                                                              Appendix
                                                    NOTICE OF VIOLATION
                  Union Electric Company                                                          Docket No. 50-483
                  As a result of the inspection conducted on June 25 through September 3, 1985,
                  and in accordance with the General Policy and Procedures for NRC Enforcement
                  Actions 10 CFR Part 2, Appendix C, the following violation was identified:
                  Technical Specification 3.2.1, Axial Flux Difference (AFD), Action a. states,
                  in part:
                        "With the indicated AFD outside of the required target band and with
                        THERMAL POWER greater than or equal to 90% of RATED THERMAL POWER,
                        within 15 minutes, either:
                        1.  Restore the indicated AFD to within the above required target band
                              limits, or
                        2.  Reduce THERMAL POWER to less than 90% of RATED THERMAL POWER."
                  Contrary to the above, on August 17, 1985, while at 90% to 100% reactor
                  Thermal Power, the reactor was operated beyond the allowable target band for
                  an accumulated time of 141 minutes.
                  This is a Severity Level IV violation (Supplement 1).
                  The inspection showed that licensee action had been taken to correct the
                  violation and to prevent recurrence. Consequently, no reply to this violation
                  is required and we have no further questions regarding this item.
                  Dated
                        VbS/95                                                $h4cb
                                                                            N. J. Chrisfotimbs, Chief
                                                                                                          M
                                                                            Reactor Projects Branch 2
                      8510080614 850927
                      PDR    ADOCK 05000483
                      G                  PDR
-_    - _ _ -____                                  _-_-_- _ _          _ _      _ _ _ _ _ - - _ _                  .
                                                                                                                      _-
}}
}}

Revision as of 17:09, 30 June 2020

Notice of Violation from Insp on 850625-0903
ML20138A702
Person / Time
Site: Callaway, 05000625 Ameren icon.png
Issue date: 09/25/1985
From: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20138A698 List:
References
50-483-85-16, NUDOCS 8510080614
Download: ML20138A702 (1)


See also: IR 05000625/2009003

Text

,

-

.

Appendix

NOTICE OF VIOLATION

Union Electric Company Docket No. 50-483

As a result of the inspection conducted on June 25 through September 3, 1985,

and in accordance with the General Policy and Procedures for NRC Enforcement

Actions 10 CFR Part 2, Appendix C, the following violation was identified:

Technical Specification 3.2.1, Axial Flux Difference (AFD), Action a. states,

in part:

"With the indicated AFD outside of the required target band and with

THERMAL POWER greater than or equal to 90% of RATED THERMAL POWER,

within 15 minutes, either:

1. Restore the indicated AFD to within the above required target band

limits, or

2. Reduce THERMAL POWER to less than 90% of RATED THERMAL POWER."

Contrary to the above, on August 17, 1985, while at 90% to 100% reactor

Thermal Power, the reactor was operated beyond the allowable target band for

an accumulated time of 141 minutes.

This is a Severity Level IV violation (Supplement 1).

The inspection showed that licensee action had been taken to correct the

violation and to prevent recurrence. Consequently, no reply to this violation

is required and we have no further questions regarding this item.

Dated

VbS/95 $h4cb

N. J. Chrisfotimbs, Chief

M

Reactor Projects Branch 2

8510080614 850927

PDR ADOCK 05000483

G PDR

-_ - _ _ -____ _-_-_- _ _ _ _ _ _ _ _ _ - - _ _ .