Docket No. 50-483 Union Electric Company As a result of the inspection conducted on February 26 through April 28, 1987, i
and in accordance with the " General Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the following violation was identified:
Technical Specifications Section 6.8.1.a requires that established written i
procedures, as reconnended by Appendix A of Regulatory Guide 1.33, Revision 2, be implemented, which includes containment Leak-Rate testing.
Engineering Surveillance Procedure ESP-GP-01007, Revision 1, specifies how the Reactor l
Building Integrated Leak Rate Test is to be performed. Pages 41 and 42 of Attachment B to ESP-GP-01007 Revision 1 specifies that valve EC-V082 in the i
Fuel Pool Cooling and cleanup system be open.
Contrary to the above on April 26, 1987, Fuel Pool Cooling and Cleanup Vent Valve EC-V082 was found in the closed position, although Attachment B to Procedure ESP-GD-01007, Revision 1, showed that the valve had been opened on April 21 and verified open on April 22, 1987.
This is Severity Level V violation (Supplement I).
Pursuant to the provisions of 10 CFP. 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:
(1)correctiveaction taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
fAl
'Charleir W. YetW, Chief Dated Operations Branch n
.. i i
8706050294 870529
.-l,'
PDR ADOCK 05000483.