ML062090309: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML062090309
| number = ML062090309
| issue date = 06/29/2006
| issue date = 06/29/2006
| title = 2006/06/29-Email: (PA) Jim and Peter
| title = Email: (PA) Jim and Peter
| author name = Jackson W
| author name = Jackson W
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation

Revision as of 18:32, 7 December 2019

Email: (PA) Jim and Peter
ML062090309
Person / Time
Site: Pilgrim
Issue date: 06/29/2006
From: Jackson W
- No Known Affiliation
To: Jennifer Davis, Wen P
Division of Regulatory Improvement Programs
References
%dam200612, TAC MC9669
Download: ML062090309 (4)


Text

James Davis - Jim & Peter -- Page 1 James Davis Jim & Peter

- -.

Page 1 From: "wilbur jackson" <JacksonWR@msn.com>

To: "James Davis" <JAD @nrc.gov>, "Peter Wen"

<PXW.TWGWPO02.HQGWDO01 @nrc.gov>

Date: Thu, Jun 29, 2006 7:37 AM

Subject:

Jim & Peter --

Jim & Peter--

I apologize for the late-breaking questions. However, as I write up the report there are places where I simply cannot "connect the dots" without additional information.

The attached question relates to what kind of bolting the applicant has on flanged attachments to the RPV --

in terms of yield strength and nominal diameter. I suspect the answer is that yield strength is less than 150 ksi -- except for the RPV head bolts; and, ifso, that is all that I need them to tell me. If yield strength is greater than 150 ksi for bolts with diameter between 1" and 2", then I need them to commit to the augmented inspection as recommended by the GALL AMP or provide a basis for not doing so.

Hopefully, they can get this answered soon. The answer should be simiple; and it really does not need to become an RAI.

Thanks Bob Jackson CC: "Erach Patel" <erachp@comcast.net>

c:\temp\GW)00001.TMP Page 1 1 Mail Envelope Properties (44A3BB50.BEB :7 : 27627)

Subject:

Jim & Peter --

Creation Date Thu, Jun 29, 2006 7:36 AM From: "wilburjackson" <JacksonWR@msn.com>

Created By: JacksonWR @msn.com Recipients nrc.gov OWGWPOO3.HQGWDOO1 JAD (James Davis) nrc.gov TWGWPO02.HQGWDOO1 PXW

James Davis - AMR Question Set #04 -- Jackson.wpd Page 1 !1 I

Questions Related to PNPS Aging Management Review Results for LRA Section 3.1.1 (Reactor Vessel, Internals and Reactor Coolant System)

Prepared by Bob Jackson Question Number:

Question NEW QUESTION: (Submitted after site audit) 6/29/2006 3.1.1-34:

LRA Table 3.1.2-1 includes three AMR results lines related to bolting. Two of these lines

("incore housing bolting" and "other pressure boundary bolting") identify the aging effect of cracking (not due to fatigue) and the aging management program is Inservice Inspection.

GALL AMP XI.M18 (Bolting Integrity) refers to ASME Section XI requirements for detection of aging effects. However, for high strength bolting (> 150 ksi), the GALL AMP states that for bolting size greater than 1-inch nominal diameter a volumetric examination comparable to that of ASME Section XI Examination Category B-G-1 is required in addition to the visual examination required by Examination Category B-G-2 (for pressure retaining bolting 2" and less in diameter).

Sufficient information has not been found in the LRA or in other documents reviewed to determine whether the incore housing bolting and other pressure boundary bolting in Table 3.1.2-1 can be excluded from the augmented examination.

Question:

For the components described as "incore housing bolting" and "other pressure boundary bolting" in LRA Table 3.1.2-1, please provide the following information.

1) Is the yield strength of these components greater or less than 150 ksi?
2) Is the diameter of these components greater than 1", and less than or equal to 2"?
3) If any of these components have yield strength greater than 150 ksi and diameter between 1" and 2", will PNPS perform the augmented volumetric inspection as recommended in the GALL report? Alternatively, if such components are used at PNPS and PNPS does not propose to perform the augmented volumetric inspection, please provide a plant-specific basis to waive the augmented requirement of the GALL AMP.

1

James Davis - AMR Question Set #04 -- Jackson.wpd James Davis AMR Question Set #04

- -- Jackson.wpd Page 2 I Pae Questions Related to PNPS Aging Management Review Results for LRA Section 3.1.1 (Reactor Vessel, Internals and Reactor Coolant System)

Prepared by Bob Jackson 2