Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML19295D7322019-10-11011 October 2019 Engine Systems, Inc. Report No. 10CFR21-0125, Rev. 1 - Signal Converter Transmitter ML19207A0562019-07-19019 July 2019 Engine Systems, Inc. - Part 21 Report 10CFR21-0125, Rev. 0, for a 10CFR21 Reportable Notification on a Signal Converter Transmitter ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML15217A3092015-08-0101 August 2015 Notification of Part 21 - Report Involving Limit Switches EA180 and EA170 Manufactured in a Specific Date Range ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation2014-04-11011 April 2014 Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13094A1772013-03-18018 March 2013 Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by Aaf ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13010A5182013-01-0909 January 2013 Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12342A3732012-12-0606 December 2012 Notification of Potential Part 21 Report Re ESI Refurbished Emergency Diesel Generator Cylinder Head with Foreign Material in Intake Port ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12045A5272012-02-0303 February 2012 Part 21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR-0104, Rev. 0, NPPD Fuel Hose, P/N 2-01H-050-003 ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1018907392010-07-0101 July 2010 Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm NLS2008101, 10 CFR 21 Notification - Identification of Defect2008-12-0202 December 2008 10 CFR 21 Notification - Identification of Defect ML0810701722008-04-0909 April 2008 Notification of Potential Part 21 Regarding Torus Immersion/Vapor Phase Coatings 2019-07-19
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARNLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays ML19295D7322019-10-11011 October 2019 Engine Systems, Inc. Report No. 10CFR21-0125, Rev. 1 - Signal Converter Transmitter ML19219A1522019-07-22022 July 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0125, Rev. 0, Signal Converter Transmitter P/N SCT/4-20MA/4-20MA/24DC/-LIM-TA(DCM) ML19207A0562019-07-19019 July 2019 Engine Systems, Inc. - Part 21 Report 10CFR21-0125, Rev. 0, for a 10CFR21 Reportable Notification on a Signal Converter Transmitter ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19165A0272019-06-0505 June 2019 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0125-INT, Rev. 0 ML19168A0122019-05-31031 May 2019 Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18087A0032018-03-21021 March 2018 Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML18079A0142018-03-0606 March 2018 Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17114A0702017-04-13013 April 2017 Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards ML17090A3972017-03-28028 March 2017 Part-21 Notification - Willful Misconduct and Falsification of Records ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14134A1212014-05-0909 May 2014 Notification of Potential Part 21 - Potential Defect in General Electric Type CR120AD Control Relays W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation2014-04-11011 April 2014 Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation ML14101A3432014-04-10010 April 2014 Notification of Part 21 - Potential Defect in General Electric Type CR120 AD Control Relays ML14094A4452014-04-0101 April 2014 Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems ML14069A4682014-03-0202 March 2014 Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13073A1072013-03-12012 March 2013 Notification of Potential Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13024A0302013-01-0909 January 2013 MPR Associates Inc., Interim Report in Accordance with 10 CFR Part 21 ML13010A5182013-01-0909 January 2013 Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12342A3732012-12-0606 December 2012 Notification of Potential Part 21 Report Re ESI Refurbished Emergency Diesel Generator Cylinder Head with Foreign Material in Intake Port ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12045A5272012-02-0303 February 2012 Part 21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR-0104, Rev. 0, NPPD Fuel Hose, P/N 2-01H-050-003 ML12038A0292012-02-0303 February 2012 Part 21 Report- Foreign Material Found in Emergency Diesel Generator High Pressure Fuel Hose ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld 2023-09-06
[Table view] |
Text
1111 05: 13:33 p.m. 07-19-2019 1 /5 ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount, NC 27804 Telephone: 252/977-2720 Fax: 252/446-1134 TELEFAX Date: July 19, 2019 Company: N~C Operations Center Fax Number: 301/816-5151 Verification No.:
Reference:
Report No. 10CFR21-0125, Rev. 0 From: Dan Roberts Page: 1 of 5
Dear Sir:
Following this cover is a copy of our Report 10CFR21-0125; Rev.a, for a 10CFR21 reportable notifjcation on a* signal converter transmitter, PIN SCT/4-20MA/4-20MA/24DC/-LIM-TA[DCM]. This is a follow-up to our interim report 10CFR21-0125-INT, Rev. O, Issued on'June 5,.2019. Our evaluation determined that the deviation is reportable in accordance with 10CFR21 Part 21.
A copy of the report will be mailed to the NRC Document Control Desk and to our affected nuclear customer.
Should you have questions, please let us know.
Sincerely, a fhlrr ENGINE SYSTEMS, INC.
Dan Roberts Quality Manager
/sJw
.Quality Performance With Pride
1111 05:13:49p.m. 07-19-2019 2 /5 ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount. NC 27804 Telephone: 2521977-2720 Fax:: 252/446-1134 Report No. 10CFR21*0125 Rev. O: 07/19/19 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: Signal Converter Transmitter P/N SCT/4-20MA/4-20MA/24DC/-LIM-TA[OCM]
SYSTEM: Steam Turbine Control CONCLUSION: Reportable in Accordance with 10CFR21
\-i-+-L-~,___
P~epared By:___,,...,... ._________
& Engineering Manager Reviewed By:----~=---~-------,;;;-=------
Quality Assurance Manager Date: 7 /J9/1q Quality Performance With Pride
1111 05:14:01 p.m. 07-19-2019 3 /5 Report No. 10CFR21-0125 Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 07/19/19 Initial issue.
1111 OS: 14:09 p.m. 07-19-2019 4/5 Report No. 10CFR21-0125 Revision: 0 Date: 07/19/19 Page: 1 of2
SUMMARY
On June q, 2019, Engine Systems Inc. (ESI) Issued Interim re.port 10CFR21-0125-INT, rev.O regarding an*
Identified deviation for which ESI wa1;1 unable to complete an evaluation within the 60-day requirement. Per the interim report, E:SI committed to complete the evaluation by July 31, 2019. The evaluation Is now complete and the deviation Is detennlned to be reportable in accordance with 10CFR Part 21.
Pursuant to 10 CFR 21.21(d)(4), ESI ls presenting the required Information as follows:
(i) Name and address of the Individual or Individuals informing the Commission.
John Kriesel Dan Roberts Engineering Manager Quality Manager Engine Systems Inc. Engine Systems Inc.
175 Freight Rd. 175 Freight Rd.
Rocky Mount, NC 27804 Rocky Mount, NC 27804 (ii) Identification of the basic component supplied within the United States which fails to comply or contains a defect.
- Signal Converter Transmitter, PIN SCTl4-20MA/4-20MA/24DCI-LIM-TA[DCM].
(Iii) Identification of the firm supplying the basic component which fails to comply or contains a defect.
Engine Systems Inc. (ES/)
(iv) Nature of the defect or failure to comply and the safety hazard which Is created or could be created by such defect of failure to comply. *
- A power inverter transformer, Internal to the signal oonverter transmitter, failed shorted*. The transformer failure adversely affected .other circuit board mounted *components which prevented the device from functioning properly.
- The signal converter transmitter ls a component of a turbine control panel. Within the panel, the
- transmitter Is used to sense the customers remote speed setpoint 4-20 mA Input signal and convert the signal to an isolated 4-20 mA output signal which is transmitted to the turbine control.
The transmitter includes a limiting function where If the Input signal is below 4 mA, the minimum output Is limited to 2. 7 mA and If the 'Input signal is above 20 mA, the maximum output is limited to 21.3 mA. Since the signal converter transmits the customer's remote speed setpafnt Input to the turbine control, operabl/ity of the device is critical to operation of the RCIC turbine control system. Therefore, a failure of the signal converter would adversely affect the RCIC turbine control system and thus may affect the safe shutdown of the reactor. *
(v) The date on which the information of such defect or failure to comply was obtained.
April 6, 2018
{vi} In the case of a basic component which contains a defect or fails to comply, the number and location of these components In use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more faclllties or activities subject to the regulations in this part.
ES/Sales C-of-CDate Mfg Sada/
End User End User P.O. Qty Order . Number Cooper Nuclear Station Contract 09-69A 8001553 1 09128/2015 2379741 (supplied through Dresser-Rand) P.O. 200441 (D-R)
Notes: (1) The signal converter was installed In a control panel assembly PIN 8001553-01 {qty 1 per panel).
(2) This is the faned device; therefore, no other suspect devices are Installed In safety-related service.
1111 OS: 14:40 p.m. 07-19-2019
- S /5 Report No. 10CFR21-0125 Revision: 0 Date: 07/19/19 Page: 2of2 (vii) The corrective action which has been, Is being, or will be taken; the name of the lndlvldual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
For Cooper Nuclear:
The failed component has been removed and replaced with a spare transmitter from a dffferent batch. No further action ls necessary.
ForESI:
The previous design transformer (used in the failed transformer) was discontinued by transformer manufacturer in 2016 which required the signal converter transmitter manufacturer to source a new transformer. The new transformer has the same functionality with a slightly dffferent form factor which minimizes the potential for common cause failure with the original style transformer.
Therefore. no additional actions are required since a different transformer ls In current use. ES/
has included a verification of the cu"ent transformer design in the commercial grade dedication package. *
(viii) Any advice related to the potential defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.