MONTHYEARML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump ML22098A1172022-03-29029 March 2022 Engine Systems, Inc. Report No. 10CFR21-0134, Rev. 0 - 10CFR21 Reporting of Defects and Non-Compliance - (Emo Cylinder Head with Fireface Thickness Below Specification Cylinder Head P/N 40121485) ML22075A2192021-11-29029 November 2021 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0133, Rev. 0 - Swing Check Valve, P/N ESl50359 JAFP-21-0029, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2021-04-29029 April 2021 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues ML21096A1142021-04-0606 April 2021 Ametek Solidstate Controls - Updated Interim Notifcation ML20296A2762020-10-0606 October 2020 Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21 - Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML20021A0452020-01-0303 January 2020 Lake Engineering Co. - Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19263A6662019-09-0909 September 2019 Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 ML19213A0252019-07-26026 July 2019 Ultra Electronics - Update to ML19155A084 10CFR21 Interim Report ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19155A0842019-05-31031 May 2019 Ultra Electronics - Interim Notification Per 10CFR21 ML19106A1062019-04-12012 April 2019 Ametek Solidstate Controls - Notification of Potential Defect - 10 CFR Part 21 ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19029A1552018-12-27027 December 2018 10 CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0123, Rev. 1 ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17114A0692017-04-19019 April 2017 Part 21 Report - Control Rod Drive Mechanisms Contaminated with Chlorides ML17086A0222017-03-23023 March 2017 Part 21 - Failure of Power Supplies to Meet Voltage Stability Specifications ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17006A0102016-12-29029 December 2016 Engine Systems, Inc. - Part 21 Issues Identified with the Enterprise Diesel Engine Subcover ML17006A0142016-12-13013 December 2016 Enercon - Part 21 - Notification-Design Basis Errors Using Flo-2D Software ML16342A9812016-11-23023 November 2016 Enercon - Part 21 Notification - Design Basis Errors Using FLO-2D Software ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML15243A1742015-08-25025 August 2015 Part 21 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML15223B2682015-08-0707 August 2015 Part 21 - Damaged Surveillance Capsules ML15223B2662015-08-0707 August 2015 Part 21 Report - Crane Nuclear Pressure Seal Valve with Retaining Rings ML15201A2872015-07-0808 July 2015 Crane Nuclear, Inc. - Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance ML15134A0172015-05-0101 May 2015 Part 21 Report Regarding Potential Test Induced Defect in a 0867F Main Steam Safety Relief Valves ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML14309A5292014-10-31031 October 2014 Closure of 10 CFR Part 21 Interim Report - Engine Systems, Inc., Emergency Diesel Generator Heat Exchanger CEY564L-HEX ML14259A3892014-09-0808 September 2014 Part 21 - Failure to Meet Specified Irradiation During Testing of Coated Test Panels ML14318A1962014-09-0505 September 2014 CFR Part 21 Interim Report - Engine Systems, Inc. - Emergency Diesel Generator Heat Exchanger CEY564L-HEX ML14216A3772014-07-30030 July 2014 Part 21 Report - Incorrect Industrial Irradiator Dose ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14189A4172014-07-0707 July 2014 Closure of 10 CFR Part 21 Interim Report - Limitorque Valve Motor - Motor Operator of SMB-0 Valve Actuator ML14192A0382014-07-0303 July 2014 Part 21 Report Incorrect Industrial Irradiator ML14125A2702014-05-0202 May 2014 Missing Jam Nuts on Size 4, Pressure Class 600 Normally Open, In-Line Check Valve Per Flowserve Drawing No. 07-45546-01 W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation2014-04-11011 April 2014 Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation ML14079A0272014-03-13013 March 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14079A0282014-03-13013 March 2014 Part 21 - Allen Bradley Type 700RTC Relay Spuriously De-Energizing ML14069A4672014-02-26026 February 2014 Part 21 Report Involving a Potential Manufacturing Defect in Replacement Masterpact Cradles ML14042A2002014-01-21021 January 2014 Part 21 Report Regarding Non-Conformance of an Electrical Tubular Water Heater ML13260A0772013-09-12012 September 2013 10 CFR Part 21 Interim Report - General Electric (GE) Hitachi Nuclear Energy - Sbm Type Manual Switch ML13246A0872013-08-23023 August 2013 Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification IR 05000391/20130032013-08-21021 August 2013 Construction Deficiency Report 50-391/2013-03 - Failure to Implement Plant Changes - Final Report 2024-01-23
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24008A0692024-01-0404 January 2024 Part 21 Report No. 10CFR21-0137, Rev. 0 for Reportable Notification for an Emo Cylinder Liner with Bore Deficiency, P/N 9318833 (Component of Power Assembly P/N 40124897), S/N 20M0938 ML24002A7112023-12-28028 December 2023 Interim Part 21 Report of a Deviation or Failure to Comply - Lube Oil Scavenging and Fuel Oil Engine Driven Pump ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23241A0022023-08-25025 August 2023 Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils ML23221A3702023-08-0303 August 2023 Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0 ML23100A1072023-04-10010 April 2023 Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker ML23060A0412023-03-0101 March 2023 Part 21 Interim Report of a Deviation or Failure to Comply Associated with a Limitorque Actuator ML23038A0192023-02-0606 February 2023 Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays ML23025A2532023-01-25025 January 2023 Part 21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML23024A0292023-01-24024 January 2023 Part 21 Interim Report of a Deviation or Failure to Comply Associated with a Limitorque Actuator ML22341A0322022-11-30030 November 2022 10 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays ML22307A0602022-11-0303 November 2022 EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML22208A0042022-06-17017 June 2022 Nutherm International, Inc., USNRC 10CFR Part 21 Notification Reference: Arnold Magnetics Power Supply Part Number PBM-24-106 ML22153A0792022-04-0707 April 2022 10CFR Part 21 Notification for Curtiss-Wright Supplied RCS-Dresser Actuator P/N: SURE-24-10-4 ML23229A0052022-02-11011 February 2022 Ametek Solidstate Controls, Final 10CFR21 Report of a Potential Defect, Vishay Diodes. Reference Interim Report ML21092A129 Issued April 1, 2021 ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML21294A0292021-10-0404 October 2021 Flowserve Part 21 Notification for Limitorque Supplied DC Motor ML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML21225A0812021-08-0404 August 2021 Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML21168A2172021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors M210077, GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors2021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors ML21092A1292021-04-0101 April 2021 Ametek Solidstate Controls - Notification of Potential Defect ML20366A0482020-12-0707 December 2020 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0114, Rev. 1 ML21014A2342020-12-0707 December 2020 Fourth Interim Notification Per 10 CFR Part 21 Re Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20366A0472020-11-18018 November 2020 Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 ML20304A1612020-10-14014 October 2020 Lake Engineering Co., Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 Final Report Per 10 CFR Part 21 ML20176A4322020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients M200087, GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients2020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients ML20108F5302020-03-20020 March 2020 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0129, Rev. 0, Test Stand Deficiency - EMD Fuel Injectors P/N H40084720 ML20097B6912020-03-20020 March 2020 Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML20042E2522020-01-31031 January 2020 EN 54485 Target Rock Redacted Update to Part 21 Report on Defect of Modification of Valve Component and Main Disc Lift Misadjustment ML20029D1612020-01-21021 January 2020 10 CFR Part 21 Report, Notification of a Defect Modification of a Valve Component and Main Disc Lift Misadjustment ML20021A0452020-01-0303 January 2020 Lake Engineering Co. - Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19121A1552019-04-15015 April 2019 Curtiss-Wright Nuclear Division, Enertech - 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid ML19106A1062019-04-12012 April 2019 Ametek Solidstate Controls - Notification of Potential Defect - 10 CFR Part 21 2024-01-04
[Table view] |
Text
"
Hoc, HOOX From: Bob Malley <BMalley@cdtechno.com>
Sent: Tuesday, February 11, 2020 5:07- PM To: Hoc, HOOX Cc: Vince Grieb; Kristen Jamison; Jon Anderson; Ken Sigman
Subject:
[External_Sender] Part 21 Report - KCR-07 Attachments: KCR07 Part 21 Report 200211 CD Technologies.pdf NRC Ops Desk:
Attached please find a Part 21 report being submitted for issues with KCR-07 batteries.
Please acknowledge receipt.*
Bob Malley VP Customer Experience Bmalley@cdtechno.com Office 215-619-7830 Mobile 215-275-0548
\
This e-mail message and any attachments may contain information that is confide,ntial, privileged, or protected from disclosure. It is intended solely for the use of the individual(s) or entity to whom it was intended.to be addressed. If.you have received this e-mail by mistake, or you are not the intended recipient, any reading, disclosure, copying or other use of this communication is strictly prohibited. If you have received this communication in error, ple~se immediately ~dvise the sender at their phone number listed above, or by electronic mail and permanently delete the original and all copies of this e-mail and any attachments from all locations.
)
1
C::H -TECHNOLOGIES, INt P o w e r S o I u* t i o n s 1400 Union Meeting Road Blue Bell, PA 19422 Phone: (215) 619-7849 Fax: (215) 619-7840 February 11, 2020 US Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2746
Subject:
10CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries The purpose of this letter is to provide the NRC a report in general conformity to the requirements of 10CFR Part 21.21 (a)(2).
On December 6, 2019 Browns Ferry Nuclear Plant notified C&D of an issue with a KCR-07 battery where a crack had developed in the container wall, and electrolyte levels had dropped below the low-level line. C&D issued a Return Material Authorization to the customer, and the batteries were returned and analyzed. On February 3, 2020 this battery was analyzed, and the cause of the crack was determined to be caused by expansion of the post seals directly stressing the container walls. Although this unit passed capacity tes\ing after return to C&D, undetected loss of electrolyte in field units could impact the operability of KCR-07 systems in the field.
- Accordingly, C&D is submitting this report to the NRC and .notifying C&D's customers that use KCR-07 batteries of this report.
Required information per 10CFR Part 21.21(d)(4) follows:
(i) Name and Address of the individual or individuals informing the Commission.
Robert Malley VP Customer Experience designated by Rick Heller President and Chief Executive Officer C&D Technologies, Inc.
1400 Union Meeting Road Blue Bell, PA 19422-0858 (ii) Identification of the facility, the activity; or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
- KCR-07 batteries manufactured prior to January 2012. The battery manufacturing date is on the label. '
/
NRC Part 21 Report February 11, 2020 Page 2 of 3 (iii) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.
C&D Technologies, Inc.
1400 Union Meeting Road Blue Bell, PA 19422-0858 (iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.
Terminal seal expansion causing container cracking, leading to electrolyte loss.
Batteries with insufficient electrolyte may not meet discharge requirements.
(v) The date on which the information of such defect or failure to comply was obtained.
December 6, 2019 (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured or being manufactured for one br more facilities or activitie,s subject to the regulations in this Part.
KCR-07 batteries used in 1E applications shipped prior to January 2012.
Year Shipped Utility - Plant 2004 2005 2006 2007 2008 2009 2010 2011 Total Exelon Fitzpatrick 48 48 I
Exelon Limerick 7 70 77 First Energy Perry 3 3 TVA Browns Ferry 3 4 67 6 256 188 524 TVA Sequoyah 1 58 116 4 58 237 TVA Watts Bar 6 232 238 Grand Total 9 4 290 1 125 122 260 317 1128 (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
\
C&D implemented corrective actions to eliminate expansion of the positive post seal and to reinforce cover designs in 2011. Information from laboratory testing and field experience has shown that these corrective actions were effective at eliminating excessive stress in the post seal, cover, and container.
\
NRC Part 21 Report February 11, 2020 Page 3 of 3 (viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
U.S. Licensees using batteries possibly containing the potential defect are being notified of the filing of this report with recommendations that they examine their batteries for any signs of similar problems. See attached notification letter.
(ix) In the case of an early site permit, the entiti~s to whom an early site permit was transferred.
Not applicable If you have any questions or wish to discuss this matter or this report, please contact:
Robert Malley Kristen Jamison VP Customer Experience Nuclear Applications Engineer bmalley@cdtechno.com kjamison@cdtechno.com (215) 619-7830 (215) 775-1306 Sincerely, I'?
- ~(~
Robert Malley VP Customer Experience C&D Technologies, Inc.
Attachment - C&D Letter to Users of KCR-07 Batteries dated February 11, 2020 Cc: R. Heller K. Sigman B. Couch M. Williams J. Anderson K. Jamison
C::DTECHNOI.OGIES, INt Power Solutions 1400 Union Meeting Road Blue Bell, PA 19422 Phone: (215) 619-2700 Fax: (215) 619-7887 February 11 , 2020 Customer Name and Address Ref: KCR-07 Container Crack
Dear Sir/Madam:
C&D Technologies, Inc. ("C&D") is filing a report with the NRC for a possible risk with cracking KCR-07 containers shipped up to January 2012.
Background:
In December 2019, TVA-Browns Ferry notified C&D of a low electrolyte level in a Class1E KCR-07 battery caused by a crack in the upper corner of the container that extended below the low-level line. (Figure 1). The battery was manufactured in July 2010. C&D issued a Return Material Authorization to the customer, and the battery was returned and analyzed. Capacity testing was performed on receipt of the battery, and the battery ran over 100% capacity, despite the reduced electrolyte level. Testing and analysis continued to determine the cause for the container crack.
Crack Figure 1 The cause for the container crack was determined to be direct outward stress placed on the container walls by radial corrosion and expansion of the positive post seals. The corrosion of the post seal is caused by acid infiltration into the post seal. Lead metal exposed to acid and the charging potential of the cell is converted to lead dioxide. This conversion expands the post seal radially, placing stress on adjacent plastic parts.
KCR Container Crack February 11, 2020 Past experience with post seal corrosion and expansion had only resulted in failure (cracking) of the PVC covers, not the stronger polycarbonate container. Failure of the cover relieved the stress generated by post seal expansion, reducing or eliminating the stress on the container.
Failure of the cover posed no operability concern for the battery, as the primary safety function of electrolyte retention is fulfilled by the container.
Engineering analysis indicates that the KCR-07 is more susceptible to container cracking due to the proximity of the internal jar wall in relation to the post seal. In the KCR-07 there is minimal space between the post bushing and the inner edge of the container (Figure 2).
Post Seal Container Figure 2 There is insufficient space between the terminal seal and the container wall to relieve stress by failure of the cover material, and the stress is transmitted directly to the container wall. This results in the development of cracks in the upper corners of the container that grow down into the container as the post seal continues to expand exerting outward force on the internal container wall.
The development of post seal corrosion and cover failure was the subject of an intensive investigation from 2010-2011. C&D changed the process for manufacturing post seal assemblies and changed the cover design to minimize and relocate knit lines during this time. Since the changes were completed in late 2011 there have been no reported cases of enhanced post seal corrosion or cover cracking in vented battery products, including 1E products.
For the period 2002-2012 C&D shipped approximately 1200 Class 1E KCR-07 batteries to domestic and international customers. As of this date the only reported instance of container cracking has been at the TVA-Browns Ferry location.
Recommendations: C&D recommends that operators of KCR-07 batteries perform inspection and replace KCR-07 products exhibiting container or cover cracking. As noted above, corrective actions were completed in 2011 for post seal corrosion, and new products should not exhibit this failure mode.
Analysis activities are continuing on the vertical propagation of container cracks vs cover displacement and the effect of shock or seismic events. As more results are received, they will be transmitted to users of older KCR-07 products.
Corrective Actions: As noted above, C&D implemented corrective actions for the root causes of post seal corrosion and cover cracking in 2011, which were fully implemented by January 2012 .
Further information on these actions is available on request.
r KCR Container Crack February 11 , 2020 C&D Contacts: Further information on this issue can be obtained from:
Kristen Jamison - Nuclear Applications Engineer Office Phone 215-775-1306 Email: kjamison@cdtechno.com Robert Malley - VP Customer Experience Office Phone 215-619-7830 Email: bmalley@cdtechno.com Best Regards, Kristen Jamison Nuclear Applications Engineer C&D Technologies, Inc.
cc: R. Heller - President and CEO M. Williams - VP General Counsel J. Anderson - CTO K. Sigman - CCO B. Couch - COO R. Malley - VP Customer Experience D. Heimer - Senior Director Product Development
\