Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML22259A1732022-08-26026 August 2022 EN 55960 - Curtiss Wright Part 21 Report Re Potential Defect in Configuration of the Quick Disconnect Connector Cable Assemblies Supplied to McGuire and Catawba Nuclear Power Stations ML22201A1012022-07-18018 July 2022 Framatome, Inc. - 10 CFR Part 21 Notification of Existence of a Defect and Failure to Comply RA-22-0127, Interim Part 21 Report of a Deviation or Failure to Comply for Cutler-Hammer Relay2022-04-0808 April 2022 Interim Part 21 Report of a Deviation or Failure to Comply for Cutler-Hammer Relay ML21271A2342021-09-23023 September 2021 EN 55282 (Updated) - Framatome Part 21 Reportable Defect - Vacuum Breakers ML20073G4572020-03-0909 March 2020 Carrier Corporation - Final Report Notification of Defect Pursuant to 10 CFR Part 21 for 17FA999-1200-107 Oil Pump ML20024D8232020-01-10010 January 2020 Carrier Corp., Interim Report/Notification of Defect Pursuant to 10 CFR Part 21 ML20016A2202020-01-10010 January 2020 Carrier - Interim Report/Notification of Defect Pursuant to 10 CFR Part 21 ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) MNS-16-078, Written Notification Joslyn Clark Overload Heater Element Part No. 24552016-10-19019 October 2016 Written Notification Joslyn Clark Overload Heater Element Part No. 2455 ML16281A2712016-09-30030 September 2016 Part 21 - Safety Related Component Welding by an Unqualified Welder ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2722016-09-19019 September 2016 Part 21 Notification - Joslyn Clark Overload Heater Element Part Number 2455 ML16243A4752016-08-26026 August 2016 Part 21 Safety Related Component Welding by an Unqualified Welder ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16127A5952016-05-0404 May 2016 Rotork Controls Inc. Part 21 Notification Concerning V12 (Pt No. N69-921) and K5 (N69-838 & N69-926) Safety Related Micro Switches ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML14303A2582014-10-27027 October 2014 10 CFR Part 21 Notification of an Error in Powerplex MCPR and LHGR Limit Input for Browns Ferry, Unit 2 ML14085A0122014-03-21021 March 2014 Notification of Part 21 - Sbm Selector Switches Contact Assembly Unplanned Manufacturing Change ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13102A3032013-04-10010 April 2013 Part 21 Involving a Potential Weld Defect ML13079A3202013-03-18018 March 2013 Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12219A2312012-08-0303 August 2012 Us NRC 10CFR Part 21 Notification from Flowserve on Seal Cap for Kerotest 3/4, 1, 1-1/2, and 2 Y-Type Globe Valves ML11287A1392011-10-13013 October 2011 Stations - Amended 10CFR21 Notification - Identification of Defect Mackson, Inc. - Defective Tube Steel - NRC Event Number 46375 ML11186A8912011-07-0101 July 2011 Notification of Potential Part 21 Seal Failure and Leakage Associated with Model B5497-301 Valves ML11116A0962011-04-18018 April 2011 Submittal of 10 CFR 21 Notification - Identification of Defect Problem Investigation Process No.: M-11-01725 ML1108907632011-03-29029 March 2011 Notification of Potential Part 21 Re Paint Chips Discovered in Woodward Governors ML1106701702011-03-0404 March 2011 Notification of Potential Part 21 - Error in Value Body Drawing ML1105506152011-02-22022 February 2011 Duke Energy - Notification of Potential Part 21 Re Identification of Defect ML1102800152011-01-24024 January 2011 Notification of Potential Part 21 - Bus Disconnect Stab Assembly - 600V Essential Motor Control Centers ML1030601022010-10-29029 October 2010 Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves ML1025304462010-09-0808 September 2010 Rotork Inc. Part 21 Notification Sintered Gear ML1009200932010-03-25025 March 2010 10 CFR21 Notification of a Potential Weld Defect ML0925800812009-09-0909 September 2009 Notification of Potential Part 21 Involving Woodward Governors Using Unapproved Supplier Integrated Circuits ML0925902502009-09-0909 September 2009 Notification of Potential Part 21 Re Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0097, Rev. 0. Woodward 2301A & DRU with Unapproved Supplier IC, P/N: 9903-303, 9903-337, 9903-444 and 9903-470 ML0924300492009-08-27027 August 2009 Part 21 Notification of an Error in LaSalle Units 1 & 2 Power Dependent MCPR and LHGR Operating Limits Calculation Due to High Measured Liftoff ML0911002862009-04-16016 April 2009 Notification of Potential Part 21 on Interim Report of an Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0904104852009-02-0606 February 2009 Notification of Potential Part 21 Report (Draft) Re Defective ASME SA-193, Grade 6 Cap Screw Material ML0903502172009-01-27027 January 2009 Notification of Potential Part 21 Report from Fisher Controls International - Water Quality Deficiency ML0903502112009-01-16016 January 2009 Part 21 Report Re Identification of Defect Found in Basic Component. Initially Reported to NRC on 12/18/2008 2023-07-14
[Table view] |
Text
framat ome July 18, 2022 NRC:22:012 U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 10 CFR Part 21 Notification of Existence of a Defect and Failure to Comply This letter provides notification of a reportable defect and failure to comply in accordance with 10 CFR Part 21. This defect and failure to comply was reported to the NRC Operations Center by email at 2:29 p.m. EST on July 13, 2022.
The defect concerns the failure of Eaton relay to change state. The failure to comply concerns failure to perform an evaluation within 60 regulatory days from the date of discovery.
Actions already taken to address the defect and failure to comply are provided in the attachment to this letter.
If you have any questions related to this information, please contact Ms. Gayle Elliott, Deputy Director, Licensing and Regulatory Affairs by telephone at (434) 832-3347, or by e-mail at Gayle. Elliott@framatome.com.
Sincerely,
?
Gary Peters, Director Licensing & Regulatory Affairs Framatome Inc.
cc: N.Otto Project 728 Attachments:
1 Attachment A-Notification of 10 CFR 21 Defect and Failure to Comply Framatome Inc.
3315 Old Forest Road Lynchburg, VA 24501 Tel: (434) 832-3000 www.framatome.co1n Document Control Desk NRC:22:012 July 18, 2018 Page A-1
Notice of 10 CFR 21 Defect and Failure to Comply
Subject:
Notification of 10 CFR 21 Defect and Failure to Comply
Name and Address of Individual Informing the Commission:
Gayle Elliott Deputy Director, Licensing & Regulatory Affairs Framatome Inc.
3315 Old Forest Road Lynchburg, Va. 24501
Title:
Relay - Failure to Change State
Identification of Basic Activity;
Eaton Electrical Cutler Hammer, Inc. D26MRD704A1 Relay
Basic Activity Supplied By:
Framatome Inc.
Nature of Defect and Failure to Comply:
Framatome Inc. (Framatome) supplied an Eaton Electrical Cutler Hammer, Inc. (Eaton)
D26MRD704A1 Relay to Duke Energy Carolinas, LLC, McGuire Nuclear Station, that failed to change state during testing of their load sequencer. This relay was supplied as a safety related component by Framatome. A molded contact bar in the D26 top adder deck prevented a contact spring from settling into its proper position. Top adder decks manufactured between 2003 and 2022 were inspected for the existence of flashing, but no specific time frame where the excess flashing was found could be identified.
Testing of additional relays with this similar excess flashing condition, by both Framatome and Eaton, showed that contact springs tended to stay in place and were unaffected by the excess flashing. There have been no past similar relay reports by Framatome customers despite there being at least 587 other relays with top adder decks supplied as commercially dedicated components. Eaton has also indicated that they have had no other reports of this condition or failures associated with it.
Framatome failed to comply with the requirements of 10 CFR 21 with regard to performing the defect evaluation for this condition within 60 calendar days. The nonconformance was determined to be a deviation on May 2, 2022 and the defect evaluation was completed on July 11,2022, exceeding the regulatory requirement by 10 days.
Document Control Desk NRC;22:012 July 18, 2018 Page A-2
Defect and Failure to Comply Determination Date:
This issue was determined to be a 10 CFR 21 Defect and Failure to Comply on July 11, 2022.
Number and Location of Basic Components:
The extent of condition determined that the failure is an isolated incident. Only one relay, supplied to McGuire Nuclear Station, failed to change state.
Corrective Actions to Date:
In the future, as a precaution, the Framatome commercial grade dedication process will include the inspection of the adder deck contact bars. Relays containing contact bars with excess flashing will be rejected.
The Failure to Comply was documented in Framatomes Corrective Action Program (Reference CR 2022-1742). Corrective actions will include additional training on the implementation and reporting of the 10 CFR 21 process.
Advice related to the Defect:
Framatome provided written correspondence to the customer, McGuire Nuclear Station, on July 11, 2022 to advise that this issue is a reportable defect. Framatome is responding to technical questions from McGuire as requested.