Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24018A01118 January 2024CFR 21 Report Emergency Diesel Generator Fuel Oil Piping
ML24018A01417 January 2024Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913
ML24010A21310 January 2024CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers
ML24018A0954 January 2024Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0
ML24008A0694 January 2024Part 21 Report No. 10CFR21-0137, Rev. 0 for Reportable Notification for an Emo Cylinder Liner with Bore Deficiency, P/N 9318833 (Component of Power Assembly P/N 40124897), S/N 20M0938
ML24002A71128 December 2023Interim Part 21 Report of a Deviation or Failure to Comply - Lube Oil Scavenging and Fuel Oil Engine Driven Pump
NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers15 December 202330-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers
ML23348A39414 December 2023Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve
ML24004A20912 December 2023Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code
ML23352A2388 December 202356882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow
ML23335A0721 December 2023Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump
ML23320A25416 November 2023Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump
ML23282A0026 October 2023Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump
ML23279A0615 October 2023Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs)Commercial Grade Dedication
ML23254A0246 September 2023Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs)
NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays6 September 202310 CFR Part 21 Report Regarding HGA Relays
ML23241A00225 August 2023Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils
RBG-48245, Part 21 Notification of a Failure to Comply Identified During Preinstallation Testing on a Motor Driven Relay24 August 2023Part 21 Notification of a Failure to Comply Identified During Preinstallation Testing on a Motor Driven Relay
ML23221A3703 August 2023Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0
ML23207A07614 July 2023EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06
ML23187A47230 June 202356603-EN 56603 - Engine Systems, Inc., Report No. 10CFR21-0136, Rev. 0 Re Voltage Regulator Chassis
ML23192A06230 June 2023Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0
ML23212A95024 May 2023Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material
ML23117A04320 April 2023Framatome, Inc., Part 21 Notification of Existence of a Defect
ML23100A10710 April 2023Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker
ML23094A12531 March 2023Talen Part 21 Final Notification P21-03032023-FN R0 Re Defect Identified in Automatic Transfer Switch
ML23094A12431 March 2023EN 56387 Update - Paragon Energy Solutions Final Notification of Defect of Automatic Transfer Switch
ML23087A12923 March 2023Trillium Valves USA - Part 21 Written Notification - Event Number: 56420
ML23082A11217 March 202310 CFR Part 21 Report Inconsistent Crimping of Motor Leads to Ring Terminal Connectors and Failure to Comply. Trillium Valves USA Part 21 Evaluation I211003
ML23066A2217 March 2023Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose
ML23065A2003 March 2023EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors
ML23065A1962 March 2023EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1
ML23060A0411 March 2023Part 21 Interim Report of a Deviation or Failure to Comply Associated with a Limitorque Actuator
ML23038A0196 February 2023Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays
ML23030A66427 January 2023Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors
ML23025A25325 January 2023Part 21 Final Report Regarding Siemens Medium Voltage Circuit Breakers
ML23024A02924 January 2023Part 21 Interim Report of a Deviation or Failure to Comply Associated with a Limitorque Actuator
ML23011A06211 January 2023Written Part 21 Notification of a Defect Associated with Imi CCI Supplied Main Steam and Main Feedwater Isolation Valves
ML22342B1402 December 202256252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors
ML22341A03230 November 202210 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays
ML22314A0134 November 2022EN 56209 - Part 21 Report Re Schneider Electric P/N ASP840-000 Modicon Primary/Secondary Power Supply Failures
ML22307A0603 November 2022EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect
ML22307A0191 November 2022EN 56196 - NRC 10 CFR Part 21 Notification, Nutherm, Written Notification of Potential Defect Found in Nutherm/Sola Hevi-Duty Uninterruptible Power Supply (Ups), S4K2U1000-NM 191Reverse polarity
ML22301A17428 October 2022Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt)
ML22303A00431 August 2022Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Supply of 6 NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company Pvt. Ltd.; Heat No: N200309AW01, SR No: 7; 9 Pcs; 180 Feet Total Procured as Unquali
ML22259A17326 August 2022EN 55960 - Curtiss Wright Part 21 Report Re Potential Defect in Configuration of the Quick Disconnect Connector Cable Assemblies Supplied to McGuire and Catawba Nuclear Power Stations
ML22220A2362 August 2022Leonardo DRS, 16-AAT907B Power Supply 10 CFR Part 21 Notification
ML22201A10118 July 2022Framatome, Inc. - 10 CFR Part 21 Notification of Existence of a Defect and Failure to ComplyCommercial Grade Dedication
ML22222A0091 July 2022EN 55974 - Flowserve, Part 21 Report Re Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for Use on FWIV ActuatorCommercial Grade
Loctite