Letter Sequence Request |
---|
EPID:L-2019-LLR-0063, Revision to Relief Requests Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor Pressure Vessel Internals and Components Inspection (Open) |
|
|
|
---|
Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML22098A1172022-03-29029 March 2022 Engine Systems, Inc. Report No. 10CFR21-0134, Rev. 0 - 10CFR21 Reporting of Defects and Non-Compliance - (Emo Cylinder Head with Fireface Thickness Below Specification Cylinder Head P/N 40121485) ML21096A1142021-04-0606 April 2021 Ametek Solidstate Controls - Updated Interim Notifcation ML20296A2762020-10-0606 October 2020 Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21 - Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML20021A0452020-01-0303 January 2020 Lake Engineering Co. - Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 ML19325C0942019-11-0707 November 2019 Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch ZJS1518 Final Report Per 10 CFR Part 21 ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19295D7322019-10-11011 October 2019 Engine Systems, Inc. Report No. 10CFR21-0125, Rev. 1 - Signal Converter Transmitter ML19263A6662019-09-0909 September 2019 Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 ML19213A0252019-07-26026 July 2019 Ultra Electronics - Update to ML19155A084 10CFR21 Interim Report ML19207A0562019-07-19019 July 2019 Engine Systems, Inc. - Part 21 Report 10CFR21-0125, Rev. 0, for a 10CFR21 Reportable Notification on a Signal Converter Transmitter ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19158A1312019-05-31031 May 2019 Paragon Energy Systems LLC -10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML19155A0842019-05-31031 May 2019 Ultra Electronics - Interim Notification Per 10CFR21 ML19106A1062019-04-12012 April 2019 Ametek Solidstate Controls - Notification of Potential Defect - 10 CFR Part 21 ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19008A0432019-01-0404 January 2019 Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 ML19029A1552018-12-27027 December 2018 10 CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0123, Rev. 1 ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18159A0392018-06-0606 June 2018 National Technical Systems (Nts) - Potential Part 21 on Dedicated Items Not Available for Pmi Testing (NUPIC) ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17223A2002017-08-0909 August 2017 10 CFR Written Notification for Hex Head Cap Screws Nova Machine Products Part Numbers: BPRT.008227.30, BPRT.008468.30, and BPRT.008342.30 ML17114A0692017-04-19019 April 2017 Part 21 Report - Control Rod Drive Mechanisms Contaminated with Chlorides ML17104A2882017-04-13013 April 2017 Emerson Process Management, LLC - Fisher Information Notice, (FIN) 2017-02 ML17114A0712017-04-13013 April 2017 10 CFR Part 21 Notification of Deviation - Gkt Relay ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16020A4772015-12-23023 December 2015 MPR Associates, Inc., - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 ML16004A0302015-12-23023 December 2015 MPR Associates, Inc. - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 ML15223B2662015-08-0707 August 2015 Part 21 Report - Crane Nuclear Pressure Seal Valve with Retaining Rings ML15223B2682015-08-0707 August 2015 Part 21 - Damaged Surveillance Capsules ML15217A3092015-08-0101 August 2015 Notification of Part 21 - Report Involving Limit Switches EA180 and EA170 Manufactured in a Specific Date Range ML15201A2872015-07-0808 July 2015 Crane Nuclear, Inc. - Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance ML15134A0172015-05-0101 May 2015 Part 21 Report Regarding Potential Test Induced Defect in a 0867F Main Steam Safety Relief Valves ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14125A2702014-05-0202 May 2014 Missing Jam Nuts on Size 4, Pressure Class 600 Normally Open, In-Line Check Valve Per Flowserve Drawing No. 07-45546-01 W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation2014-04-11011 April 2014 Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation ML14105A0182014-04-11011 April 2014 Part 21 - Model 1154HP Transmitters with Integral 1159 Remote Diaphragm Seals May Exhibit Degraded Functional Reliability ML14069A4672014-02-26026 February 2014 Part 21 Report Involving a Potential Manufacturing Defect in Replacement Masterpact Cradles ML14042A2002014-01-21021 January 2014 Part 21 Report Regarding Non-Conformance of an Electrical Tubular Water Heater ML13246A0872013-08-23023 August 2013 Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification IR 05000391/20130032013-08-21021 August 2013 Construction Deficiency Report 50-391/2013-03 - Failure to Implement Plant Changes - Final Report ML13240A0062013-08-21021 August 2013 Construction Deficiency Report 50-391/2013-03 - Failure to Implement Plant Changes - Final Report ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13094A1772013-03-18018 March 2013 Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by Aaf ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13010A5182013-01-0909 January 2013 Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System 2022-03-29
[Table view] Category:E-Mail
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23363A0302023-12-29029 December 2023 NRR E-mail Capture - Preliminary RAIs for Clinton Partial Site Release ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23339A0892023-12-0505 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of CLIIP LAR to Adopt TSTF-374 ML23338A0402023-12-0404 December 2023 NRR E-mail Capture - Ready for Clean TS Pages and Updated Review Hours for Clinton Power Station, Unit 1, Request for License Amendment to Revise Technical Specifications Section 3.8.3 ML23335A0122023-12-0101 December 2023 FNP - IP95001 Inspection Notification and Request for Information (Email to Farley) ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23318A5252023-11-0909 November 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Audit Agenda and Questions ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23271A1542023-09-28028 September 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23261A0032023-09-15015 September 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton Amendment Request to Revise Timing of Reactor Water Cleanup Isolation Valves ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch 'Revise TS Table 1.1-1 (Modes)' LAR (L-2022-LLA-0120) ML23243A9952023-08-31031 August 2023 Request for Baseline RP Inspection ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23236A0022023-08-22022 August 2023 NRR E-mail Capture - Request for Additional Information - Farley, Units 1&2, Emergency TS 3.6.5 LAR ML23230B1682023-08-18018 August 2023 NRR E-mail Capture - Clinton Power Station, Unit 1, Preliminary Requests for Additional Information (Rais) Related to the Amendment Request to Revise Diesel Generator Starting Air Technical Specifications ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23219A2142023-08-0404 August 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton Request for Partial Site Release ML23208A3072023-07-27027 July 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Requests Regarding I6-RR-1, I6-RR-2, and I6-RR-3 (EPIDs L-2023-LLR-0030, L-2023-LLR-0031, L-2023-LLR-0032) ML23207A1742023-07-26026 July 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RC3-02 Drywell Head Bolting ISI ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23194A1102023-07-13013 July 2023 NRR E-mail Capture - Non-acceptance of Clinton Request for Partial Site Release ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23177A1992023-06-26026 June 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies 2024-01-09
[Table view] |
Text
Pannier, Stephen From: lantorno, Randy F <riantorno@curtisswright.com>
Sent: Friday, June 28, 2019 3:34 PM To: Pannier, Stephen Cc: Elliott, Robert
Subject:
[External_Sender] RE: Proprietary Information in your 10 CFR Part 21 Reporting of Defects for lntrol Positioner 890265-010 - CW SAS Initial Report [EXTERNAL]
Good'Afternoon Stephen, Curtiss-Wright legal does not consider CW SAS Initial Report No. 10CFR21-48 proprietary. Also, my CW SAS emails contain a MS Outlook email footer which is automatic and does not apply to this submission. The NRC is granted permission to post this document.
Please call or email me anytime if you need more information.
Thanks in advance and have a great day/weekend.
Randy F. lantorno Project Manager, Government Aftermarket SAS, EMS Division Curtiss-Wright 37 Coats Street, Suite 200, Wellsville, NY 14895 T: 585.596.3831 I M: 585.596.9248 I F: 585.596.3369 riantorno@curtisswright.com I www.cw-ems.com/sas From: Pannier, Stephen <Stephen.Pannier@nrc.gov>
Sent: Thursday, June 27, 2019 8:37 AM To: lantorno, Randy F <riantorno@curtfsswright.com>
Cc: Elliott, Robert <Robert.Elliott@nrc.gov>
Subject:
Proprietary Information in your 10 CFR Part 21 Reporting of Defects for lntrol Positioner 890265-010 - CW SAS Initial Report [EXTERNAL]
Hi Mr. lantorno, Thank you for our recent telephone conversation. On the call I stated that the NRC tries to make all Part 21 reports publicly available in the interest of public health and safety. We have an issue related to the subject Part 21 report that is keeping us from posting this document. The first page (email cover sheet) of your report, in the bottom paragraph states that "This e-mail and any files transmitted'with it are proprietary and intended solely for the use of the individual or entity to whom they are addressed."
The problem we have with this sentence involves the use of the word 'proprietary'. Paragraph (b) of Title 1O of the Code of Federal Regulations (10 CFR) Part 2.390 "Public inspections, exemptions and requests for withholding" provides guidance to the submitter of a document who wishes to withhold. information from the public. If this information is proprietary, then your organization must follow the steps in this section to have this information in your Part 21 report withheld from the public. Submitters us.ually provide us with a redacted version with proprietary information removed that we can make publicly available.
If instead the use of the word 'proprietary' in this cover letter is a more "boilerplate" like statement, and that this report contains no proprietary information, then I recommend that we line out the words "proprietary and" in the 1
cover letter, and then make this Part 21 publicly available as suomitted. Your email response will provide us with direction to take this approach.
I am sorry that we have to go through this extra step, but the agency has been chastised in the past for making Part 21 reports containing the words**confidential' and/or 'proprietary' that were inserted into 'boilerplate' cover letters or fax cover sheets available to the public, even though the information contained in the report was not in fact confidential or proprietary.
Please provide me with guidance on which approach you wish to take. Withholding this Part 21 report from the public by complying with the requirements of 10 CFR 2.390, or agreeing to allow us strike these two words
'proprietary and' from the report so we can make the current document publicly available.
Thank you for your prompt assistance in this matter.
Stephen J. Pannier Reactor Systems Engineer U.S. Nuclear Regulatory Commission (301) 415-4083 This e-mail and any files transmitted with it are proprietary and intended solely for the use of the individual or entity to whom they are addressed. If you have reason to bel_ieve that you have received this e-mail in error, please notify the sender and destroy this e-mail and any attached files. Please note that any views or opinions presented in this e-mail are solely those of the author and do not necessarily represent those of the Curtiss-Wright Corporation or any of its subsidiaries. Documents attached hereto may contain technology subject to the U.S. Export Regulations.'Recipient is solely responsible for ensuring that any re-export, transfer or disclosure of this information is in accordance with U.S.
Export Regulations. The recipient should check this e-mail and any attachments for the presence of viruses. Curtiss-Wright Corporation and its subsidiaries accept no liability for any damage caused by any virus transmitted by this e-mail.
2