ML20138A695

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-483/85-16 on 850625-0903 & Notice of Violation
ML20138A695
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/27/1985
From: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20138A698 List:
References
NUDOCS 8510080611
Download: ML20138A695 (2)


See also: IR 05000483/1985016

Text

~ ,

L

I

' ' .S Yh 0

i

SEP 2 7 s35

l

Docket No. 50-483

'

Union Electric Company

ATTN: Mr. Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, M0 63166

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. B. H. Little,

.

C. H. Brown, and R. L. Nelson of this office on June 25 through

! September 3, 1985, of activities at Callaway Plant, Unit 1, authorized by NRC

-

Operating License No. NPF-30 and to the discussion of our findings with

Mr. S. E. Miltenberger and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during <

1 the inspection. Within these areas, the inspection consisted of a selective

j examination of procedures and representative records, observations, and

{

interviews with personnel.

"

During the inspection, certain of your activities appeared to be in violation

of regulatory requirements, as described in the enclosed Appendix. The

inspection showed that the violation was given prompt high level attention

and that action had been taken to correct the violation and prevent recurrence.

(Refer to Paragraph 3. b. of attached inspection report). Consequently, no

reply to the Notice of Violation is required and we have no further questions

regarding this matter at this time.

4 In accordance with 10 CFR 2.790 of-the Commission's regulations, a copy of this

i

letter and the enclosure will be placed in the NRC's Public Document Room.

!

l

_

8510080611 850927

PDR ADOCK 05000483

G PDR

t I

[

- - . - . - - . . - . .

3 O_I--

. - - . - - - -- - . _ = - . .. -- - - . . - = - - . .

.

..

.

4

SEP 2 71965

! Union Electric Company 2

, ,

! We will gladly discuss any questions you have concerning this inspection.

>

Sincerely,

i

N. J. Chrissotimos, Chief

Reactor Projects Branch 2

i

Enclosures:

i 1. Appendix, Notice

j of Violation i

2. Inspection Report

No. 50-483/85016(DRP)

cc w/ enclosures:

W. H. Weber, Manager, Nuclear

l Construction

S. E. Miltenberger, Plant Manager

R. L. Powers, Assistant Manager ,

i Quality Assurance

DCS/RSB (RIDS)

I

Licensing Fee Management Branch

Resident Inspector, RIII

j Region IV

K. Drey

Chris R. Rogers, P.E.

Utility Division, Missouri

Public Service Commission

SNUPPS

.

i

i

i

i-

i

2

i RIII RIII RIII RIII /b r'

H [rh - hu'emann )eed Chrissotimos

) 09/23/85 10f

,

l

i

{

. . . . . . . . . , . , - . - . . . - , - , - . . - . - , . - . . . _ _ -

.

. ~ _ - . - - , - . - , - , . - . - . . . - . . . - - , - -