ML17081A453: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 20: Line 20:
           *-This Event has been retracted!!!                        ***This Event has been retracted !!!
           *-This Event has been retracted!!!                        ***This Event has been retracted !!!
Part 21 (PAR) .                                                                                Event#,      52502 Rep Org: C&D TECHNOLOGIES, INC.                                Notification Date I Time: 01/20/2017 16:01    (EST)
Part 21 (PAR) .                                                                                Event#,      52502 Rep Org: C&D TECHNOLOGIES, INC.                                Notification Date I Time: 01/20/2017 16:01    (EST)
    '
Supplier: C&D TECHNOLOGIES                                            Event Date I Time: 11/23/2016          (EST)
Supplier: C&D TECHNOLOGIES                                            Event Date I Time: 11/23/2016          (EST)
Last Modification: 03/20/2017 Region: 1                                                  Docket#:
Last Modification: 03/20/2017 Region: 1                                                  Docket#:
Line 35: Line 34:
  "Based on this review the Interim. Report (NRC Log No. 2016-00-06) dated January 20, 2017 is retracted. If you have any questions or wish to discuss this matter, please contact                                                          *
  "Based on this review the Interim. Report (NRC Log No. 2016-00-06) dated January 20, 2017 is retracted. If you have any questions or wish to discuss this matter, please contact                                                          *
  "Robert Malley VP Quality and Process Engi'neering bmalley@cdtechno.com (215) 619-7830" Notified R1 DO (Bickett), R2DO (Ernstes), R3DO (Orlikowski), R4DO (Drake), Part 21/50.55 Reactors group, and Part 21 Materials group.
  "Robert Malley VP Quality and Process Engi'neering bmalley@cdtechno.com (215) 619-7830" Notified R1 DO (Bickett), R2DO (Ernstes), R3DO (Orlikowski), R4DO (Drake), Part 21/50.55 Reactors group, and Part 21 Materials group.
***********************************************************************************************************************************


C:DTECHNOLOGIES, INC.
C:DTECHNOLOGIES, INC.

Latest revision as of 19:31, 4 February 2020

Part 21 - Plastic Jar Dedication Sampling
ML17081A453
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Perry, Indian Point, Fermi, Harris, Saint Lucie, Point Beach, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Brunswick, Limerick, River Bend, Vermont Yankee, Diablo Canyon, Vogtle, Waterford, Farley, Robinson, Clinton, Cook, Fort Calhoun, FitzPatrick, LaSalle, 05000001
Issue date: 03/20/2017
From: Lauzon A
C&D Technologies
To: Jeffrey Herrera
Office of Nuclear Reactor Regulation
References
52502
Download: ML17081A453 (3)


Text

..

0312012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel

  • -This Event has been retracted!!! ***This Event has been retracted !!!

Part 21 (PAR) . Event#, 52502 Rep Org: C&D TECHNOLOGIES, INC. Notification Date I Time: 01/20/2017 16:01 (EST)

Supplier: C&D TECHNOLOGIES Event Date I Time: 11/23/2016 (EST)

Last Modification: 03/20/2017 Region: 1 Docket#:

City: BLUE BELL Agreement State: Yes County: License#:

State: PA NRC Notified by: ARMAND LAUZON Notifications: SILAS KENNEDY R1DO HQ Ops Officer: JEFF HERRERA LADONNA ~UGGS R2DO Emergency Class: NON EMERGENCY AARON McGRAW R3DO 10 CFR Section: GREG WERNER R4DO 21.21 (a)(2) INTERIM EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL PART 21 MATERIALS EMAIL PART 21 - PLASTIC JAR DEDICATION SAMPLING The following is an excerpt of a part 21 re.ceived via email:

"The purpose of this letter is to provide the NRG an interim report in general conformity to the requirements of 10CFR Part 21.21 (a)(2). During an internal audit in November 2016, the sampling plan for dedication of plastic jars used in 1E battery cells was reviewed. Two lot numbers are associated with each plastic jar, a material lot number and a molding number. A material lot may encompass several molding lots. The dedication sampling plan was based on the material lot, and may not have properly sampled variations in critical characteristics generated b) molding lots. An analysis of historical data is underway to determine whether any deviations to specifications for critical characteristics may have occurred, and whether these possible deviations could represent a defect as defined by Part 21. C&D expects that this analysis will be completed by March 20, 2017.

The facilities where the components have been supplied are:

Arkansas Nuclear One, Limerick, Beaver Valley, Millstone, Braidwood, Monticello, Browns Ferry, Nine Mile Point, Byron, Oconee, Clinton, Palisades, Columbia, Perry, Cook, Point Beach, Cooper, Prairie Island, Crystal River, River Bend, Diablo Canyon, Robinson, Duane Arnold, Salem, Farley, Sequoyah, Fermi, St. Lucie, Fitzpatrick, Summer, FLCalhoun, Susquehanna, Grand Gulf, Three Mile Island, Harris, US Navy, Hatch, Vogtle, Hope Creek, Vermont Yankee, Indian Point, Waterford, Watts Bar, LaSalle "If you have any questions or wish to discuss this matter or this report, please contact "Robert Malley

  • VP Quality and Process Engineering bmalley@cdtechno.com

0312012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Page2 (215) 619-7830"

      • RETRACTION ON 3/20/17 AT 1602 EDT FROM ROBERT MALLEY TO DONG PARK***

The following is an excerpt of a part 21 received via email:

"Based on this review the Interim. Report (NRC Log No. 2016-00-06) dated January 20, 2017 is retracted. If you have any questions or wish to discuss this matter, please contact *

"Robert Malley VP Quality and Process Engi'neering bmalley@cdtechno.com (215) 619-7830" Notified R1 DO (Bickett), R2DO (Ernstes), R3DO (Orlikowski), R4DO (Drake), Part 21/50.55 Reactors group, and Part 21 Materials group.

C:DTECHNOLOGIES, INC.

Power Solutions 1400 Union Meeting Road Blue Bell, PA 19422 Phone: (215) 619-2700 Fax: (215) 619-7887 March 20, 2017 VIA ELECTRONIC TRANSMISSION Nuclear Regulatory Commission Operations Center hoo.hoc@nrc.gov

Subject:

Retraction of Interim Report - Plastic Jar Dedication Sampling On January 20, 2017 C&D Technologies submitted an interim Part 21 report regarding the issue of dedication of plastic containers used in nuclear safety related battery systems. In the interim report C&D reported that an internal audit had discovered an issue with lot numbers used to perform sample selection for parts dedication. Dedication sampling and testing had been based on larger material lots vs smaller molding lots.

A detailed review of plastics dedication testing has been performed by C&D. )"his review concludes that the sampling issue does not pose a substantial safety ~azard for Class 1E products in the field.

This review included analysis of field and return data (cracked jar incidence rate below 0.002% and no operability failures), confirmation that the critical characteristics of material identification and strength were properly sampled, and confirmation that the dimensional analysis that was performed ~

from 2011 to present never resulted in the rejection of any plastic lots.

Based on this review the Interim Report (NRG Log No. 2016-00-06) dated January 20, 2017 is retracted. If you have any questions or wish to discuss this matter, please contact Robert Malley VP Quality and Process Engineering bmalley@cdtechno.com (215) 619-7830 s~. .

Armand Lauzon Jr.

Chairman and Chief Executive Officer C&D Technologies Cc: D. Anderson R. Malley S. DiMauro L. Carson

'J. Anderson J. Link