ML19338C435: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:'
* t1 h5 b kT b ! b hT l[h'[E.[,N E5!h                                                                                                I[
      ]
              ~
E$.2)',,'U,*[,' I.Z7'''
r                                                          NO. BOX 270                          Ii w,n n      ..,.r..a nuatin scwm,                                            HARif OHO. CONNECTICUT 06101          1 M ""                        *
                                                                                                                                    ./
L.          '.".. ';.;'
                              '.,'l.'..'.l"''.l,l,,.'.n.,,
l
                                        .                                                                                            ;-
l.
August 7, 1980 MP-2-4447 E
Mr. Boyce H. Grier Director, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission                                                                                      !
631 Park Avenue King of Prussia, Pennsylvania 19406
 
==Reference:==
Facility Operating License No. DPR-65                                                    ;.
Docket No. 50-336                                                                          g Reportable Occurrence R0-50-336/80-25/3L-0                                                t
 
==Dear Mr. Grier:==
 
Th'is letter forwards Licensee Event Report 80-25/3L-0 required to                                                  .
be submitted within thirty days pursuant to Millstone Unit 2 Appendix                                              .
A Technical Specifications, Section 6.9.1.9.b, conditions leading                                                          ;
to operation in a degraded mode permitted by a limiting condition                                                          i for operation. An additional three copies of the report are enclosed.                                                      !
I Yours truly,                                              [
NORTHEAST NUCLEAR ENERGY COMPAtlY MD
                                                                          . J. Mroczk Station Superintendent                        .
Millstone Nuclear Power Station EJM/RTB:kaf
 
==Attachment:==
LER 80-25/3L-0 cc:  Director, Office of Inspection and Enforcement, Washington, D.C.                                                ,
(30)
Director, Office of Management Information and Program Control, Washington, D.C. (3)
U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555 8 0080180//o S l          m              .m                        ..    .
                                                                                                                                      .}}

Revision as of 14:02, 31 January 2020

Forwards LER 80-025/03L-0
ML19338C435
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/07/1980
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19338C436 List:
References
MP-2-4447, NUDOCS 8008150405
Download: ML19338C435 (1)


Text

'

  • t1 h5 b kT b ! b hT l[h'[E.[,N E5!h I[

]

~

E$.2)',,'U,*[,' I.Z7

r NO. BOX 270 Ii w,n n ..,.r..a nuatin scwm, HARif OHO. CONNECTICUT 06101 1 M "" *

./

L. '.".. ';.;'

'.,'l.'..'.l".l,l,,.'.n.,,

l

.  ;-

l.

August 7, 1980 MP-2-4447 E

Mr. Boyce H. Grier Director, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission  !

631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License No. DPR-65  ;.

Docket No. 50-336 g Reportable Occurrence R0-50-336/80-25/3L-0 t

Dear Mr. Grier:

Th'is letter forwards Licensee Event Report 80-25/3L-0 required to .

be submitted within thirty days pursuant to Millstone Unit 2 Appendix .

A Technical Specifications, Section 6.9.1.9.b, conditions leading  ;

to operation in a degraded mode permitted by a limiting condition i for operation. An additional three copies of the report are enclosed.  !

I Yours truly, [

NORTHEAST NUCLEAR ENERGY COMPAtlY MD

. J. Mroczk Station Superintendent .

Millstone Nuclear Power Station EJM/RTB:kaf

Attachment:

LER 80-25/3L-0 cc: Director, Office of Inspection and Enforcement, Washington, D.C. ,

(30)

Director, Office of Management Information and Program Control, Washington, D.C. (3)

U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555 8 0080180//o S l m .m .. .

.