Line 3: Line 3:
| issue date = 07/28/2006
| issue date = 07/28/2006
| title = IR 05000261-06-003; Carolina Power and Light Company; 04/01/2006 - 06/30/2006; H.B. Robinson Steam Electric Plant, Unit 2, NRC Integrated Inspection
| title = IR 05000261-06-003; Carolina Power and Light Company; 04/01/2006 - 06/30/2006; H.B. Robinson Steam Electric Plant, Unit 2, NRC Integrated Inspection
| author name = Fredrickson P E
| author name = Fredrickson P
| author affiliation = NRC/RGN-II/DRP/RPB4
| author affiliation = NRC/RGN-II/DRP/RPB4
| addressee name = Walt T D
| addressee name = Walt T
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000261
| docket = 05000261
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:July 28, 2006Carolina Power and Light CompanyATTN:Mr. Tom WaltVice President - Robinson PlantH. B. Robinson Steam Electric Plant Unit 2 3851 West Entrance Road Hartsville, SC 29550SUBJECT:H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INTEGRATEDINSPECTION REPORT 05000261/2006003
[[Issue date::July 28, 2006]]
 
Carolina Power and Light CompanyATTN:Mr. Tom WaltVice President - Robinson PlantH. B. Robinson Steam Electric Plant Unit 2 3851 West Entrance Road Hartsville, SC 29550
 
SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INTEGRATEDINSPECTION REPORT 05000261/2006003


==Dear Mr. Walt:==
==Dear Mr. Walt:==
On June 30, 2006, the US Nuclear Regulatory Commission (NRC) completed an inspection atyour H.B. Robinson reactor facility. The enclosed integrated inspection report documents theinspection findings, which were discussed on July 12, with you and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.
On June 30, 2006, the US Nuclear Regulatory Commission (NRC) completed an inspection atyour H.B. Robinson reactor facility. The enclosed integrated inspection report documents theinspection findings, which were discussed on July 12, with you and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, the inspectors identified one issue of very low safetysignificance (Green). This issue was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it has been entered into your corrective action program, the NRC is treating this issue as a non-cited violation (NCV), inaccordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest this NCV, youshould provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, the inspectors identified one issue of very low safetysignificance (Green). This issue was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it has been entered into your corrective action program, the NRC is treating this issue as a non-cited violation (NCV), inaccordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest this NCV, youshould provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the H.B. Robinson facility.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosure will be available electronically for public inspection in the NRC Public 2Document Room or from the Publicly Available Records (PARS) component of NRC'sdocument system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
0001; and the NRC Resident Inspector at the H.B. Robinson facility.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosure will be available electronically for public inspection in the NRC Public 2Document Room or from the Publicly Available Records (PARS) component of NRC'sdocument system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/
Sincerely,
/RA/
Paul E. Fredrickson, ChiefReactor Projects Branch 4 Division of Reactor ProjectsDocket No.:50-261License No.:DPR-23
Paul E. Fredrickson, ChiefReactor Projects Branch 4 Division of Reactor ProjectsDocket No.:50-261License No.:DPR-23


===Enclosure:===
===Enclosure:===
Inspection Report 05000261/2006003
Inspection Report 05000261/2006003w/Attachment: Supplemental Information
 
===w/Attachment:===
Supplemental Informationcc w\encls:(See page 3)
 
_ML062090230 OFFICEDRSDRSDRSDRPDRPDRPSIGNATUREJLK /RA/RKH /RA/WTL /RA/SON /RA/DWJ /RA/RCH /RA/NAMEJKrehRHamiltonWLooSNinhDJonesBHagarDATE7/24/067/24/067/24/067/24/067/28/067/28/06 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO 3cc w/encls:William G. Noll Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail DistributionDaniel G. StoddardPlant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail DistributionChris L. Burton, ManagerPerformance Evaluation and Regulatory Affairs CPB 9 Electronic Mail DistributionC. T. Baucom, SupervisorLicensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail DistributionJ. F. Lucas, ManagerSupport Services - Nuclear Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail DistributionHenry J. Porter, DirectorDiv. of Radioactive Waste Mgmt.
 
Dept. of Health and Environmental Control Electronic Mail DistributionR. Mike GandyDivision of Radioactive Waste Mgmt.
 
S. C. Department of Health and Environmental Control Electronic Mail DistributionBeverly Hall, Acting DirectorDivision of Radiation Protection N. C. Department of Environment, Health and Natural Resources Electronic Mail DistributionDavid T. ConleyAssociate General Counsel - Legal Dept.
 
Progress Energy Service Company, LLC Electronic Mail DistributionJohn H. O'Neill, Jr.Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail DistributionRobert P. GruberExecutive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326Public Service CommissionState of South Carolina P. O. Box 11649 Columbia, SC 29211Distribution w/encl: (see page 4)
4Report to from Paul Fredri ckson dated July 28,2006


SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INTEGRATEDINSPECTION REPORT 05000261/2006003Distribution w/encl
REGION IIDocket No:50-261License No:DPR-23 Report No:005000261/2006003 Facility:H. B. Robinson Steam Electric Plant, Unit 2 Location:3581 West Entrance RoadHartsville, SC 29550Dates:April 1, 2006 - June 30, 2006 Inspectors:R. Hagar, Senior Resident InspectorD. Jones, Resident Inspector R. Hamilton, Senior Health Physicist (Sections 2OS1, 4OA1, 4OA5)
:C. Patel, NRR C. Evans L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC U. S. NUCLEAR REGULATORY COMMISSIONREGION IIDocket No:50-261License No:DPR-23 Report No:005000261/2006003 Facility:H. B. Robinson Steam Electric Plant, Unit 2 Location:3581 West Entrance RoadHartsville, SC 29550Dates:April 1, 2006 - June 30, 2006 Inspectors:R. Hagar, Senior Resident InspectorD. Jones, Resident Inspector R. Hamilton, Senior Health Physicist (Sections 2OS1, 4OA1, 4OA5)
W. Loo, Senior Health Physicist (Section 2PS2)
W. Loo, Senior Health Physicist (Section 2PS2)
J. Kreh, Senior Health Physicist (Section 2OS2)Approved by:P. Fredrickson, ChiefReactor Projects Branch 4 Division of Reactor Projects 2Enclosure
J. Kreh, Senior Health Physicist (Section 2OS2)Approved by:P. Fredrickson, ChiefReactor Projects Branch 4 Division of Reactor Projects 2Enclosure
Line 277: Line 259:
NoneOpened and  
NoneOpened and  
===Closed===
===Closed===
: 05000261/2006003,NCV,Failure to Meet Technical Specification Requirements forRadiation Protection Manager Qualification (Section 2OS1).ClosedNone
05000261/2006003,NCV,Failure to Meet Technical Specification Requirements forRadiation Protection Manager Qualification (Section 2OS1).ClosedNone


===Discussed===
===Discussed===
Line 286: Line 268:
: 112948, Steam Driven Auxiliary Feedwater PumpService Water Train A:Clearance Order Checklist
: 112948, Steam Driven Auxiliary Feedwater PumpService Water Train A:Clearance Order Checklist
: 111512, Inspection and Testing of 52/CB-1 and 52/CB-2 (ServiceWater Pump D)Operating Procedure,
: 111512, Inspection and Testing of 52/CB-1 and 52/CB-2 (ServiceWater Pump D)Operating Procedure,
: OP-903 Service Water System, Rev. 96Emergency Diesel Generator system:Drawing G-190204-A, Emergency Diesel Generator System Flow Diagram, Rev. 181R05Fire ProtectionUFSAR Sections3.1.5.5, Fire Zone 19 - Unit 2 Cable Spreading Room3.1.5.6, Fire Zone 20 - Emergency Switchgear Room and Electrical Equipment Area  
: OP-903 Service Water System, Rev. 96Emergency Diesel Generator system:Drawing G-190204-A, Emergency Diesel Generator System Flow Diagram, Rev. 181R05Fire ProtectionUFSAR Sections3.1.5.5, Fire Zone 19 - Unit 2 Cable Spreading Room3.1.5.6, Fire Zone 20 - Emergency Switchgear Room and Electrical Equipment Area
: 3.1.3.2, Fire Zone 7 - Auxiliary Building Hallway (Ground Floor)3.1.5.7, Fire Zone 22 - Control Room
: 3.1.6, Appendix R Fire Area A6 (Fire Zone 6) - Auxiliary Feedwater Pump Room3.1.1, Appendix R Fire Area A1 (Fire Zone 1) - Diesel Generator B RoomProceduresresults from
: OST-611-11, Low Voltage Fire Detection and Actuation System Zones 19 and 20(Semi-Annual), Rev. 4, dated 12/8/05results from
: OST-611-6, Low Voltage Fire Detection and Actuation System Zones 11 and 13(Semi-Annual), Rev. 3, dated 12/24/05results from
: OST-611-12, Low Voltage Fire Detection and Actuation System Zones 22 and 23(Semi-Annual), Rev. 3, dated 12/30/05 ProceduresOMM-003, Fire Protection Pre-Plans/Unit No. 2, Rev. 45uncontrolled pre-plan for building number 360 © Auxiliary Boiler Building)
: A-41R06Flood Protection MeasuresProcedure
: AOP-022, Loss of Service Water, Rev. 281R07Heat Sink PerformanceProcedure
: CM-201, Safety Related and Non-Safety Related Heat Exchanger Maintenance,Rev. 381R11Licensed Operator RequalificationOperations Training ScenariosLOCT-05-6, [Abnormal Operating Procedure] Scenario, Rev. 1LOCT-05-5, Full Scope Scenario, Rev. 1
: SSS-002, Static Simulator Scenario, Rev. 81R12Maintenance EffectivenessAction Requests176109, Failure of [Component Cooling Water] Pump A to Start from the [Control Board]179668, Failure of [Component Cooling Water] Pump A to Start
: 2271, Single Functional Failure of Emergency Lighting SystemProceduresPM-047, Emergency Lighting System Unit Load Test, Rev. 5PM-459, Self-Contained DC Emergency Lighting System, Rev. 9
: SP-771, Verification and Documentation of Dedicated Shutdown Emergency LightingAdequacy, Rev. 1Maintenance Rule DocumentsFor system 4080 (Component Cooling Water System):*Event Log Report for 1/1/04 - 5/23/06
*Scoping and Performance CriteriaFor system 5215 (Emergency DC Lighting System):*Scoping and Performance Criteria OtherWork Order
: 791211-01,
: ELS-27 Failed to Light During
: SP-771Work Order
: 791207-01,
: ELS-50 Failed to Light During Performance
: SP-7711R13Maintenance Risk Assessments and Emergent Work EvaluationProcedure
: OMM-048, Work Coordination and Risk Assessment, Rev. 26
: 1R14Personnel Performance During Nonroutine Plant EvolutionsProcedure
: OP-105, Maneuvering the Plant When Greater Than 25 percent Power, Rev. 33
: A-5Guidance for April 15, 2006 Power Maneuver, dated 04/12/20061R15Operability EvaluationsGeneric Issue Document, GID/90-181/00/RCI, Reactor Containment Isolation, Rev. 7UFSAR Section 6.4, Habitability System
: UFSAR Section 9.4.2, Control Room Air Conditioning System Engineering Service Request
: 9700249, [Water Cooled Condensing Unit] Heater AlarmInformation, Rev. 0Procedure
: APP-048, Main Control Room [Heating Ventilation and Air Conditioning] SystemPanel, Rev. 14Design Basis Document, DBD/R87038/SD36, Post-Accident [Heating Ventilation and AirConditioning] Systems, Rev. 101R19Post Maintenance TestingProcedureOST-302-2, Service Water Pumps C and D Inservice Test, Rev. 38MST-030, 4 KV Undervoltage to Reactor Protection Testing, Rev. 4
: MST-020, Reactor Protection Logic Train A at Power, Rev. 25
: OST-401-2, [Emergency Diesel Generator] B Slow Speed Start, Rev. 28
: OP-903, Service Water, Rev. 96
: PM-323, Circuit Breakers 52/CB-1 and 52/CB-2, Rev. 1
: OST-201-2, MDAFW System Component Test - Train B, Rev. 23Work Order816679-01, Check and Reset Impeller Clearance on D Service Water Pump793674-05, Replace Motor Cut-off Switch on [Dedicated Shutdown] Breaker 52/33B
: 810509-01, Replace Solenoid Coils B [Emergency Diesel Generator] Air Start
: 515348-01, Manual Breakers [Service Water Pump] D Normal/Alternate SupplyDrawingsCP-380-5379-3246, Reactor Protection System, Sheet 8 of 14, Rev. 12
: 1R22Surveillance TestingProceduresOST-051, Reactor Coolant System Leakage Evaluation, Rev. 34OST-202, Steam Driven Auxiliary Feedwater System Component Test, Rev. 62OST-902, Containment Fan Coolers Component Test, Rev. 34
: MST-902, A and B Station Battery Test, Rev. 26
: OST-252-2, RHR System Valve Test, Rev. 16OST-924-1, Area Radiation Monitoring System, Rev. 11
: OtherInstruction Manual, Anton Paar -
: DMA 35N, Portable Density/Specific Gravity/ConcentrationMeter1R23Temporary Plant Modifications
: A-6Engineering Change 63769, C Steam Generator Secondary Manway Leak Repair, Rev. 2 Engineering Change
: 63967, Recorder Installation to Monitor
: PC-951B, Rev 0
: EGR-NGGC-005, Engineering Change, Rev. 242OS1Access Control To Radiologically Significant AreasProcedures and Guidance DocumentsAP-031, Administrative Controls for Entry into Locked and Very High Radiation Areas, Revision  (Rev.) 39
: CAP-NGGC-0200, Corrective Action Program, Rev. 16
: CAP-NGGC-0202, Operating Experience Program, Rev. 10
: CAP-NGGC-0205, Significant Adverse Condition Investigations, Rev. 4
: CAP-NGGC-0206, Corrective Action Program Trending and Analysis, Rev. 1
: DOS-NGGC-0007, Internal Dose Calculations, Rev. 9
: HPP-001, Radiologically Controlled Area Surveillance Program, Rev. 85HPP-004, Radiological Control of Tools and Equipment, Rev. 48
: HPP-006, Radiation Work Permits, Rev. 70
: HPP-007, Handling and Storage of Contaminated and Radioactive Materials, Rev. 25
: HPP-008, Steam Generator Inspection and Maintenance, Rev. 24
: HPP-009, Control of Radiographic Operations, Rev. 19
: HPP-010, Control of Radioactive Materials Outside of the Primary Radiation Control Area, Rev. 16
: HPP-012, Monitoring and Changing of Plant Process Filters, Rev. 12
: HPP-013, Radiation Protection During Operations, Rev. 9
: HPP-105, Airborne Radioactivity Surveillance, Rev. 29HPP-111, Control and Use of Respiratory Protection Equipment, Rev. 32
: HPP-314, Removal of Tri-Nuc Filters/Trash from the Spent Fuel Pool, Rev. 10
: HPP-500-3, Radiation Control Work Planning Process, Rev. 10
: HPP-500-4, Health Physics - Conduct of Pre-job Briefings, Rev. 8
: HPP-500-5, Radiation Control - Conduct of Radiological Job Coverage, Rev. 2
: HPS-NGGC-0003, Radiological Posting, Labeling and Surveys, Rev. 8
: HPS-NGGC-0013, Personnel Contamination Monitoring, Decontamination, and Reporting,
: Rev. 3
: HPS-NGGC-0014, Radiation Work Permits, Rev. 3
: HPS-NGGC-0016, Access Control, Rev. 2
: NGGM-PM-0002, Radiation Control & Protection Manual, Rev. 35
: PLP-031, Contamination Monitoring Program for Personnel/personal Effects, Rev. 30
: PLP-061, Special Nuclear Material (SNM) Control and Accounting, Rev. 14Records and DataCertificate of Compliance 1004, USA/72-1004, Amendment 8, 12/05/2005Letter
: RNP-RA/06-0053, Supplemental Response To Allegation No.
: RII-2006-A-0015, 06/19/06Assessment and Corrective Action Program (CAP) DocumentsNuclear Assessment Section (NAS) Report,
: RO-23 Outage Assessment, RNAS 05-083,
: 12/6/2005NAS Report, Robinson Nuclear Plant Radiation Protection Assessment Report, RNAS 05-081,
: 11/21/2005
===Nuclear Condition Report===
(NCR)
: 00173085, Workers Asked To Exit Transfer Canal Because Of
: Dose Rates
: AR 00182121, Problems Encountered With WWDS Resin Sluice
: AR 00188589, Evaluate Survey Frequency For High Radiation Areas
: AR 00192368, Evaluate Existing RA's In Plant For Removal
: AR 00192585, Negative Observations Regarding Radiation Worker Practices
: AR 00193534, Posting Found Partially Down
: AR 00196749, RC Work Planning Process Self-Assessment Report,
: 141814, Material and Personnel Release, 06/06-06/10/052OS2ALARA Planning and ControlsProcedures and Guidance DocumentsADM-NGGC-0105,
: ALARA Planning, Rev. 7CAP-NGGC-0200, Corrective Action Program, Rev. 16
: CP-010, Primary System Chemistry, Rev. 21
: EGR-NGGC-0201, Incorporation of ALARA for Design and Engineering Work, Rev. 2
: EC-04-001, Primary Chemistry Strategic Plan, Rev. 1
: HPP-500-3, Radiation Control Work Planning Process, Rev. 10
: PLP-017, ALARA Program and ALARA Committee Activities/Responsibilities, Rev. 21Robinson Nuclear Plant, ALARA Continuous Improvement Plan, Fuel Cycle 24, Rev. 0Records and DataALARA Review Status, 10/25/2005ALARA Work Plan (AWP) Number (No.) 23-027,
: RO-23 Permanent Shield Wall, Rev. 0
  (including post-job ALARA critique)
: AWP No. 23-029,
: RO-23 VHRA/LHRA Barriers, Rev. 0 (including post-job ALARA critique)
: AWP No. 23-043, Reactor Head Replacement Project, Rev. 0 (including post-job ALARA
critique)
: AWP No. 23-045,
: RO-23 CCW Support Modification, Rev. 0 (including post-job ALARA critique)
: Cobalt 58 Activity Comparisons for
: RO-19 through RO-23
: NAS Report No. R-OM-05-02,
: RO-23 Outage Assessment, 12/06/2005
: Progress Energy, H. B. Robinson Nuclear Plant, 2005 ALARA Report, 03/02/2006
: Progress Energy, H. B. Robinson Nuclear Plant, Refueling Outage No. 23, ALARA Report,
: 01/11/2006
: RO-23 Shutdown Chemistry and Dose Rate Data for Letdown Line Radiation Monitor R-9
: Response for
: RO-19 through RO-23
: RO-23 Daily RC Status Report, 10/26/2005 (compilation of final dose and AWP data from
: RO-23)CAP DocumentsAR
: 170637, LHRA Barrier Modification Project exceeded dose projections in the ALARA Plan
: A-8AR
: 171312, Initial dose projection for the Permanent Shield Wall Barrier modification was low  and required development of an ALARA Plan during the ongoing work
: AR 171313, Initial dose projection for the CCW Support modification was low and required development of an ALARA Plan during the ongoing work
: AR 171906,
: RMS-1, -2, -3, -4 modification exceeded the dose estimate for the job by an appreciable amount
: AR 173047, Contamination levels at the start of cavity decontamination were higher than  expected
: AR 177679, Reactor head set duration in
: RO-23 was longer than expected due to the extra precautions taken by the refueling team
: AR 198913, Some items in lessons learned database were inadequately dispositioned2PS2Radioactive Material Processing and TransportationProcedures and Guidance DocumentsAP-032, Radioactive Waste Volume Reduction, Rev. 12CAP-NGGC-0200, Corrective Action Program, Rev. 16
: CAP-NGGC-0201, Self-Assessment Program, Rev. 8
: CP-100, Waste Water Demineralization System Operation and CVCS Hut Water Processing, Rev. 39
: HPS-NGGC-0001, Radioactive Material Receipt and Shipping Procedure, Rev. 17
: HPP-004, Radiological Control of Tools and Equipment, Rev. 48
: HPP-007, Handling and Storage of Contaminated and Radioactive Materials, Rev. 25
: HPP-010, Control of Radioactive Materials Outside of the Primary Radiation Control Area, Rev. 16
: HPP-203, Resin Transfer from the 40 Cubic Foot Bechtel Pressure Vessel to a Waste Processing Container, Rev. 0
: HPP-218, Collection and Sorting of Trash and Laundry, Rev. 12
: HPP-241, Annual Solid Waste Report, Rev.6
: HPP-242, Control of Contaminated Waste Oil Storage System, Rev. 10
: HPP-245, Handling and Storage of Mixed Waste, Rev. 5
: NGGM-PM-0002, Radiation Control & Protection Manual, Rev. 3
: Process Control Program (PCP), Rev. 5Records and DataRadioactive Material Shipping and Receiving Logs for Calendar Years 2004, 2005 and 2006
: Year-To-Date Radman Database Report for Robinson Nuclear Power Plant, Change 43, Dated 05/22/06
: Shipping Papers for Shipment Nos. 05-0043, 05-0050, 05-0087, 06-0009, 06-0011, 06-0025,  and 06-0026Assessment and CAP DocumentsAR
: 00153766, Received
: HIC-Ar-195-218 that was incorrectly stenciledAR
: 00166938, Error on radioactive label on new fuel shipment that arrived from Areva Framatome due to printing flaw from manufacturer on one of two labels
: A-9AR
: 00168256, A review of the source inventory and certification log book found that  radioactive receipt paperwork had not been completed for a source
: AR 00172998, Limited quantity package containing a source was received with the bottom reading 0.8 mrem/hr using a GM tube meter, vendor used an ion chamber Self-Assessment Report No.
: 141812, Radwaste Volume Reduction 4OA1Performance Indicator VerificationDose Equivalent Iodine Results, dated 11/04, 03/05, and 09/05Procedure
: RCP-101, Preparation of Effluent and Non-Effluent Samples, Rev. 8
===Procedure===
: CP-023, Gas Analysis, Rev. 15
===Procedure===
: RCP-133, Determination of [Reactor Coolant System] Radiochemical, E-Bar and I-131 Dose Equivalent, Rev. 12 results from
: OST-051, Reactor Coolant System Leakage Evaluation, dated 10/2004 - 12/20054OA2Identification and Resolution of ProblemsSite-Wide Analysis of Condition Reports for Performance Trends: January 1 - March 31, 2006 Robinson Engineering Monthly Performance Report: May 18, 2006; February 22, 2006; March20, 2006; April 25, 2006Maintenance CAP Rollup & Trend Analysis: December, 2005; January, 2006; February, 2006
: E&C and RC CAP Rollup & Trend Analysis: December, 2005; January, 2006; February, 2006
: Operations CAP Rollup & Trend Analysis: November and December, 2005; January, 2006;February, 2006Plant Support Group CAP Rollup & Trend Analysis: December, 2005 and January, 2006;February and March, 20064OA5Independent Spent Fuel Storage InstallationsRecords and DataCertificate of Compliance 1004, USA/72-1004, Amendment 8, 12/05/2005Quarterly TLD Results 2d Quarter 2005 to 1
st
: Quarter 2006Shift Turnover Logs 08/02 - 09/02/2005
: Surveys of Cask, Cask Preparation Area, Spent Fuel Pool and ISFSI
}}
}}

Revision as of 15:21, 13 July 2019

IR 05000261-06-003; Carolina Power and Light Company; 04/01/2006 - 06/30/2006; H.B. Robinson Steam Electric Plant, Unit 2, NRC Integrated Inspection
ML062090230
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/28/2006
From: Fredrickson P
NRC/RGN-II/DRP/RPB4
To: Walt T
Carolina Power & Light Co
References
IR-06-003
Download: ML062090230 (33)


Text

July 28, 2006Carolina Power and Light CompanyATTN:Mr. Tom WaltVice President - Robinson PlantH. B. Robinson Steam Electric Plant Unit 2 3851 West Entrance Road Hartsville, SC 29550SUBJECT:H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INTEGRATEDINSPECTION REPORT 05000261/2006003

Dear Mr. Walt:

On June 30, 2006, the US Nuclear Regulatory Commission (NRC) completed an inspection atyour H.B. Robinson reactor facility. The enclosed integrated inspection report documents theinspection findings, which were discussed on July 12, with you and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, the inspectors identified one issue of very low safetysignificance (Green). This issue was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it has been entered into your corrective action program, the NRC is treating this issue as a non-cited violation (NCV), inaccordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest this NCV, youshould provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the H.B. Robinson facility.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosure will be available electronically for public inspection in the NRC Public 2Document Room or from the Publicly Available Records (PARS) component of NRC'sdocument system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Paul E. Fredrickson, ChiefReactor Projects Branch 4 Division of Reactor ProjectsDocket No.:50-261License No.:DPR-23

Enclosure:

Inspection Report 05000261/2006003w/Attachment: Supplemental Information

REGION IIDocket No:50-261License No:DPR-23 Report No:005000261/2006003 Facility:H. B. Robinson Steam Electric Plant, Unit 2 Location:3581 West Entrance RoadHartsville, SC 29550Dates:April 1, 2006 - June 30, 2006 Inspectors:R. Hagar, Senior Resident InspectorD. Jones, Resident Inspector R. Hamilton, Senior Health Physicist (Sections 2OS1, 4OA1, 4OA5)

W. Loo, Senior Health Physicist (Section 2PS2)

J. Kreh, Senior Health Physicist (Section 2OS2)Approved by:P. Fredrickson, ChiefReactor Projects Branch 4 Division of Reactor Projects 2Enclosure

SUMMARY OF FINDINGS

IR 05000261/2006-003; 04/01/2006 - 06/30/2006; Carolina Power and Light Company; H.B.Robinson Steam Electric Plant, Unit 2; Access Control to Radiologically Significant Areas The report covered a three month period of inspection by resident inspectors, a senior healthphysicist, a health physicist and an emergency preparedness inspector. One Green non-cited violation was identified. The significance of most findings is indicated by their color (Green,

White, Yellow, Red) using IMC 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercialnuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 3,dated July 2000.A.

NRC-Identified and Self-Revealing Findings

Cornerstone: Occupational Radiation Safety

Green.

The inspectors identified a non-cited violation (NCV) of Technical Specifications (TS)5.3.1 for failure to ensure the Manager of Radiation Control function met the minimum qualification requirements specified in ANSI/ANS 3.1-1981, American National Standard for Selection, Qualification, and Training of Personnel for Nuclear Power Plants. The finding is greater than minor because it is associated with the Occupational RadiationSafety Cornerstone attribute of Program and Process and adversely affected the cornerstone objective of ensuring the adequate protection of the worker health and safety from exposure to radiation from radioactive material during routine civilian nuclear reactor operation. This finding was evaluated using the Occupational Radiation Safety SDP and was determined to be of very low safety significance because there were supervisors in the Radiation Protection department who met the minimum qualification requirements for this position and these individuals provided advise and assistance to the assigned Manager of Radiation Control. This finding was entered into the corrective action program as Action Requests (ARs) 187587 and 196260 (Section 2OS1).

B. Licensee-Identified Violations

None.

Enclosure

REPORT DETAILS

Summary of Plant Status The unit began the inspection period at full rated thermal power. OnApril 15, power was reduced to approximately 35 percent power to enable repair of a steam leak inside containment. On April 16, the unit was returned to full power and operated at full power for the remainder of the inspection period.1.REACTOR SAFETYCornerstones: Initiating Events, Mitigating Systems, Barrier Integrity1R01Adverse Weather Protection

a. Inspection Scope

When a tornado watch that was a result of Tropical Depression Alberto was issued forthe site on June 14, the inspectors reviewed actions taken by the licensee in accordance with Procedure , prior to theonset of that weather

, to ensure that the adverse weather conditions would neitherinitiate a plant event nor prevent any system, structure, or component (SSC) fromperforming its design function. Documents reviewed are listed in the Attachment.

b. Findings

No findings of significance were identified.

1R04 Equipment Alignment

a. Inspection Scope

Partial System Walkdowns:The inspectors performed the following three partial system walkdowns, while theindicated SSCs were out-of-service for maintenance and testing:System Walked DownSSC Out-of-ServiceMotor driven auxiliary feedwater (AFW) Steam driven AFW pumptrains A and BService water (SW) Train AD SW pump B emergency diesel generator (EDG)A EDG To evaluate the operability of the selected trains or systems under these conditions, theinspectors compared observed positions of valves, switches, and electrical power breakers to the procedures and drawings listed in the Attachment.

4Enclosure

b. Findings

No findings of significance were identified.

1R05 Fire Protection

a. Inspection Scope

For the six areas identified below, the inspectors reviewed the control of transientcombustible material and ignition sources, fire detection and suppression capabilities,fire barriers, and any related compensatory measures to verify that those items were consistent with Updated Final Safety Analysis Report (UFSAR) Section 9.5.1, Fire Protection System, and UFSAR Appendix 9.5.A, Fire Hazards

Analysis.

The inspectors walked down accessible portions of each area and reviewed results from related surveillance tests to verify that conditions in these areas were consistent with descriptions of the areas in the UFSAR. Documents reviewed are listed in the

.The following areas were inspected:

Fire ZoneDescription19Unit 2 Cable Spreading Room20Emergency Switchgear Room and Electrical Equipment Area 7Auxiliary Building Hallway (Ground Floor)22Control Room 6AFW Pump room 1Diesel Generator B RoomAlso, to evaluate the readiness of personnel to prevent and fight fires, the inspectorsobserved fire brigade performance during the announced fire drill held on June 8 in thebuilding that houses the C auxiliary boiler.

b. Findings

No findings of significance were identified.

1R06 Flood Protection Measures

a. Inspection Scope

5EnclosureInternal FloodingBecause the component cooling water pump room contains risk-significant SSCs whichare susceptible to flooding from postulated pipe breaks, the inspectors walked down the room to verify that the area configuration, features, and equipment functions wereconsistent with the descriptions and assumptions used in Calculation RNP-F/PSA-0009, Assessment of Internally Initiated Flooding Events. The inspectors also reviewed the operator actions in Procedure AOP-022, Loss of Service Water, Attachment 4, Flood Control in the Auxiliary Building to verify that the desired results could be achieved.

Documents reviewed are listed in the Attachment.

b. Findings

No findings of significance were identified.

1R07 Heat Sink PerformanceAnnual Review

a. Inspection Scope

The inspectors observed the biennial inspection of the jacket-water and lubricating-oilheat exchangers on the A EDG to verify that inspection results were appropriately categorized against the pre-established acceptance criteria described in Procedure CM-201, Safety Related and Non-Safety Related Heat Exchanger Maintenance. The inspectors also verified that the frequency of inspection was sufficient to detect degradation prior to loss of heat removal capability below design basis values. Documents reviewed are listed in the Attachment.

b. Findings

No findings of significance were identified.

1R11 Licensed Operator Requalification

a. Inspection Scope

The inspectors observed licensed-operator performance during requalification simulatortraining for crew one to verify that operator performance was consistent with expected operator performance, as described in three training scenarios that are listed in the

. This training tested the operators' ability to respond to a loss of condenservacuum caused by a reactor trip, a large break loss of coolant accident, and a loss of a SW header. The inspectors focused on clarity and formality of communication, the use of procedures, responses to alarms, control board manipulations, group dynamics, and supervisory oversight.

6EnclosureThe inspectors observed the post-exercise critique to verify that the licensee identifieddeficiencies and discrepancies that occurred during the simulator training.

b. Findings

No findings of significance were identified.

1R12 Maintenance Effectiveness

a. Inspection Scope

The inspectors reviewed the two degraded SSC/function performance problems orconditions listed below to verify the appropriate handling of these performance problems or conditions in accordance with 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, and 10 CFR 50.65, Maintenance Rule. Documents reviewed are listed in the

. Performance Problem/ConditionAR Component cooling water pump A failed to start 179668when the control switch was taken to start.Single functional failure of emergency lighting system 182271During the reviews, the inspectors focused on the following:

  • Appropriate work practices,*Identifying and addressing common cause failures,
  • Characterizing reliability issues (performance),
  • Charging unavailability (performance),*Trending key parameters (condition monitoring),
  • 10 CFR 50,65(a)(1) or (a)(2) classification and reclassification, and
  • Appropriateness of performance criteria for SSCs/functions classified (a)(2) and/orappropriateness and adequacy of goals and corrective actions for SSCs/functions classified (a)(1).

b. Findings

No findings of significance were identified.

1R13 Maintenance Risk Assessments and Emergent Work Evaluation

a. Inspection Scope

7EnclosureFor the three time periods listed below, the inspectors reviewed risk assessments andrelated activities to verify that the licensee performed adequate risk assessments and implemented appropriate risk-management actions when required by 10 CFR 50.65(a)(4). For emergent work, the inspectors also verified that any increase in risk was promptly assessed, and that appropriate risk-management actions were promptly implemented. Documents reviewed are listed in the Attachment. *Work week of April 1 - April 7, including scheduled maintenance on the D SW pumpand associated breaker*Work week of April 29 - May 5, including scheduled maintenance on the C SW pumpand B fuel oil transfer pump breaker*Work week of May 13 - May 19, including scheduled maintenance on the A motor-driven feedwater pump and emergent work on the D instrument air compressor

b. Findings

No findings of significance were identified.

1R14 Personnel Performance During Nonroutine Plant Evolutions

a. Inspection Scope

During the two non-routine evolutions identified below, the inspectors observed plantinstruments and operator performance to verify that the operators performed inaccordance with the associated procedures and training.*The downpower from 100 percent to approximately 35 percent power on April 15*The subsequent return to full power on April 16Documents reviewed are listed in the Attachment.

b. Findings

No findings of significance were identified.

1R15 Operability Evaluations

a. Inspection Scope

The inspectors reviewed the two operability determinations listed below. The inspectorsassessed the accuracy of the evaluations, the use and control of any necessary compensatory measures, and compliance with the TS. The inspectors verified that the operability determinations were made as specified by Procedure PLP-102, "OperabilityDeterminations." The inspectors compared the justifications provided in the determinations to the requirements from the TS, the UFSAR, and associated design-8Enclosurebasis documents to verify that operability was properly justified and the subjectcomponents or systems remained available, such that no unrecognized increase in riskoccurred:*Operability Condition Review 189410, Small Leak and Associated CondensationIssuing from C Steam Generator Secondary Side Manway *Engineering Disposition 64041, [Water Cooled Condensing Unit]-1A Flooded Starts Documents reviewed are listed in the Attachment.

b. Findings

No findings of significance were identified.

1R19 Post Maintenance Testing

a. Inspection Scope

For the five post-maintenance tests listed below, the inspectors witnessed the testand/or reviewed the test data to verify that test results adequately demonstratedrestoration of the affected safety functions described in the UFSAR and TS. Documents reviewed are listed in the Attachment.The following tests were witnessed/reviewed:

Test ProcedureTitleRelated Maintenance ActivityOST-302-2Service Water PumpsImpeller clearanceC and D Inserviceadjustment and Testbreaker maintenanceMST-0304 KV Undervoltage toReplacement of the 4Reactor ProtectionKV bus 4 undervoltage testing relay,and the associated reactor protection train A logic and test relaysOST-401-2Emergency DieselReplacement of the solenoid coilsGenerator B Slowfor the air start valvesOP-903Service WaterBreaker inspection for D SW waterpumpOST-201-2Motor Drive AuxiliaryCalibration B AFW pump discharge Feedwater Systempressure switches Component Test -

9EnclosureTrain B

b. Findings

No findings of significance were identified.

1R22 Surveillance Testing

a. Inspection Scope

For the six surveillance tests listed below, the inspectors witnessed testing and/orreviewed the test data to verify that the SSC involved in these tests satisfied the requirements described in the TS, the UFSAR, and applicable licensee procedures, and that the tests demonstrated that the SSCs were capable of performing their intendedsafety functions. Documents reviewed are listed in the Attachment.Test ProcedureTitleOST-202*Steam Driven Auxiliary Feedwater System Component TestOST-051**Reactor Coolant System Leakage Evaluation OST-902Containment Fan Coolers Component Test MST-902A and B Station Battery Test OST-252-2RHR System Valve Test - Train BOST-924-1Area Radiation Monitoring System (Quarterly) [for R2,Containment Area Monitor]*This procedure included inservice testing requirements.** This procedure included testing of a large containment isolation valve.

b. Findings

No findings of significance were identified.

1R23 Temporary Plant Modifications

a. Inspection Scope

The inspectors reviewed two temporary modifications described in the Engineeringchanges (ECs) listed below to verify that the modifications did not affect the safety functions of important safety systems, and to verify that the modifications satisfied therequirements of 10 CFR 50, Appendix B, Criterion III, Design Control.EC 63769, C Steam Generator Secondary Manway Leak Repair EC 63967, Recorder Installation to Monitor PC-951B [Containment Pressure]Documents reviewed are listed in the Attachment.

b. Findings

No findings of significance were identified.2.RADIATION SAFETYCornerstones: Occupational Radiation Safety (OS) and Public Radiation Safety (PS)2OS1Access Control to Radiologically Significant Areas

a. Inspection Scope

Access Controls. The inspectors evaluated the licensee's procedures for posting,surveying, and controlling access to airborne radioactivity areas, radiation areas, highradiation areas (HRA), and very HRAs, against the requirements of 10 CFR Part 20.

During plant walk-downs and radiation work permit (RWP) reviews, the inspectors evaluated radiological postings and barricades against the current radiation surveys for areas in the auxiliary buildings, and the independent spent fuel storage installation(ISFSI) to verify that the established radiological controls were appropriate. In addition, the inspectors independently verified the dose rates recorded on current survey maps at various locations in plant areas, including the ISFSI. General area dose rates and contamination levels were compared to licensee survey records. The inspectors observed Health Physics (HP) technician proficiency in performing and documenting the radiation surveys for radiological work areas.RWPs used to access radiation areas, HRAs, and very HRAs were evaluated to verifythat the licensee was establishing appropriate radiation protection (RP) controls forthose areas. The inspectors evaluated the method for establishing dose alarms and dose rate alarm set-points to verify that it was based on knowledge of the radiological conditions of the work areas and job activities. Radiological workers were questioned by the inspectors to verify that they knew their dosimeter alarm set-points and theirrequired response when they alarmed.During the inspection there were no airborne areas with the potential for individualradiation workers to exceed an internal dose greater than 50 mem. CEDE (20 DAC-Hours). However, the inspectors were able to evaluate the usage of engineering controls such as high efficiency particulate air filters to control potential airborne releases by reviewing surveys and pictures of work areas.The inspectors reviewed the spent fuel pool (SFP) area to verify that there were no toolsor equipment tied on rails surrounding the SFP, and that the licensee maintained an inventory of all materials stored in the SFP.Access controls for locked HRAs were reviewed and discussed with RP managementand supervision. The inspectors checked designated locked door locations and reviewed documentation to verify the condition and status of the locked doors. The 11Enclosureinspectors also evaluated implementation of key controls and postings for very HRAsand locked HRAs.The inspectors reviewed the qualifications of the recently appointed Superintendent,Radiation Control (RC), and the RC Supervisors. This was accomplished by interviewing the individuals and reviewing their resumes. In addition, the inspectors interviewed occupational radiation workers, HP personnel and line supervisors, and assessed their knowledge of occupational radiation safety.The RP program activities and their implementation were evaluated against applicablerequirements of 10 CFR Part 19 - Notices, Instructions And Reports To Workers and 10 CFR Part 20 - Standards for Protection Against Radiation. Additionally, the following TS requirements were used in the review of access controls to radiological significant areas: Section 5.3, Unit Staff Qualifications; Section 5.4, Procedures; and Section 5.7,High Radiation Areas. Procedures and records reviewed within this inspection area are listed in the Attachment.Problem Identification and Resolution. Access control issues identified through thelicensee's self-assessments and corrective action program (CAP) were reviewed and discussed with cognizant licensee representatives. The inspectors assessed the licensee's ability to characterize, prioritize, and resolve the issues identified in the RPprogram area in accordance with Procedure CAP-NGGC-0200, Corrective Action Program, Revision (Rev.) 16, and Procedure CAP-NGGC-0205, Significant Adverse Condition Investigations, Rev. 4. The specific records, procedures, and documentation reviewed are identified in the Attachment.The inspectors completed 21 of the required 21 samples for Inspection Procedure (IP)71121.01. All samples have now been completed for this IP.b. FindingsIntroduction A Green NRC-identified NCV of TS 5.3.1 was identified for failure toensure the Manager of the Radiation Control function (referred to as the 'SuperintendentRP') met the minimum qualification requirements specified in ANSI/ANS 3.1-1981, American National Standard for Selection, Qualification, and Training of Personnel for Nuclear Power Plants. The individual who was selected for this position did not have professional RP experience required by ANSI/ANS 3.1. Description The Superintendent RP, at the time of the inspection (June 2006), hadbeen in the position since December 2005. The qualification requirements for this position are specified in TS 5.3.1 which states that the manager of the radiation controlfunction shall meet or exceed the minimum qualifications of ANSI/ANS 3.1. After comparing the specific requirements of ANSI/ ANS 3.1 to the work history listed on the new Superintendent's resume, the inspectors questioned whether the minimum qualification requirements were satisfied. The inspectors held subsequent discussions with the licensee to better understand the individual's work history and to evaluate the licensee's rationale used when selecting the individual for this position. Based on this 12Enclosurereview, the inspectors determined that the Superintendent RP did not meet the minimumqualification requirements of ANSI/ANS 3.1 - 1981.The specific requirements of ANSI/ANS 3.1 that were not satisfied at the time theindividual was selected for the Superintendent RP position included: 1) At least four years of experience in applied RP of which at least three years of this experience shall be in applied RP work in a nuclear facility dealing with radiological problems similar tothose encountered in nuclear power plants preferably in a nuclear power plant; and 2)

During the three years, the individual shall participate in the RP section of an operating nuclear power plant during a routine refueling outage (one or two months) and during two months operation above 20 percent power. At the time of the inspection, however,the Superintendent RP had satisfied the requirements involving a routine refuelingoutage and plant operation above 20 percent power. Analysis The failure to comply with TS 5.3.1 with regard to the qualifications of theSuperintendent RP is a performance deficiency. It was within the licensee's ability toensure the individual's work history and experience meets the minimum qualification requirements prior to selection. This violation is greater than minor because it is associated with the program andprocess attribute of both the Occupational and Public Radiation Safety Cornerstonesand adversely affects the cornerstone objectives of ensuring adequate protection of both the worker and public health and safety from exposure to radiation from radioactive material during routine civilian nuclear reactor operation. Failure to have a fully qualified Superintendent RP could adversely impact the radiation protection organization's effectiveness. This finding was evaluated using the Occupational Radiation SDP. The finding was determined to be of very low safety significance (Green) because there were experienced supervisors in the RP organization who met the minimum qualifications of ANSI/ANS 3.1 and these supervisors provided advise and assistance to the Superintendent. In addition, using the SDP flow chart the finding was determined to be Green because it was not an ALARA finding, it did not involve an overexposure, did not involve a substantial potential for overexposure, and the licensee's ability to assess dosewas not compromised. The same Green determination resulted when using the Public Radiation Safety SDP flow chart. Enforcement TS 5.3.1 requires that the Manager of the Radiation Control function shallmeet or exceed the minimum qualifications of ANSI/ANS 3.1 - 1981. Paragraph 4.4.4 ofANSI/ANS 3.1 specifies the Radiation Protection group leaders' qualification requirements and states that the individual shall have at least four years of experiencein applied radiation protection of which at least three years of this experience shall be in applied RP work in a nuclear facility dealing with radiological problems similar to thoseencountered in nuclear power plants, preferably in a nuclear power plant. In addition during the three years of experience, the individual shall participate in the RP section of an operating nuclear power plant during a routine refueling outage (one or two months)and during two months operation above 20 percent power.

13EnclosureContrary to the above, the individual who was selected for the Manager of RadiationControls functions in December 2005 did not have four years of experience in applied radiation protection. At the time of selection the individual also did not meet therequirement of having participated in the RP section of an operating nuclear power plant during a routine refueling outage (one or two months) and during two months operation above 20 percent power. This portion of ANSI/ANS 3.1 had been satisfied at the time of the inspection (June 2006). Because the failure to meet TS 5.3.1 was determined to be of very low safety significance and was entered into the licensee's corrective action program as ARs 187587 and 196260, the violation is being treated as an NCV, consistent with Section VI.A of the NRC Enforcement Policy: NCV 50-261/2006003-XX,Failure to Meet Technical Specification Requirements for Radiation Protection Manager Qualification. 2OS2 ALARA Planning and Controlsa.Inspection ScopeAs Low As Reasonably Achievable (ALARA). The inspectors evaluated ALARAprogram guidance and its implementation for refueling outage (RFO) 23, which occurred during the period of September 17 - October 25, 2005. The inspectors reviewed, anddiscussed with licensee staff, ALARA work plan (AWP) documents including dose estimates and prescribed ALARA controls for selected outage work activities that incurred significant collective doses. The inspectors reviewed the implementation of dose-reduction initiatives for high person-rem expenditure ta sks and assessed theeffectiveness of source-term reduction efforts. These elements of the ALARA program were evaluated for consistency with the methods and practices delineated in applicable licensee procedures.Projected AWP dose expenditure estimates were compared to actual doseexpenditures, and noted differences were discussed with cognizant ALARA staff.

Changes to dose budgets relative to changes in job scope also were identified and discussed.Implementation and effectiveness of selected program initiatives with respect to source-term reduction were evaluated. Shutdown chemistry program actions and cleanup initiatives, and their resultant effect on containment and auxiliary building area andequipment dose rate trending data were reviewed and compared to previous refueling outage data. Cobalt reduction initiatives for reactor coolant system valve replacementactivities were reviewed and discussed with licensee ALARA staff.The plant collective exposure histories for calendar years (CYs) 2004 and 2005, basedon the data reported to the NRC pursuant to 10 CFR 20.2206, were reviewed anddiscussed with licensee staff, as were established goals for reducing collective exposure.

14EnclosureALARA program activities and their implementation were evaluated against 10 CFR19.12; 10 CFR Part 20, Subparts B, C, F, G, H, and J; and approved licensee procedures. In addition, licensee performance was evaluated against Regulatory Guide 8.8, Information Relevant to Ensuring that Occupational Radiation Exposures at NuclearPower Stations will be As Low As Reasonably Achievable. Procedures and recordsreviewed within this inspection area are listed in the Attachment.Problem Identification and Resolution. Licensee CAP documents associated withALARA activities were reviewed and assessed. The inspectors evaluated the licensee's ability to identify, characterize, prioritize, and resolve issues in accordance withcorrective action program requirements. Specific assessments, audits, and AR documents reviewed and evaluated in detail for this inspection area are identified in the

. The inspectors completed 16 of the required 29 samples for IP 71121.02.b.FindingsNo findings of significance were identified.2PS2Radioactive Material Processing and Transportation

a. Inspection Scope

Waste Processing and Characterization. The inspectors evaluated licensee proceduresfor processing and characterizing radioactive waste (radwaste). Inspection activities included direct observation of processing equipment for solid and liquid radwaste and evaluation of waste stream characterization data.Solid and liquid radwaste equipment was inspected for material condition andconfiguration. The configurations were compared with the UFSAR and with the Process Control Program (PCP) requirements. Inspected equipment included liquid radwaste hold-up tanks; resin transfer piping; abandoned waste evaporators; and vendor liquid radwaste processi ng system. The inspectors discussed system changes and operabilitystatus with cognizant licensee representatives. Licensee procedures for resin transfer, collection and packaging were evaluated. Licensee radionuclide characterizations for selected waste streams were reviewed anddiscussed with the radwaste staff. The Inspectors evaluated the analyses for hard-to-detect nuclides for the various waste streams including primary resin, filters and dry active waste. The analysis results were compared to the data contained in the plants Annual Radiological Operating Report and to selected shipping records to verify that appropriate scaling factors were being applied. The inspectors interviewed plant radwaste staff and reviewed procedural guidance to evaluate the licensee's program for monitoring changing operational parameters.Radwaste processing activities were reviewed for consistency with the licensee's PCP,Rev. 5; and UFSAR, Chapter 11, Amendment 19. Waste stream characterization analyses were reviewed against regulations detailed in 10 CFR Part 61.55 and guidance 15Enclosureprovided in the Branch Technical Position on Waste Classification and Waste Form,1983. Reviewed documents are listed in the Attachment.Transportation. The inspectors evaluated the licensee's activities related totransportation of radioactive material. The evaluation included direct observation of shipment preparation activities and review of shipping related documents.At the time of the inspection, the licensee made only one shipment that was directlyobserved by the inspectors. The shipment was an excepted package of limited quantity containing RST-004 leak check smears. As part of the document review, the inspectors reviewed shipping documents for selected shipments and discussed those records with cognizant radwaste personnel. The inspectors evaluated the shipping records for consistency with licensee procedures and compliance with NRC and DOTregulations. In addition, training records for selected individuals currently qualified to ship radioactive material were checked for completeness, and the training curriculum developed for these workers was evaluated.Transportation program implementation was reviewed against regulations detailed in10 CFR Parts 20 and 71, 49 CFR Parts 170-189; as well as the guidance provided in NUREG-1608. Training activities were assessed against 49 CFR Part 172 Subpart H.Problem Identification and Resolution. Selected ARs associated with radwasteprocessing and transportation were reviewed. The inspectors assessed the licensee's ability to characterize, prioritize, and resolve the identified issues in accordance withprocedure CAP-NGGC-0200, Corrective Action Program, Rev. 16. Reviewed documents are listed in Section 2PS2 of the report Attachment.The inspectors completed 6 of the required 6 samples for Inspection Procedure (IP)71122.02.

b. Findings

No findings of significance were identified.4.OTHER ACTIVITIES 4OA1Performance Indicator (PI) Verification

a. Inspection Scope

The inspectors verified the PIs identified below. For each PI, the inspectors verified theaccuracy of the PI data that had been previously reported to the NRC by comparing thatdata to the actual data. The inspectors also compared the basis for reporting each dataelement to the PI definitions and guidance contained in NEI 99-02, "Regulatory Assessment Indicator Guideline," Rev. 2. In addition, the inspectors interviewed licensee personnel associated with collecting, evaluating, and distributing this data.

16EnclosureBarrier Integrity Cornerstone*Reactor Coolant System Specific Activity PIThe inspectors observed sampling and analysis of a reactor coolant system sample,and compared the reported performance indicator data with records developed by the licensee while analyzing previous samples, for the period from the fourth quarter of 2004 through the fourth quarter of 2005.*Reactor Coolant System Leak Rate PIThe inspectors observed a reactor coolant system leakage evaluation, and reviewedrecords of daily measures of reactor cool ant system identified leakage, for the periodfrom the fourth quarter of 2004 through the fourth quarter of 2005.Occupational Radiation Safety (OS) Cornerstone*Occupational Exposure Control Effectiveness PI The inspectors reviewed data collected from October 2005 through May 2006, andreviewed the licensee's procedure for reporting PI data to the NRC, RegulatoryNuclear Generation Group Corporate Procedure - 0009, NRC PerformanceIndicators, Rev. 5, as well as records relevant to this PI. Specifically, the inspectorsreviewed selected corrective action issues and individual RCA exit transactions with ED readings exceeding 100 millirem to assess reporting data for potential unplannedexposures and RCA exit transactions which resulted in dose rate alarm activation to evaluate entries where dose rates were higher than expected. Reviewed documentsrelative to this PI are listed in the Attachment.Public Radiation Safety (PS) Cornerstone*Radiological Effluent Technical Specification/Offsite Dose Calculation ManualRadiological Effluent Occurrences PI The inspectors reviewed a listing of radiological effluent related corrective actionprogram records generated from October 2005 through May 2006 and the most recent annual radioactive effluent release report to verify that radiological effluent release occurrences were properly classified. In addition, licensee procedural guidance for classifying and reporting PI events was evaluated. Reviewed documents are listed in the Attachment.

17EnclosureThe inspectors completed two of the required samples for IP 71151, one sample for theOS PI and one sample for the PS PI.

b. Findings

No findings of significance were identified.4OA2Identification and Resolution of Problems.1Routine Review of ARsTo aid in the identification of repetitive equipment failures or specific humanperformance issues for followup, the inspectors performed frequent screening of items entered into the CAP. The review was accomplished by reviewing daily ARs..2Annual Sample Review

a. Inspection Scope

The inspectors selected AR 157793, [Nuclear Assessment Section] MaintenanceAssessment Issue #2 (R-MA-05-01-I2) for detailed review. The inspectors selected this AR because it related generally to the cross-cutting area of human performance. The inspectors reviewed this report to verify:*complete and accurate identification of the problem in a timely manner;*evaluation and disposition of performance issues;

  • evaluation and disposition of operability and reportability issues;*consideration of extent of condition, generic implications, common cause, andprevious occurrences;*appropriate classification and prioritization of the problem;
  • identification of root and contributing causes of the problem;*identification of corrective actions which were appropriately focused to correct theproblem; and*completion of corrective actions in a timely manner.The inspectors also reviewed this AR to verify compliance with the requirements of theCAP as delineated in Procedure CAP-NGGC-0200, Corrective Action Program, and 10 CFR 50, Appendix B. Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings of significance were identified.

18Enclosure.3Semi-Annual Trend Review

a. Inspection Scope

The inspectors performed a review of the CAP and associated documents to identifytrends that could indicate the existence of a more significant safety issue. The inspector's review focused on repetitive equipment issues, but also considered the results of daily inspector CAP item screening discussed in Section 4OA2.1, licensee trending efforts, and licensee human performance results. The inspector's review nominally considered the six month period of January through June 2006, although some examples expanded beyond those dates when the scope of the trend warranted. The review included issues documented outside the normal CAP in major equipment problem lists, repetitive and/or rework maintenance lists, departmental problem/challenges lists, system health reports, quality assurance audit/surveillancereports, self assessment reports, and Maintenance Rule assessments. The inspectors compared and contrasted their results with the results contained in the latest monthlyand quarterly trend reports. Corrective actions associated with a sample of the issues identified in the trend reports were reviewed for adequacy. The specific documents reviewed are listed in the Attachment.The inspectors also evaluated the trend reports against the requirements of the CAP asspecified in 10 CFR 50, Appendix B, Criterion XVI, and in Procedures CAP-NGGC-0200, Corrective Action Program, CAP-NGGC-0206, Corrective Action Program Trending and

Analysis.

b.Assessment and ObservationsNo findings of significance were identified. The inspectors evaluated trendingmethodology and observed that the licensee had performed a detailed review. The licensee routinely reviewed cause codes, involved organizations, key words, and systemlinks to identify potential trends in their CAP data. The inspectors compared the licensee process results with the results of the inspectors' daily screening, and did not identify any discrepancies or potential trends in the CAP data that the licensee hadfailed to identify.4OA5ISFSI

a. Inspection Scope

The inspectors reviewed the status and surveillances of the horizontal ISFSIs. Theinspectors reviewed alpha, beta, gamma, and neutron surveys that were performed during the dry cask storage campaigns conducted between August 5 - September 2, 2005. The surveys included surveys of the cask, transfer cask, cask preparation area, SFP and ISFSI final surveys after cask placement. The reviewed items included RP shift turnover logs for each shift from August 2 to September 2, 2005, area quarterly thermo-luminescence device results from April 2005 through April 2006, cask certificate 19Enclosureof compliance and TS. The inspectors walked down the facilities and performedboundary verification surveys for the ISFSIs.

b. Findings

No findings of significance were identified.4OA6MeetingsOn July 12, 2006, the resident inspectors presented the inspection results to Mr. TomWalt and other members of his staff. The inspectors confirmed that proprietary information was not provided or examined during the inspection.Attachment: Supplemental Information

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

C. Church, Operations Manager
E. Kapopoulos, Engineering Manager
E. Caba, Engineering Superintendent
B. Clark, Nuclear Assurance Manager
J. Huegel, Maintenance Manager
W. Noll, Director of Site Operations
D. Blackeney, Outage and Scheduling Manager
D. Stoddard, Plant General Manager
W. Farmer, Engineering Superintendent
J. Lucas, Manager, Support Services - Nuclear
T. Walt, Vice President, Robinson Nuclear Plant
T. Tovar, Radiation Protection Superintendent
S. Wheeler, Supervisor, Regulatory Support
G. Ludlum, Training ManagerNRC pers onnel
P. Fredrickson, Chief, Reactor Projects Branch 4

A-2

LIST OF ITEMS

OPENED, CLOSED

AND DISCUSSED

Opened

NoneOpened and

Closed

05000261/2006003,NCV,Failure to Meet Technical Specification Requirements forRadiation Protection Manager Qualification (Section 2OS1).ClosedNone

Discussed

None

A-3

LIST OF DOCUMENTS REVIEWED

1R01Adverse Weather ProtectionProcedures, Rev. 281R04Equipment AlignmentPartial System WalkdownSteam Driven Auxiliary Feedwater Train:Drawing G-190197, Feedwater, Condensate and Air Evacuation System Flow Diagram, Sheet 1of 4, Rev. 75Drawing G-190197, Feedwater, Condensate and Air Evacuation System Flow Diagram, Sheet 4of 4, Rev. 55Clearance Order Checklist

112948, Steam Driven Auxiliary Feedwater PumpService Water Train A:Clearance Order Checklist
111512, Inspection and Testing of 52/CB-1 and 52/CB-2 (ServiceWater Pump D)Operating Procedure,
OP-903 Service Water System, Rev. 96Emergency Diesel Generator system:Drawing G-190204-A, Emergency Diesel Generator System Flow Diagram, Rev. 181R05Fire ProtectionUFSAR Sections3.1.5.5, Fire Zone 19 - Unit 2 Cable Spreading Room3.1.5.6, Fire Zone 20 - Emergency Switchgear Room and Electrical Equipment Area