MONTHYEARML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24053A3932024-02-22022 February 2024 Final Report of a Deviation or Failure to Comply - Crompton Instruments Type 077 Ammeter ML23124A0182023-05-0404 May 2023 Retraction of Interim Report of a Deviation or Failure to Comply Associated with a Limitorque Actuator ML20296A2762020-10-0606 October 2020 Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21 - Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML20021A0452020-01-0303 January 2020 Lake Engineering Co. - Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 ML19213A0252019-07-26026 July 2019 Ultra Electronics - Update to ML19155A084 10CFR21 Interim Report ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19155A0842019-05-31031 May 2019 Ultra Electronics - Interim Notification Per 10CFR21 ML19106A1062019-04-12012 April 2019 Ametek Solidstate Controls - Notification of Potential Defect - 10 CFR Part 21 ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML15223B2682015-08-0707 August 2015 Part 21 - Damaged Surveillance Capsules ML14125A2702014-05-0202 May 2014 Missing Jam Nuts on Size 4, Pressure Class 600 Normally Open, In-Line Check Valve Per Flowserve Drawing No. 07-45546-01 ML13246A0872013-08-23023 August 2013 Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML1015305642010-05-28028 May 2010 Part 21 Notification from C & D Technologies, Inc., Post Corrosion on Dcu Batteries ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs 2024-08-23
[Table view] |
Text
{{#Wiki_filter:Update to ML19155A084 10CFR21 Interim Report Ultra Electronics 26 July 2019 . Energy 707 Jeffrey Way PO Box300 .
- United States Nuclear Regulatory Commission Round Rock, TX 78680-0300 ATIN:.Document Control Desk Tel +1 512 434 2800 Fax +1. 512 434 2801
- Washington, DC 20555-0001
Dear Sir or Madam:
We have previously communicated an interim 10CFR21 report NRC reference ML19155A084, Which we now wish to update as a result of the investigatory work performed:
- There have been two fruitful discussions with the NRC on the regulatory and technical implications of this investigation and we would like to thank the NRC staff concerned for.their assistance.
*
- We have examined the original qualification experiments and the activation energy values used to ensure they provide valid inputs to the mathematical models. '
- We have refined the mathematical models used to determine qualified service lives from accelerated thermal ageing data for the Foxboro Weed N-Ell & N-E13 Series transmitters, and other devices within the extent of the condition, to better reflect the impact of cornpone_nt self-
- heating.
~
- The impact on qualified service life of the revised mathematical models is modest for typical plant conditions, and we do not therefore believe that it poses a significant risk to nuclear safety.
We will shortly be contacting the licensees operating devices within the extent of the condition in order to provide them with a packaged* software tool that will allow them to determine the impact of this issue for their spe~ific plant conditions.
We have revised the completion date for the inve~tigation from 3rd August 2019 to 1ih September 2019 because of the complex nature of the investigation and we are confident of closure by this revised date.
Best Regards Gary. M. Hawkins Vice President Engineering