,to Clarify Statements in NRC Cleanup Project Status Rept Concerning reactor-related Radiation ML20212H4991986-09-30030 September 1986 Forwards Summary of Major Events Occurring on Day 31 from B&W Trial Records.Questions Re Steam Generators Raised 1990-07-11
[Table view] |
Text
__
= - -
.../ u)
W ko a
UNION OF "
. CONCERNED .
SCIFNTISTS uo c_. u u u.w. . s. uot. % moou . ym -
8405210035 840503 PDR ADOcK 05000289 February 13, 1984 P PDR Nunzio J. Palladino, Chairman .
Victor Gilinsky, Connissioner Thomas M. Roberts, Connissioner James K. Asselstine, Commissioner Frederick M. Bernthal, Commissioner 1
Gentlemen: -
i On January 20, 1984, UCS petitioned the Commission for "an order-suspending the operating license for Three Mile 1siano Nuclear Station Unit - l No.1 ('TMI-l') tinless and until the plant's Emergency Feedwater ('EFW') System complies with the NRC rul,es applicable to systems important to safety (including safety-grade, safe ty-rel ated, and engineered safety feature
, systems)." Union of.ConcerneFScientists' Petition for Show Cause Concerning TMI-1 Emergency Feedwater System,' ~ January 20, 1984, p. 1. UCS' petition was
" lodged with the Commission directly because the NRC staff has reconnended restart of TMI-1 witn full Knowledge of the EFW deficiencies discussed [in the petition] and because the Connission now has under consideration action which would allow TMI-1' to operate oy lifting the 'innediate effectiveness' of its ordars of July and August,1979." g.,p.2,emphasisadded.
ByletterdatedJanut.ry27,'1}iB4,JHarold R. Denton informed me that UCS' petition "has been referred to [his) office for treatment as a recuest for action pursuant to Section 2.20G of the Commission's regul ations. "
s I am unaware of any Connission meeting or vote by which the Conunission referred UCS' petition to the NRC staff. 'Therefore, I as writing to inquire by what i means UCS' request that the Commission itself take jurisdiction was denied I and, if in fact it was denied, to request reconsideration of that denial. l I
The NRC staff was fully aware of the deficiencies in the TMI-1 EFW system '
(and the Main Steam Line., Aupture Detection System) before UCS filed its petition. Every citationgthe EFW deficiencies discussed in UCS' petition relies upon Licensing Boar 6 or Appeal ~ Board decisions, documents which GPU vovided to the NRC staff, or report:i prepared by the staff's contractors or the staff itself. Thus, . UCS' petiton contains no new factual information previously unavailable to the NRC ^ staff. By virtue of its continued inaction,.
the staff has manifested its views on these subjects; Connission delegation of the petition to the staff will simply delay resolution.
With regard 'to tha - q'd estion 'of whether, given the documented deficiencies -
the EFW system, TEI-1 sh.mid be allowed to operate, the staff has already
. . tided an implicit answer. On December 5. -1983, the staff presented its nroposal for TMI-1 restart conditions to the Connission. The staff made no
. - _ - . . - . - - . - - - - . . - _ - - _ - ~ _ - - - _ - - _ .
l7 ~
mention of the EFW deficiencies acknowledged by GPU Nuclear in its lettar to the staff of August 23, 1983. The staff als~o~ voiced no opposition to GPU s
, proposal to delay correcting the acknowledged EFW deficiencies until the first refuel.ing after restart. H. iL !!ukill, Director, TMI-1, .ta J F. Stolz, iE staff, "TMI-1. . . Long Tem EFH Mods," August 23, 1983. (Licensee's counse' i
sent this letter to the Commission by a cover letter dated September 15, 1983.
Another copy is enclosed for your convenience.) '
l
! The NRC staff's intention to ignore the EFW system deficiencies (or, at
- bast, to " decouple" ' these issues from restart) was disclosed explicitly on January 27, 1984. Immediately after the Comission meeting that day regarding l TMI-1, an i ndividual approached Robert D. Pollard in my presence and
- identified himself as a member of the NRC staff. The individual congratulated Mr. Pollard on the quality of the technical content of UCS' petition even though he "would probably be the one assigned to shoot it down."
This is only the most recent example of an attitude consistently exhibited by the NRC staff, which I most recently discussed with you during the Comission meeting on November 17,'1983. As UCS told the Commission:
No matter how technically credible an intervenor may be nor what legitimate issues it raises, the Staff makes virtually no attempt to meet with intervenors, to seriously consider whether their technical concerns have validity and whht if, any corrective action should be taken. Instead, the S.taff's imediate knee-jerk response is to find some justification for opposing the intervenor's positions on all ,
substantive and procedural issues, a stance which continues during the entire licensing process. "The State of the Nuclear Industry ~ and the NRC: A Critical View," UCS, November 17, 1983, p. 15.
The fact that a member of the NRC staff expressed his belief, one week after UCS mailed the Comissio' its petition, that the purpose of the staff's review of UCS' petition is to " shoot it down," illustrates that the staff's knea-jerk opposition to even legitimate safety issues is deeply ingrained. It also demonstrates the utter futility of referring UCS' petition to the staff.
I'In sumary , we repeat our request tha't the Comission itsel f take
- jurisdiction of UCS' Petition for Show Cause Concerning TMI-1 Emergency i Feedwater System. In making this request, we do not mean to imply that the i
i staff should have no role.
By letter dated January 27, 1984, the staff asked GPU Nuclear to " submit ,
a response in writing under oath or af.fimation that addresses each of the issues identified by the petition as related to Three Mile Island Nuclear Station, Unit -1 and provide a response to [the staff] as soon as practicable, but no later than February 22, 1984." UCS requests the Commission to direct the licensee to submit its response directly to the Comission. We also recuest the Comission to direct the NRC staff to provide a similar response, in writing under oath or affirmaion by the individual staff member or memoers vno prepare tne response. In addi tion, we recomend that the Commission 70ct the NRC staff to provide the following infomation:
O
- -2 . . - - . - - . . - - - - - - , . , -
,-%,,-,c.-.,-%-, - - _ . , , , - . -,--,,,,-,,,,,-,,--,,.r-e--,
- 1. Identify each specific aspei:t of the TMI' 1 EFW system which does not I comply or is not known to comply with the regulations applicable to systems imporant to safety (including safety-grade, safety-rel ated, and engineered safety feature systems).
- 2. For each deficiency or potential deficiency identified in response to item 1 above, explain whether and why the . staff believes that TMI-1 can be .
' operated without undue risk to public health and safety before correction of !
tha deficiency or potential deficiency.
l l
- 3. For each deficiency or potential deficiency which the staff believes need not be corrected before the first refueling outage after restart, explain )
why that' deficiency ever needs to be corrected. In other words., if the staff believes that the plant can be operated without undue risk to public health and safety until the first refueling, why would modifications be needed to assure public health and safety after the first refueling?
Finally, UCS requests the Comission to direct the staff to provide UCS with copies of GPU's, the staff's and any other responses to UCS' petition.
Sincerely, -
. I-- -
'\.
E13yn'R. Weiss GeneN Counsel Union of Concerned Scientists
Enclosure:
As stated.
cc w/ enclosure:
Docketing and Service, NRC
'l c= w/o enclosure:
-Herzel P1aine, Esq.
Gen ral Counsel, NRC
! Harold R. Denton, Director ~
Office of Nuclear Raactor Regulation Mr. Henry D. Hukill .
l Director of TMI-1, GPU Nuclear Corp.
I Maxine Woelfling, Esq.
PA Dept. of Environmental Resources Thomas A. Baxter, Esq.
I Ccunsel for Licensee l
- - , - - - - .-- - - - .-,----a , _ , , , ,
REQUEST FOR ADDITIONAL INFORMATION ENVIRONMENTAL QUALIFICATION OF EFW SYSTEM ELECTRICAL EOUIPMENT RESPONSE TO UCS 2.206 PETITION OF JANUARY 20, 1984 0FFICE OF NUCLEAR REACTOR REGULATION THREE MILE ISLAND, UNIT 1 ,
DOCKET NO. 50-289 l
- 1. Following is a list of EFW system electrical equipment, located in a potentially harsh environment area identified by GPU.
TER Item Eouioment Manufacturer Model Taa No(s). No.
Motorized Valve Limitorque SMB-0 EF-V2A&B 11 Actuators Motorized Valve Limitorque SMB-000 EF-VIA&B 15 Pump Motors Westinghouse HP 450 EF-P2A&B 51 Cable Continental Wire 107 and Cable Co.
Cable Kerite 106 Diodes Square D JTXIN6071A Replaced 116 Terminal Block States NT 110 Flow Transmitters Foxboro NE 13DM FT-791, 799, None 782 & 788 E/P Converters Bailey RP-1211C SP-V5A&B 60 Limit Switches Namco D2400X2. LSA/MSV06 66 LSB/MSV-6 Limit Switches Namco D1200G2 LSA/MSV-13A&B 67 LSB/MSV-13A&B Limit Switches Fisher LS/EFV-30A&B None Solenoid Valves ASCO LB8201C94 SV3/EF-V-30A&B 26 SV4/EF-V-30A&B l _
1 TER Item Equipment Manufacturer Model Tac No(s). No.
Solenoid Valves ASCO 8300C6BG 'SV1/EF-V-30A&B 28 SV2/EF-V-30A&B Solenoid Valves ASCO LB83146 SV/EF-V-8A,8&C 31 D/P Switches Barton 277A FI-S-77,78&79 77 Confirm that the above is a complete list of the EFW system electrical equipment located in a harsh environment; or, if not, identify any additional equipment. For each item of additional equipment identified, provide all documentation relied upon to demonstrate qualification. The documentation should address the appropriate comments contained in the enclosure to the staff's April 25, 1984 letter to GPU. Justification for exempting from qualification of any additional equipment identified should be provided using the guidance noted below in 2.b.
2.a Justification provided by GPU for exempting certain EFW system electrical equipment from qualification is given below.
NAMC0 Limit Switches - TER Item Nos. 66 and 67 Under LOCA and MSLB sufficient flow is provided to the OTSG's by a single motor driven EFW pump. (See GPUN letter dated 3/22/83). The steam driven EFW pump is only required for station blackout which does not produce a harsh environment. Failure of the limit switch (MSB-6) with MSV-6 open may result in initially overfeeding the OTSG's which could be reduced immediately (Manually) based on qualified EFW flow and 0TSG level instrumentation.
Therefore, the EFW system will function and the operator will not be misled.
Failure of the limit switch (MSB-13) results in the inability to monitor valve position and may result in lifting reliefs but tecause of qualified EFW flow and OTSG level this will not mislead the operator.
Fisher Limit Switches - No TER Item No.
These switches are used for diagnostic purposes only. Flow indication for the emergency feedwater system is provided by the qualified redundant flow indicators sensed by FT-779, 782, 788 & 791. They have been installed in accordance with the requirements of Item II.E.1.2 of NUREG-0737. A secondary indication of emergency feedwater flow is provided by the qualified steam generator level indication system.
l ASCO Solenoid Valves - TER Item Nos. 26 and 28 l
As described in GPUN letter dated August 2,1982(82-183) GPUN has removed the EFW 1atch signal from the EFW control valves. Therefore this l solenoid is no longer required to be qualified.
l i
l
. I i
ASCO Solenoid Valves - TER Item No. 31 These EF bypass valves have been electrically disconnected and remain open.
Barton D/P Switches - TER Item No. 77
! These switches are associated with the valves, TER Item No. 31 and are no longer required to indicate valve position since the valves remain open.
- b. The licensee is required to provide the following information before we can determine the acceptability of the above justifications.
NAMCO Limit Switches
- 1. An analysis of the effects that failure of the limit switches could have an other electrical equipment important to safety, e.g., if the switches are used in an interlock circuit for other equipment.
. 2. A discussion of the c.nergency procedures used by the operator, whether j
the operator is directed to rely on information from these limit switches for valve positions, how and when the operator will manually i and "immediately" reduce overfeeding of the OTSGs in the event the limit switches on MSV-6 fail, and why qualified EFW flow and OTSG level preclude the operator from being misled if the limit switches
, on MSV-13 fail.
- 3. A discussion on the desirability of the operator needing to "immediately (manually)" reduce overfeeding the OTSGs because of failure of the MSV-6 limit switches, and the desirability of relief valves lifting because of MSV-13 limit switches failing.
i Fisher Limit Switches
- 1. Same as 1. above for limit switches.
- 2. A discussion of the emergency procedures used by the operator and whether these procedures direct the operator to rely on information from these limit switches.
ASCO Solenoid Valves
- 1. An analysis of the effects that failure of the solenoid valves could i have on other electrical equipment. important to safety, e.g.,
! disruption of Class IE power on the circuit to which the solenoid valves are connected.
- 2. For TER Item No. 31, provide the justification for qualification exemption.
9 L
,,,. .-- --- - , _ - - .-n, 1 - a--.~-r- ---,- -~w e --- - - -w ~n -~-~
Barton D/P Switches
- 1. Address failure of these D/P switches similar to 1. above for the limit switches.
- 2. A discussion of the emergency procedures used by the operator and whether these procedures direct the operator to rely on information from these D/P switches.
, 3. Provide the justification for qualification exemption.
1 I
4 1
l
_ w - , , _ . . - _ - ,-
, - _ _ _- ,- - , - , - , , -,-r , - - , -