MONTHYEARML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML22303A0042022-08-31031 August 2022 Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Supply of 6 NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company Pvt. Ltd.; Heat No: N200309AW01, SR No: 7; 9 Pcs; 180 Feet Total Procured as Unquali ML22259A1732022-08-26026 August 2022 EN 55960 - Curtiss Wright Part 21 Report Re Potential Defect in Configuration of the Quick Disconnect Connector Cable Assemblies Supplied to McGuire and Catawba Nuclear Power Stations ML22201A1012022-07-18018 July 2022 Framatome, Inc. - 10 CFR Part 21 Notification of Existence of a Defect and Failure to Comply ML22222A0092022-07-0101 July 2022 EN 55974 - Flowserve, Part 21 Report Re Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for Use on FWIV Actuator RA-22-0127, Interim Part 21 Report of a Deviation or Failure to Comply for Cutler-Hammer Relay2022-04-0808 April 2022 Interim Part 21 Report of a Deviation or Failure to Comply for Cutler-Hammer Relay ML20073G4572020-03-0909 March 2020 Carrier Corporation - Final Report Notification of Defect Pursuant to 10 CFR Part 21 for 17FA999-1200-107 Oil Pump ML20024D8232020-01-10010 January 2020 Carrier Corp., Interim Report/Notification of Defect Pursuant to 10 CFR Part 21 ML20016A2202020-01-10010 January 2020 Carrier - Interim Report/Notification of Defect Pursuant to 10 CFR Part 21 ML19346H8732019-12-12012 December 2019 Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18269A1122018-09-12012 September 2018 Engine Systems, Inc. Report No. 10CFR21-0122, Rev. 0 - 10CFR21 Reporting of Defects and Non-Compliance ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17173A1392017-06-0909 June 2017 Engine Systems, Inc. - Transmittal of 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0117, Rev. 0 ML17165A4072017-06-0909 June 2017 Part 21 Report - Defective Motor Operated Potentiometer ML16328A3102016-11-18018 November 2016 Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 MNS-16-078, Written Notification Joslyn Clark Overload Heater Element Part No. 24552016-10-19019 October 2016 Written Notification Joslyn Clark Overload Heater Element Part No. 2455 ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16281A2712016-09-30030 September 2016 Part 21 - Safety Related Component Welding by an Unqualified Welder ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16281A2722016-09-19019 September 2016 Part 21 Notification - Joslyn Clark Overload Heater Element Part Number 2455 ML16243A4752016-08-26026 August 2016 Part 21 Safety Related Component Welding by an Unqualified Welder ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML16196A0642016-07-10010 July 2016 Part 21 Report - Materials Not Properly Dedicated ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16127A5952016-05-0404 May 2016 Rotork Controls Inc. Part 21 Notification Concerning V12 (Pt No. N69-921) and K5 (N69-838 & N69-926) Safety Related Micro Switches ML16258A4562015-11-0505 November 2015 Part-21 Report - Closed Switch Not Actuating When Valve Is Fully Closed ML15303A0062015-10-26026 October 2015 Part 21 Report Regarding Closed Switch No. Actuating When Valve Is Fully Closed, Per Catawba Nuclear Station ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML14094A4452014-04-0101 April 2014 Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems ML14085A0122014-03-21021 March 2014 Notification of Part 21 - Sbm Selector Switches Contact Assembly Unplanned Manufacturing Change ML13284A0842013-10-0303 October 2013 Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302 ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13102A3032013-04-10010 April 2013 Part 21 Involving a Potential Weld Defect ML13099A0932013-04-0505 April 2013 Part 21 Report of Limitorque Valves with Incorrect Motor Nameplates Installed ML13079A3202013-03-18018 March 2013 Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12356A3022012-11-27027 November 2012 Notification of Potential Part 21 Report Involving Performance of Npt Stamped Cavitrol III Plugs at Catawba Nuclear Station ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12219A2312012-08-0303 August 2012 Us NRC 10CFR Part 21 Notification from Flowserve on Seal Cap for Kerotest 3/4, 1, 1-1/2, and 2 Y-Type Globe Valves ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition 2023-07-14
[Table view] |
Text
From:Curtis Wright 2"16433"1640 08/26/2022 "14:"10 #200 P.00"1/002 CURTISS- Nuclear Division 18001 Sheldon Road WRIGHT Middleburg Heights, OH 44130 T: 216.267.3200 www.curtisswright.com/NuclearDivision 18! Urgent D Please Reply Fax To: /4ef(C. Date Sent: ~/'2v>h,,z,3 Company: Nf<C Of1/'Cl*hMs Ce-. fe,- From: (),, 0 Ge<,,""'
Fax: G301) zSI(,, -5 IS/ Company: Cu~f,55 (,J ":JA /-
Number Pages: 1&or:t;v:;fvcl", WJl, i\,il Phone: (J,s-c,,) G:>2'(- rJO/
cc:
From:Curtis Wright 2"16433"1640 08/26/2022 "14:"1"1 #200 P.002/002 Nuclear Division CURTISS- 18001 Sheldon Road WRIGHT Middleburg Heights, OH 44130 www.cwnuclear.com File Number (H22-6438)
August 26, 2022 To whom it may concern:
In pursuance of compliance to Federal Regulation 10CFR21, this letter is issued to provide closure for notification issued June 24, 2022 of the potential defect in a configuration of the 1 1/2 Inch Quick Disconnect Connector (P/N: 913602-111) cable assemblies supplied to Duke Energy under procurement documents 30129014, 03121479, 03114993 and 03124438 for a total of 19 connectors at the McGuire and Catawba Nuclear Power Stations. We have a high degree of confidence that this is limited to these supply of cables.
Of the 19 connectors, 11 have been returned to Curtiss-Wright and have been confirmed to have the suspected defect. Curtiss-Wright will be working with Duke Energy to have these connector assemblies replaced. Due to the nature of the defect and installation routines of the plant, for items installed at Duke Energy we have reasonable assurance that these connectors do not pose an immediate safety risk but could cause damaged during routine maintenance associated with the connectors and should be replace at earliest convenience.
To prevent this from reoccurring, Curtiss-Wright will implement an inspection activity to verify the absence of burrs and/or sharp edges of all fittings that could potentially cause damage which could prevent the items from performing its intended safety function.
For additional information, please contact Jim Tumlinson, Director of Operations (256-425-8037),
Christopher Covan, Quality Assurance Manager (256-624-7301), or Tim Franchuk Director of Quality (513-201-2176). ,....---* '\ -------/
Sincerely,
//
/
/
~/ ,,_,...---*
Chris Cova Quality Assurance Manager Curtiss-Wright Nuclear Division 18001 Sheldon Rd Middleburg Height, OH 44130