Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24023A280 | 23 January 2024 | Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump | |
ML23233A169 | 17 August 2023 | EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l | |
ML22098A117 | 29 March 2022 | Engine Systems, Inc. Report No. 10CFR21-0134, Rev. 0 - 10CFR21 Reporting of Defects and Non-Compliance - (Emo Cylinder Head with Fireface Thickness Below Specification Cylinder Head P/N 40121485) | |
ML22075A219 | 29 November 2021 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0133, Rev. 0 - Swing Check Valve, P/N ESl50359 | Breakaway torque Loctite |
JAFP-21-0029, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues | 29 April 2021 | Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues | Anchor Darling |
ML21096A114 | 6 April 2021 | Ametek Solidstate Controls - Updated Interim Notifcation | |
1CAN012101, Interim Report Concerning an Evaluation of Deviation | 18 January 2021 | Interim Report Concerning an Evaluation of Deviation | |
ML20279A577 | 23 November 2020 | U.S. Nuclear Regulatory Commission'S Analysis of Public Service Enterprise Group Nuclear, LLC Decommissioning Plans Update for Salem Generating Station, Hope Creek Generating Station and Peach Bottom Independent Sfsis | Decommissioning Funding Plan Authorized possession limits License Renewal |
ML20296A276 | 6 October 2020 | Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21 - Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | |
DCL-20-047, 10 CFR Part 21 Notification: Inadequate Dedication of Replacement Thermocouples | 16 June 2020 | 10 CFR Part 21 Notification: Inadequate Dedication of Replacement Thermocouples | |
ML20049A075 | 11 February 2020 | C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries | |
ML20021A045 | 3 January 2020 | Lake Engineering Co. - Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 | |
ML19346H873 | 12 December 2019 | Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 | |
ML19323C971 | 15 November 2019 | Interim 10 CFR 21 Report for Masoneilan Model 8005N Transducer | |
ML19325C094 | 7 November 2019 | Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch ZJS1518 Final Report Per 10 CFR Part 21 | |
ML19304B607 | 31 October 2019 | Written Defect Notification for GE-Hitachi Stationary Primary Contact Finger Q0114C5382P002 | |
ML19317D093 | 25 October 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing | |
ML19295D732 | 11 October 2019 | Engine Systems, Inc. Report No. 10CFR21-0125, Rev. 1 - Signal Converter Transmitter | Safe Shutdown Commercial Grade Dedication |
ML19263A666 | 9 September 2019 | Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 | |
ML19261A194 | 6 September 2019 | Final Report (Log # 2019-22-00) (Event# EN 54215) - Non-Destructive Examination (Liquid Penetrant) Performance of Components by an Un-Qualified Employee | Nondestructive Examination Liquid penetrant |
ML19246A102 | 22 August 2019 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No 10CFR21-0126, Rev 0 - Emd Fuel Injector - Cracked Spray Tip, Pin 5229250 | |
ML19213A025 | 26 July 2019 | Ultra Electronics - Update to ML19155A084 10CFR21 Interim Report | |
ML19207A056 | 19 July 2019 | Engine Systems, Inc. - Part 21 Report 10CFR21-0125, Rev. 0, for a 10CFR21 Reportable Notification on a Signal Converter Transmitter | Safe Shutdown Commercial Grade Dedication |
ML19210D434 | 11 July 2019 | Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 | |
ML19190A043 | 28 June 2019 | Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 | |
ML19158A130 | 31 May 2019 | Curtiss-Wright Nuclear Division - Notification Report for Potential Part 21 Update | |
ML19155A084 | 31 May 2019 | Ultra Electronics - Interim Notification Per 10CFR21 | |
ML19158A131 | 31 May 2019 | Paragon Energy Systems LLC -10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners | |
ML19106A106 | 12 April 2019 | Ametek Solidstate Controls - Notification of Potential Defect - 10 CFR Part 21 | |
ML19087A252 | 21 March 2019 | Engine Systems, Inc. - 10 CFR 21 Reportable Notification on Excitation Transformers for Vickers Voltage Regulator System | |
ML19080A059 | 8 March 2019 | Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors | |
ML19078A087 | 8 March 2019 | Curtiss-Wright - Interim Notification Report for Potential Part 21 Update | |
ML19008A043 | 4 January 2019 | Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 | |
ML19029A155 | 27 December 2018 | 10 CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0123, Rev. 1 | |
ML18353A428 | 30 November 2018 | Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps | |
ML18332A122 | 15 November 2018 | Curtiss-Wright - Interim Notification Report for Potential Part 21 Update | |
ML18302A228 | 19 October 2018 | Itt Enidine - USNRC 10CFR Part 21 Notification | |
ML18270A335 | 26 September 2018 | Interim 10 CFR 21 Report for General Electric Hitachi (GEH) Relay Contact Cartridge DJ148C6159P001 | |
ML18263A281 | 20 September 2018 | (Waterford 3) - Part 21 Report of Westinghouse 7300 Circuit Card Increased Failure Rate | Ultimate heat sink |
ML18243A511 | 28 August 2018 | Curtiss-Wright Nuclear Division - Senasys Selector Switch P/N 910CMC-5240X, Part 21 Notification | |
ML18211A302 | 25 July 2018 | Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11 KLVS146 | |
ML18159A039 | 6 June 2018 | National Technical Systems (Nts) - Potential Part 21 on Dedicated Items Not Available for Pmi Testing (NUPIC) | |
ML18150A689 | 30 May 2018 | Interim Report of a Deviation or Failure to Comply | |
ML18102A529 | 3 April 2018 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0121, Rev. 0, Refurbished Pressure Regulator Assembly, P/N 1776 506. | Safe Shutdown |
ML18075A355 | 6 March 2018 | 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve | |
ML17355A139 | 5 December 2017 | Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Final Report Per 10 CFR Part 21 | |
ML17340A392 | 28 November 2017 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 | Safe Shutdown |
ML17325B022 | 17 November 2017 | Fisher Controls International LLC Information Notice (FIN) 2017-05 | |
ULNRC-06393, 10 CFR Part 21 Written Notification Regarding Cameron Barton Model 752B Differential Pressure Transmitters | 31 October 2017 | 10 CFR Part 21 Written Notification Regarding Cameron Barton Model 752B Differential Pressure Transmitters | |
ML17286A024 | 11 October 2017 | Part 21 on Siemens 5-3AF-GER-350-1200-78 & 5-3AF-GEU-350-1200-78 Circuit Breakers |