MONTHYEAR1CAN012101, Interim Report Concerning an Evaluation of Deviation2021-01-18018 January 2021 Interim Report Concerning an Evaluation of Deviation ML20296A2762020-10-0606 October 2020 Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21 - Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19008A0432019-01-0404 January 2019 Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 ML19029A1552018-12-27027 December 2018 10 CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0123, Rev. 1 ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18243A5112018-08-28028 August 2018 Curtiss-Wright Nuclear Division - Senasys Selector Switch P/N 910CMC-5240X, Part 21 Notification ML18159A0392018-06-0606 June 2018 National Technical Systems (Nts) - Potential Part 21 on Dedicated Items Not Available for Pmi Testing (NUPIC) ML18102A5292018-04-0303 April 2018 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0121, Rev. 0, Refurbished Pressure Regulator Assembly, P/N 1776 506. ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17355A1392017-12-0505 December 2017 Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Final Report Per 10 CFR Part 21 ML17286A0242017-10-11011 October 2017 Part 21 on Siemens 5-3AF-GER-350-1200-78 & 5-3AF-GEU-350-1200-78 Circuit Breakers ML17250A1572017-08-31031 August 2017 Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues ML17142A3232017-05-11011 May 2017 Interim Report Concerning Supply of Stainless Steel Tubing ML17114A0692017-04-19019 April 2017 Part 21 Report - Control Rod Drive Mechanisms Contaminated with Chlorides ML17101A3662017-04-0606 April 2017 Part 21 Notification - Failure of Vishay Diodes ML17096A2692017-04-0303 April 2017 Part 21 Notification - Failure of Vishay Diodes ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17075A2782017-02-28028 February 2017 Part 21 - Potential Transducer Component Defect ML16328A3102016-11-18018 November 2016 Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML16020A4772015-12-23023 December 2015 MPR Associates, Inc., - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 ML16004A0302015-12-23023 December 2015 MPR Associates, Inc. - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 ML15303A0142015-10-26026 October 2015 Part 21 Report Regarding Pressure Seal Valve Noncompliance, Per Millstone ML15224A5432015-08-10010 August 2015 Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance ML15223B2662015-08-0707 August 2015 Part 21 Report - Crane Nuclear Pressure Seal Valve with Retaining Rings ML15201A2872015-07-0808 July 2015 Crane Nuclear, Inc. - Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance ML15134A0172015-05-0101 May 2015 Part 21 Report Regarding Potential Test Induced Defect in a 0867F Main Steam Safety Relief Valves ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14079A0272014-03-13013 March 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13094A1772013-03-18018 March 2013 Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by Aaf ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13010A5182013-01-0909 January 2013 Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12088A1742012-03-27027 March 2012 ATC Nuclear Part 21 Report - Defective 48 Volt DC Safety Related Power Supplies ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML11273A0482011-09-28028 September 2011 10 C.F.R. Part 21 Notification of Potential Defect in Solid State Relay ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1112502392011-05-0202 May 2011 10 C.F.R. Part 21 Notification of Potential Defect, P/N 611130-T13-N SS5 Solid State Relay 2021-01-18
[Table view] |
Text
NTS June 6, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Potential Part 21 on Dedicated Items not available for PMI testing (NUPIC)
Pursuant to the requirements of 10 CFR Part 21, this letter notifies the NRC of a potential and indeterminate Part 21 condition. NUPIC Audit Report 24393, Finding 170310029-02 identified a weakness in NTS' material dedication of items based on visual comparison of items being dedicated to seismically qualified test specimens and not actual verification of material type.
Since the issue of the finding, NTS has performed positive material identification (PMI) testing of the seismically important components of the seismically qualified test specimens and a representative of each type of item dedicated during the last three years, with exception of a few items. NTS needs a representative of each of these few items to complete the testing and is requesting each affected customer to return one of each item on the attached list if possible for testing. For those utilities that provide a representative item, NTS will provide PMI test results.
NTS is notifying the affected customers of this potential Part 21 condition in parallel with this notification.
Note: Based on NTS' evaluation of the results to-date, the dedicated materials are equal to or better than the seismically qualified material.
Thank you for your consideration in this matter and if you have any questions, please contact NTS' Senior Director of Nuclear Engineering and Test Services, Tom Brewington at (256) 716-4512 or email at tom.brewington@nts.com .
Sincerely,
. - ~~ .JI.__. -~- --- ~-*--***- --- ----
C....:>
Megan Toomey Sr. Contracts Manager NTS Huntsville NTS Huntsville
- Huntsville, AL 35806 * (256) 837-4411
Items not available for testing (NUPIC)
Customer approved NO. ITEM CUSTOMER CUSTOMER PO# NTS PROJECT# Notes Ded Plan?
1 Fisher 3710-1 Pneumatic Valve Positioner Dominion - Millstone 4500366063 PR061801 Have test specimen; Need representative sample yes 03018277 PR046127 no 2 Sola/Hevi-Duty 23-23-210-8 Transformer Duke Energy - Robinson No test specimen; Need representative sample 03052327 PR066932 no Yokogawa 103122AXXX Panel Meter, Type DB- Have test specimen; Need representative sample; 3 Entergy - Arkansas Nuclear One 10480763 Rev 1 PR048591 yes 40 Obsolete, Yokogawa no longer manufactures yes and Yokogawa 180183HEAA8ABA Panel Meter Exelon - Oyster Creek 80071876 PR052431 Have test specimen; Need representative sample; results 4
Obsolete, Yokogawa no longer manufactures Yokogawa 180183HXAA8ABA Panel Meter Georgia Power - Hatch SNG10105647 Rev 1 PR036337 yes Action Instruments 4380-2001-D Signal 5 Exelon - Calvert Cliffs 00565752 PR043012 No test specimen; Need representat ive sample no Conditioner yes and 10467951 Rev 003 PR043492 Have test specimen; Need representative sample results Ametek SC-1302 VDl-Al-1-Nl-NR-FS Signal yes and 6 Entergy - Pilgrim 10490895 Rev 003 PR053343 Have test specimen; Need representative sample Converter results 10496592 Rev 002 yes and PR055646 Have test specimen; Need representative sample 10498845 Rev 003 results 7 Magnatrol B15-4H3 B-COK Level Sw itch Duke Energy - Brunswick 03026047 PR050517 Have test specimen; Need representative sample no Page 1 of 1