Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Supply of 6 NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company Pvt. Ltd.; Heat No: N200309AW01, SR No: 7; 9 Pcs; 180 Feet Total Procured as Unquali
ML22303A004
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/31/2022
From: Kotcher W
Tioga Pipe
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LTR-TP-21-24
Download: ML22303A004 (23)


Text

r* LTR-TP-21-24 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555-0001 Phone: (301) 816-5100 Fax: (301) 816-5151 E-Mail: EIE@nrc.gov When it has to be right.

August 31, 2021

SUBJECT:

Final Report Notification Pursuant To 10 CFR Part 21.21, Regarding Supply Of 6" NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company PVT. LTD.; Heat No: N200309AW01, SR No: 7; 9 pcs; 180 feet total procured as unqualified source material for ASME Section III, Subsection NC Class 2 2007 Edition, 2008 Addenda This letter provides a final report in accordance with §21.21 concerning the supply of 6" NPS Sch. 40 Seamless Stainless-Steel Pipe to the Duke/ Progress Energy Catawba Nuclear and McGuire Nuclear Stations.

Mackson Nuclear, LLC subcontracted Tioga Pipe, Inc. (Tioga Pipe) to supply the pipe.

Tioga Pipe performed utilization of unqualified source material in accordance with ASME NCA-4255.5 on Maxim Tubes Company PVT. LTD. material from Tioga's commercial inventory. While the unqualified source material passed all required tests and examinations in accordance with the requirements of ASME NCA-4255.5, the material was identified with multiple linear indications located on the inside diameter of the pipe.

Further evaluation by Tioga Pipe found these indications to be lap-like and thus, rejectable in accordance with ASME SA999 paragraph 28.12. Please see Attachment 1, "Final Report Notification Information per §21.21", for additional details and clarification.

All material supplied from the same heat and lot number from Maxim Tubes Company PVT. LTD. has been identified by Duke, found not be installed, and returned to Tioga Pipe. At this time, all of the defective material is in Tioga's possession and there is no risk of this defective material being installed into a nuclear facility.

If you have any questions, please feel free to contact me at (713) 512-3569 or our Quality Director, Bryan Nichols, at (484) 546-5613.

William Kotcher President Tioga Pipe Inc.

Page 1 of 5 File Location: \\\\FILESVR.1\\Public\\FORKS\\OA\\Letters and Correspondences

ga When it has to be right.

f LTR-TP-21-24

Enclosures:

1) Attachment 1, Final Report Notification Information per §21.21
2) Duke Energy Part 21 Letter to Mackson July 2021
3) Laboratory Testing Inc. Certified Test Report, TPS00l-21-08-24454-1 Cc:

Andrew Keiser, Tioga David Keiser, Tioga Bryan Nichols, Tioga Richard Crowley, Tioga Glenn Reigel, Tioga Shannon Echols, Mackson Page 2 of 5 File Location: \\\\FILESVR1\\Public\\FORKS\\OA\\Letters and Correspondences

When it has to be right.

(" LTR-TP-21-24 Final Report Notification Information per §21.21 I.

Name and address of the individual or individuals informing the Commission:

William Kotcher President Tioga Pipe Inc.

14950 Heathrow Forest Parkway, Suite 390 Houston, TX 77032 II.

Identification of the facility, the activity, or the basic component supplied for such facility which fails to comply or contains a defect.

6" NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company PVT. LTD.; Heat No: N200309AW01, SR No: 7; 9 pcs; 180 feet total procured as unqualified source material for ASME Section III, Subsection NC Class 2 2007 Edition, 2008 Addenda.

100 feet delivered to the Catawba Nuclear Station on PO 00154619 00971 and 80 feet delivered to the McGuire Nuclear Station on PO 00154619 00978 and 00154619 01012.

Tioga Sales Orders: SO 354874 Position 20, SO 355032 Position 20, and SO 358008 Position 10.

III.

Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.

Tioga Pipe, Inc.

IV.

Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.

Tioga Pipe Inc. purchased unqualified source material from Maxim Tubes Company PVT. LTD. The unqualified source material passed all required tests and examinations in accordance with the requirements of ASME NCA-4255.5 however the material was identified with multiple linear indications located on the inside diameter of the pipe. The indications were discovered by Duke Energy during their pre-fabrication inspection at the Catawba Nuclear Station. The indications ranged from 1/4" to well over an inch in length. This material along with the material with the same heat number at McGuire Nuclear Station was returned to Tioga Pipe for further evaluation. The evaluation found these indications to be lap-like and thus, rejectable in accordance with ASME SA999 paragraph 28.12.

Page 3 of 5 File Location: ~VRl\\Public\\FORKS\\OA\\Letters and Correspondences

When it has to be right.

f LTR-TP-21-24 V.

The date on which the information of such defect or failure to comply was obtained.

Duke Energy notified Mackson Nuclear and Tioga Pipe, inc. of the linear indications on July 21, 2021. At that time, it could not be determined if the linear indications were rejectable in accordance with ASME SA312 and SA999.

The material was returned to Tioga for further evaluation on 7/30/2021.

A sample of the material containing the linear indications shipped to Tioga's approved supplier of destructive testing, Laboratory Testing, Inc. (LTI) on 8/17/2021 for microstructure examination.

The microstructure examination was completed on 8/20/2021.

Tioga received the LTI test report, TPS00l-21-08-24454-1 determining the material to contain defects on 8/30/2021.

VI.

In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.

(9 pcs) 20 ft long pieces = 180 total linear feet supplied with 100 feet delivered to Catawba Nuclear Station on PO 00154619 00971 and 80 feet delivered to the McGuire Nuclear Station on PO 00154619 00978 and 00154619 01012. All 180 feet have been returned to Tioga Pipe, Inc.

VII.

The corrective action, which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.

Tioga Pipe Corrective Action, N-CAR-21-08 has been generated and Bryan Nichols, Quality Director is responsible for completing and closing this corrective action.

Completed Actions:

1. Extent of condition: The extent of condition is limited to above identified 180 feet and the additional 151 feet in Tioga's commercial inventory.
2. Tioga has replaced the 180 feet supplied to Duke with different material supplied by different mills (120 feet of Salzgitter Mannesmann, Heat No.

350470, Lot No. QL30151841 and 60 feet of Walsin, Heat No. 112037, Lot No. 202010-TG-B30 and 202010-TG-E07).

3. The 180 feet of pipe returned to Tioga has been quarantined and tagged as nonconforming material.
4. Tioga shall not use any material supplied from Maxim Tubes Company PVT. LTD. for nuclear orders until Tioga has been provided with a sufficient corrective action response from Maxim Tubes Company PVT.

LTD.

Page 4 of 5 File Location: \\\\FlLESVRl\\Public\\FORKS\\QA\\Letters and Correspondences

When it has to be right.

/

LTR-TP-21-24 Open Actions:

5. Prepare and Issue Final Report to NRC - due August 31, 2021.
6. Tioga shall quarantine and tag as nonconforming material the remaining 151 feet in Tioga's commercial inventory - due September 10, 2021.
7. Issue a supplier corrective action to Maxim Tubes Company PVT. LTD. to have them investigate the cause and provide corrective actions for the laps identified on the inside diameter of the above pipes - due September 10, 2021.

VIII.

Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

Not applicable. All material from this heat number has already been returned to Tioga Pipe. The returned material has been quarantined and tagged as nonconforming material.

IX.

In the case of an early site permit, the entities to whom an early site permit was transferred.

Not applicable.

Page 5 of 5 File Location: \\\\FILESVRl \\Publlc\\FORKS\\QA\\letters and Correspondences

( -, DUKE ENERGY.

July 21, 2021 Mackson Attention:

Shannon Echols, Quality Assurance Manager sechols@mackson.biz

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

Catawba Nuclear Station, Units 1 and 2 Catawba Nuclear Slation Duke Energy CN01VP 14800 Concord Road York, SC 29745 10 CFR 21 Request for Mackson Determination of 10 CFR 21 Reportability Catawba Nuclear Condition Report (NCR) 02388864 Catawba Nuclear Station PO 00154619 Rel 00971 RE:

Linear Indications identified on 6" SS ASME SA312, Schedule 40, Piping The purpose of this letter is to formally notify Mackson of a discovery by Duke Energy concerning the above described piping. Material received on PO 00154619 Rel 00971, and issued under Duke Energy CAT ID 149543, was discovered to have linear indications on the ID of the piping during pre-inspection activities at Duke Energy. Catawba Nuclear Station.

The basic component was delivered for use at CNS and issued to craft for pre-fabrication activities. The material was intended to be used in the Duke Class C LD System (ASME Class 3), which is QA Condition 1, Safety Related. The piping was purchased under CATID 149543, which is [PIPE, 6", SS, ASME SA312, TP304, PLAIN ENDS, SEAMLESS OR WELDED, SCH 40, ANSI B36.10, 1001C1AF1D08060, B, ASME SECTION Ill SUBSECTION NC]. The material was identified with multiple linear indications and is associated with Heat

  1. N200309AW01 (Duke Energy UTC 30197705). The indications range from 1/4: to well over an inch.

Similar indications were not identified on other material from CATID 149543, with a different Heat #, that was also issued for the same project. It should also be noted that piping from the same heat number (N200309NW01) was also supplied to McGuire Nuclear Station on Duke Energy PO 00154619 Rel 009967 & Rel 00978.

This part was procured QA Condition 1 and provided to Duke Energy under the 1 O CFR 50 Appendix B quality assurance program. It is possible that 1 O CFR 21 may require Mackson, as the supplier, to make a report to the NRC. Therefore, Duke Energy requests Mackson review this issue against the reporting criteria of 10 CFR 21 and take appropriate action to assure that Mackson complies with 10 CFR 21 with respect to this issue. Duke Energy requests Mackson provide documentation of its conclusions relative to 1 O CFR 21 reportability for our records within 45-60 days of receipt of this letter.

Letter from Duke Energy to Mackson Page2 Please direct any questions to Sherry Andrews, Catawba Regulatory Affairs, at (803) 701-3424.

s;;JJ.~

Mandy B. Hare Nuclear Support Services Manager Catawba Nuclear Station bxc:

M.B. Hare S.E. Andrews A. Linker J. Stewart C. Jenkins R. Bowman S. Steele RGC Date File

(1 1~r11111

~~~

7~ !!/6~

(!!!!tf!ffcap*

u ~:::=~~~~-y 2331 Topaz Drive, Hatfield, PA 19440 TEL: 800*219-9095

  • FAX: 800-219-9096 SOLD TO Tioga Pipe Supply Co., Inc.

2450 Wheatsheaf Lane Philadelphia, PA 19137 CUSTOMER P.O.

713869 Quantity:

9 TPS001-21-08-24454-1 SHIP TO Tioga Pipe Supply Co., Inc.

100 Mort Drive Easton, PA 18040 ATTN: Bryan Nichols CERTIFICATION DATE 8/20/2021 DESCRIPTION Material:

ASME SA312 Grade TP304/TP304L Size:

6" NPS Sch. 40

==

Description:==

Seamless Stainless Steel Pipe Heat No.:

N200309AW01 Shop Order #:

35487 4 I 10 O.A. No.:

12164/7 S/N:

1, 2, 3 ACCREDITED Materials Testing Laboratoriea NonDeslrudive Testing SHIP VIA L Tl DELIVERY Code Year:

ASME Section Ill Subsection NC Class 2 2007 Edition 2008 Addenda; ASME Section II 2007 Edition 2008 Code Year:

Addenda MICROSTRUCTURE EXAMINATION APPLICABLE SPECIFICATIONS: Customer's Instructions ETCHANT: As Polished/ 10% Oxalic, Electrolytic MAGNIFICATION: 10X - SOX KEY: C - Conform NC - Non-conformance R

  • Report for Information SIN, ID#

1 -1 1 - 2 1

  • 3 1 -4 MICROSTRUCTURE A lap-like indication measuring 0.0179" in depth was observed on the ID surface.

A lap-like indication measuring 0.0251" in depth was observed on the ID surface.

A lap-like indication measuring 0.01 19" in depth was observed on the ID surface.

A lap-like indication measuring 0.0247" in depth was observed on the ID surface.

Date Completed: 8/20/2021 Procedures/Methods: 90-MICRO-1, Rev. 8, Microexamination of Metals MICROSTRUCTURE EXAMINATION APPLICABLE SPECIFICATIONS: Customer's Instructions ETCHANT: As Polished/ 10% Oxalic, Electrolytic MAGNIFICATION: 100X KEY: C - Conform NC - Non-conformance R - Report for Information FIGURE 1-2 3-4 5-6 7-8 SIN, ID #

MICROSTRUCTURE FIGURE 2

  • 1 A lap-like indication measuring 0.0097" in depth was observed on the ID surface.

9 - 10 Date Completed: 8/20/2021 Procedures/Methods: 90-MICRO-1, Rev. 8, Microexamination of Metals Page 1 of 16 KEY (C/NC/R)

R R

R R

KEY fC/NC/R)

R

(!J_

,/,/1//

  1. $LJ ::::::::~~:.y

~4'd~§6~

@.~';!f!cap*

TPS001-21-08-24454-1 2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 HEAT NO. N200309AW01 / SHOP ORDER NO. 354874 / 10 MICROSTRUCTURE EXAMINATION APPLICABLE SPECIFICATIONS: Customer's Instructions ETCHANT: As Polished / 10% Oxalic, Electrolytic MAGNIFICATION:10X - 100X KEY: C - Conform NC - Non-conformance R - Report for Information MICROSTRUCTURE ACCREDITED Material* Teeling Laboratorie*

NonDeetruclive Teeting SIN, ID#

3-1 3-2 A lap-like indication measuring 0.0102" in depth was observed on the ID surface.

A lap-like indication measuring 0.0265" in depth was observed on the ID surface.

FIGURE 11 -12 13-14 Date Completed: 8/20/2021 Procedures/Methods: 90-MICR0-1, Rev. 8, Microexamination of Metals No weld repairs were performed on the referenced items.

The provisions of 1 OCFR21, 1 OCFRSO, Appendix B and ASME Section 111, NCA-3800 apply to this order.

KEY (C/NC/R)

R R

The services performed above were done in accordance with L Tl's Quality System Program Manual Revision 21 dated 5/1 /2019 and ISO/IEC 17025:2017. These results relate only to the items tested and this report shall not be reproduced, except in full, without the written approval of Laboratory Testing, Inc. The services provided on this certificate have been performed in conformance with the customer's purchase order requirements. LT.I. is accredited by Nadcap for NOT and Materials Testing for the test methods and specific services as listed in the Scopes of Accreditation available at www.labtesting.com and www.eAudltNet.com. The results reported on this test report represent the actual attributes of the material tested and indicate full compliance with all applicable specification and contract requirements. This is a shared risk decision rule which the customer also has responsibility for determining acceptance of the results.

MERCURY CONTAMINATION: During the testing and inspection, the product did not come in direct contact with mercury or any of its compounds nor with any mercury containing devices employing a single boundary of containment.

NOTE: The recording of false, fictitious or fraudulent statements or entries on this document may be punishable as a felony under Federal Statutes.

Page 2 of 16 Sherri L. Scheifele QA Specialist Authorized Signature

W~d ~--"' 9B~

2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 21-24454 Microstructure SIN : 1, ID: 1 ID Surface Orig. Mag. 10X As-Polished TPS001-21-08-24454-1 PHOTOGRAPHIC SUBMITTAL FIGURE 1 Page 3 of 16 ACCREDITED Material* Te*ting Loboratorie*

NonDeotr11clive Te*ling 0.050 Inch

I 11111111 L!JU ::::::~~£~.y

~A~~~

TPS001-21-08-24454-1 2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 PHOTOGRAPHIC SUBMITTAL FIGURE 2 Page 4 of 16

@.tf':!rJcap*

ACCREDITED Materials Testing Laboratorieo NonDeslruc:tive TO'lting

(!J_

W,l!I/J

!l{J ::::::::~~:.y W~d~~¥l~

TPS001-21-08-24454-1 2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 21-24454 Microstructure SIN: 1, ID: 2 ID Surface Orig. Mag. 10X As.Polished PHOTOGRAPHIC SU BM ITT AL FIGURE 3 Page5of16

~~IJ!':!.flcap*

ACCREDITED Material* Teoting Laboratorie, NonDestructive Tegting 0.050 inch

(!)_

1/j~WI I

LABORATORY TESTING INC.

W~~d s7&M ~~

TPS001-21-08-24454-1 2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 PHOTOGRAPHIC SUBMITTAL FIGURE 4 Page 6 of 16

@.J:{,~((lcap*

ACCREDITED Material* Testing laboratorie, NonDHtructive Te11ting

Wen'~~.!n~

2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 1-24454 icrostructure IN: 1, 10: 3 Surface ri~. Mag. 50

-Pollshed TPS001-21-08-24454-1 PHOTOGRAPHIC SUBMITTAL FIGURE 5 Page7of16

@Jl!t':!flcap-Acc R Eo1 TE0 Material, Te*ting Laboratorie*

NonOegtructi'le Tt9ting 0.010 inch

(l i,1111/

WU :::::::~~:.y w~µ.rcM ~

TPS001-21-08-24454-1 2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 PHOTOGRAPHIC SUBMITTAL FIGURE 6 Page 8 of 16

@ ~'!mflcap*

ACCREDITED Material* Testing Laboratorie, NonDestruclive Teoting

W~

ffeM !76~~

2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 1-24454 icrostructure

/N: 1, I JD Surfa Orig. Ma.

~-Poli.shed TPS001-21-08-24454-1 PHOTOGRAPHIC SUBMITTAL FIGURE 7 Page 9 of 16

([!!.'J!t;!f:lcap*

ACCREDITED Materials Testing Laboratori e*

NonD~structi'I~ T-?9tlng 0.010 inch

~~

~

gg~

TPS001-21-08-24454-1 2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 PHOTOGRAPHIC SUBMITTAL FIGURE 8 Page 10 of 16

@!!!eflcap*

ACCREDITED Material* Te,ting Laboratoriea NonDeotruclive Tes~ng

W61"~.d' ~

n~~

2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 21-2"454 Mlcrostructure SIN: 2, ID: 1 ID Surface Orig. Mag. 100X As-Pollshed TPS00 1-21-08-24454-1 PHOTOGRAPHIC SUBMITTAL FIGURE 9 Page 11 of 16

@,~';!flcap-Acc RE o1 TE o Material* Teoting Laboratorie, NonDeotructive Teoting 0.005 inch

W~p.,a' Yt?M ~~

TPS001-21-08-24454-1 2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 PHOTOGRAPHIC SUBMITTAL FIGURE 10 Page 12 of 16

(!J:.ti';!f:ICap ACCREDITED Material* Teoting Laboratorie, NonOg.gtructive Testing

W~d~gg~

2331 Topaz Drive, Hatfield, PA 19440 TEL: 800*219*9095

  • FAX: 800-219-9096 21-24454 M icro1 true tu re SIN: 3, ID: 1 ID Surface Orig. Mag. 100X As-Pollshed TPS001-21-08-24454-1 PHOTOGRAPHIC SUBMITTAL FIGURE 11 Page 13 of 16

~ t:!.'!!rJcap*

ACCREDITED Materials Teoting Laboratorie*

NonDeatructive. Tegting 0.005 inch

~4.ea~~

TPS001-21-08-24454-1 2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 PHOTOGRAPHIC SUBMITTAL FIGURE 12 Page 14 of 16 t'E!~':!flcap-A cc RE o IT E o Materials Teating Laboratorie*

Nc-.nD~stmctiv~ T"gtmg

~~~a' ffed 9&,~

2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 21-24454 Microstructure SIN: 3, ID: 2 ID Surface Orig. Mag. 10X As-Polished TPS001-21-08-24454-1 PHOTOGRAPHIC SUBMITTAL FIGURE 13 Page 15 of 16

@!!!'!!ficap -

ACCREDITED Material* Tegting Laboratorie, NonD~etfuctiv~ Testing 0.050 inch

~u<~

~eM~~

2331 Topaz Drive, Hatfield, PA 19440 TEL: 800-219-9095

  • FAX: 800-219-9096 Orig. M 10% Oxalic, TPS001-21-08-24454-1 PHOTOGRAPHIC SUBMITTAL FIGURE 14 Page 16 of 16 i:t'fJ!:J!{';!flCap*

ACCREDITED M:stc11;-1b fc:9tir1 ~1 L.1b01~t o1*ic9:

Nl'..)n0~1~1Uudi1J,:, T:?- gtlng