| | U.S. NUCLEAR REGULATORY COMMISSION |
| | |
| | ==REGION I== |
| | Report N /86-22 Docket N License N CPPR-120 Category B |
| | ! |
| | Licensee: Public Service Electric and Gas Company 80 Park plaza - 17C Newark, New Jersey 07101 Facility Name: Hope Creek Generating Station Unit, 1 Inspection At: Hancocks Bridge, New Jersey Inspection Conducted: March 31, 1986-April 11, 1986 Inspectors h L. Briggs ad eactor ngineer 5 .3 |
| | ' dat'e |
| | [ |
| | |
| | L.~ Wink Reac Engineer ' |
| | date T E'rell, Re to Engin r shiln/ ddti Approved by: , J Y selgroth , |
| | ~ |
| | . lef |
| | ' |
| | dite Test Progra Section, OB, DRS Inspection Summary: Inspection on March 31, 1986 - April 11, 1986 (Inspection Report No. 50-354/86-22) |
| | Areas Inspected: Routine unannounced inspection by three region-based inspec-tors of licensee actions on previous inspection findings, Technical Specifi-cation surveillances for operational condition 5, power ascension test program, preoperational, detailed and surveillance test results evaluation review, pre-operational retest witnessing, QA/QC interfaces, independent verification and plant tour Results: No violations were identifie NOTE: For acronyms not defined refer to NUREG-0544 " Handbook of Acronyms and Initialims." |
| | |
| | . |
| | ! 8606090301 860602 ' |
| | $DR ADOCK 05000354 PDR |
| | - -- - -- - |
| | _ - . ~ . - - -- . . - . - |
| | |
| | . |
| | . |
| | DETAILS 1.0 Persons Contacted Public Service Electric and Gas (PSE&G) Personnel and Contractors G. Chew, Power Ascension Technical Support |
| | #G. Connor, Operations Manager G. Daves, Senior Engineer-Operations |
| | *R. Donges, Lead QA Engineer |
| | *#M. Farschon, Power Ascension Manager B. Forward, Power Ascension Administration |
| | #S. Funsten, I&C Engineer |
| | *#R. Griffith, Principal QA Engineer |
| | *#P. Krishna, Assistant to General Manager-Hope Creek Operations |
| | #P. Kudless, Maintenance Manager |
| | *#S. LaBruna, Assistant General Manager |
| | #J. Lovell, Radiation Protection / Chemistry Manager |
| | ' |
| | *C. McNeill, Jr. , Vice President-Nuclear |
| | *#M. Metcalf, Principal QA Engineer J. Montgomery, Maintenance Technical Specification Coordinator C. Moore, Startup Test Engineer L. Rice, I&C Work Order Planner E. Rush, I&C Technical Specification Coordinator W. Ryder, Operations Technical Specification Coordinator |
| | *#R. Salvesen, General Manager, Hope Creek Operations W. Schell, Power Ascension Technical Director T. Szumski, Power Ascension Engineer S. Tanner, I&C Engineer U. S. Nuclear Regulatory Commission |
| | *D. Allsopp, Resident Inspector |
| | *R. Borchardt, Senior Resident Inspector |
| | *J. Lyash, Reactor Engineer The inspection also contacted other members of the licensee staff includ-ing senior nuclear shift supervisors, reactor operators, test engineers and members of the technical staf * Denotes those present at the interim exit meeting on [[Exit meeting date::April 4, 1986]]. |
| | # Denotes those present at toe final exit meeting on [[Exit meeting date::April 11, 1986]]. |
| | 2.0 Licensee Actions on Previous Inspection Findings (Closed) Unresolved Item (354/86-12-01). Licensee to modify and re-test nuclear steam supply shutoff system manual initiation pushbuttons (B21H-S28A, B, C and D) to close test exception SDR-SM-0086. |
| | |
| | - |
| | |
| | __ __ _ .. |
| | . |
| | ? |
| | , |
| | |
| | . |
| | |
| | , |
| | ; |
| | The inspector reviewed the completed re-test package (TPR: SME-0025) and verified that the appropriate modifications had been made and the push-button re-tested. The inspector questioned the startup test engineer to insure that the scope of the re-test was adequate to assure the proper i functioning of the pushbuttons. |
| | |
| | . |
| | This item is close (Closed) Unresolved Item (354/86-21-01) Determination of acceptability of surveillance test-OP-ST.KJ-005 (006, 007 and 008)(Q) to satisfy preopera-tional test requirements. During results review / evaluation of preopera-tional test procedure (PTP)-BB-3(A), Standby Diesel Generator Loading, and PTP-BB-3(B), ECCS Integrated Initiation / Loss of Offsite Power, the inspec- |
| | , |
| | |
| | tor determined that integrated system performance had not been fully demon-strated. During this inspection the inspector reviewed surveillance test i OP-ST.KJ-005,(006, 007 and 008)(Q), Integrated Emergency Diesel Generator I 1AG400 (IBG400, ICG400 and IDG400) Test - 18 months. The inspector deter-mined that satisfactory performance of the surveillanc- "est would demon- |
| | . |
| | strate proper performance of each emergency diesel g" ttor (EDG) and its |
| | , associated electrical bus. On April 2, 1986 the inst ars observed per- |
| | ; formance of portions of OP-ST.KJ-007 (Q)('C'EDG). Th< ..ocedure was stop-f ped by the licensee when the Residual Heat Removal (RhR) pump did not start |
| | * |
| | during the initiation sequenc That portion of the test was satisfactori-i ly completed later during the 11 p.m. to 7 a.m. shift when an incorrect j test connection not noted in the test was discovered and corrected. One j hardware problem was identified by the inspectors when it was noted that the Logic Out of Service annunciator for the 'C' RHR pump was not energized as required by the procedure. This item is being investigated by the 11-a censee and being followed by the resident inspector. |
| | |
| | , |
| | On April 9 and 10, 1986 the inspector reviewed the results of the 18 month surveillance tests performed on the A, B and C EDG's with a licensee re- |
| | |
| | presentative. All data were acceptable, with c.,1y the annunciator problem discussed above remaining unanswered. |
| | |
| | ! |
| | This item is closed. |
| | |
| | ' |
| | 3.0 Power Ascension Test Program (PATP) |
| | ! |
| | , |
| | 3.1 References j * Regulatory Guide 1.68, Revision 2, August 1978, " Initial Test Programs for Water-Cooled Nuclear Power Plants" |
| | * ANSI N18.7 - 1976, " Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants" l |
| | , |
| | l l |
| | l l |
| | l |
| | |
| | - . _ |
| | -- -. - - - . - __ -. -- |
| | . . |
| | - |
| | , |
| | |
| | , |
| | * Hope Creek Generating Station (HCGS) Technical Specifications, l Proof and Review Copy l * HCGS Safety Evaluation Report, Chapter 14, " Initial Test |
| | ; Program" |
| | |
| | ; * Station Administrative Procedure, SA-AP.ZZ-036, Revision 1, |
| | ' |
| | " Phase III Startup Test Program" i * |
| | Specification NE80 23A4137, Revision 0, " Hope Creek Startup Test |
| | , |
| | Specification" |
| | * |
| | * HCGS Power Ascension Test Matrix, Revision 3 j 3.2 Overall Power Ascension Test Program (PATP) |
| | i Discussion |
| | ^ |
| | The inspector met with the Power Ascension Manager and members of his staff to discuss the overall readiness of the program, status of training activities and progress on procedure review and revision Based on these discussions, and the procedure reviews discussed in r |
| | paragraph 3.3 below, the inspector was satisfied that the Power Ascen- |
| | ! |
| | * sion Test Program was adequately prepared to support fuel loading and iow power testing. Training on Power Ascension Test Procedures, in-1 cluding an integrated " dry run" of the fuel loading procedures, has i been completed satisfactorily. The Technical Review Board, utilized j ' |
| | to improve the quality of the PATP procedures, has completed its re-view of the fuel loading and low power testing procedures and appro- |
| | ; |
| | , |
| | priate revisions are being made. |
| | |
| | ; 3.3 Power Ascension Test Procedure Review |
| | |
| | i Scope l The Power Ascension Test Procedures discussed below were reviewed j for their conformance to the requirements and guidelines of the |
| | ! references listed in paragraph 3.1 and for the attributes previously |
| | |
| | defined in Inspection Report 50-354/86-03. In addition, the resi- |
| | ' |
| | ; sions reviewed were verified to adequately address the concerns identified in Inspection Report 50-354/86-0 Discussion i |
| | ! |
| | Initial Fuel Loading |
| | ! |
| | The inspector reviewed the approved revision to the fuel loading |
| | ] test procedure (TE-SU.KE-032, Revision 1) in Jetail and verified i |
| | ' |
| | that it was in conformance with the Regulatory Guide and FSAR commitments and that it would provide a technically adequate basis l |
| | ! |
| | |
| | - - - - - - -- -. . . - - - . = - |
| | . |
| | t . |
| | |
| | J for safely conducting the initial fuel loading. -It was also deter-mined that all the inspector's concerns identified in an earlier l inspection had been adequately addressed in this revisio Initial Criticality / Full Core Shutdown Margin Demonstration The inspector reviewed the approved revision to the power ascension test procedure, TE-SU.ZZ-041, Revision 1, Full Core Shutdown Margin |
| | * |
| | Demonstration, in detai The inspector determined that the proce-dure was in conformance with the Regulatory Guide and FSAR commit - |
| | ments and that it was adequate to ensure that the initial approach to i |
| | criticality would be conducted in a deliberate and orderly manne ! In addition, the procedural deficiencies identified as a violation (86-03-03) in a previous inspection report had been adequately addressed in this revisio Findings |
| | ; Within the scope of the inspection, no violations were identified. |
| | |
| | j 4.0 Technical Specification Surveillances For Operational Condition 5 |
| | * |
| | 4.1 Scope |
| | . |
| | Tne licensee's surveillance activities were monitored to insure that technical specification surveillance requirements were being adequate-ly met. The inspector also reviewed selected surveillance procedures to verify that they were consistent with the final draft of the faci-lity's Technical Specifications. |
| | |
| | ; |
| | 4.2 Discussion |
| | : The surveillance procedures listed in Attachment A were reviewed to insure conformance with the final draft Technical Specifications and for technical adequacy. Minor concerns identified by the inspector |
| | ; were all resolved through discussions with the appropriate work group technical specification coordinators. |
| | |
| | ' |
| | The inspector reviewed the completed technical specification surveil- |
| | ^ lances listed in Attachment B to insure that all appropriate accept- |
| | ' |
| | ance criteria were satisfied. In addition, the inspector verified through a 20% sample, that all I&C surveillances that were logged as completed, had been properly reviewed and filed and the surveillance J |
| | i results were retrievable for review. |
| | |
| | $ |
| | l |
| | } |
| | } |
| | ! |
| | : |
| | |
| | . |
| | - |
| | |
| | 4.3 Test Witnessed The following two surveillance tests were witnessed by the inspector: |
| | IC-FT-BF-001, Revision 2, Scram Discharge Volume High Water Level 0P-ST.KE-001, Revision 3, Refuel Interlock Operability Functional Test In addition the training and qualifications of those refueling bridge operators, which will be used for the initial fuel load, were reviewe Discussions were also held with QA to determine their involvement with the refueling operator training and qualification progra .4 Findings Within the scope of the inspection, no violations were identifie .0 Preoperational Test Retest Witnessing 5.1 Scope Testing witnessed by the inspector included the observations of overall crew performance stated in Paragraph 3.0 of Inspection Report 50-354/85-1 .2 Discussion During this inspection the inspector noted several preoperational test retests being conducted to clear test exceptions. Among those observed were: |
| | -- |
| | Test Package Release (TPR) GSC-0412 and GTI-28C-6032, Opera-tion / Maintenance Instruction for Containment 2H and 02 Analyzer Systems |
| | -- |
| | PTP-BB-3 Part B, Retest No. 1, Check of Control Room Emergency Filter Unit, and |
| | -- |
| | PTP-GM-1, 50R-GM-443, Retest of AP414 and BP41 The inspector observed that testing was being conducted in accordance with written procedures and satisfied the criteria referenced in Paragraph 5.1 above. |
| | |
| | . - - _ - - - _ _ _ _ - _ _ _ _ - _ _ _ - . _ _ _ _ - .-_ |
| | |
| | .- . . - - _ - . - . . - .- |
| | . |
| | l* 7 6.0 Preoperational, Detailed and Surveillance Test Results Evaluation Review 6.1 Scope The completed test procedures listed below were reviewed during this inspection to verify that adequate testing has been conducted to sa-tisfy regulatory guidance, licensee commitments and FSAR requirements I and to verify that uniform criteria were being applied for evaluation of completed test results in order to assure technical and administra-tive adequacy. |
| | |
| | J The inspector reviewed the test results and verified the licensee's evaluation of test results by review of test changes, test exception, test deficiencies, "As-Run" copy of the test procedure, acceptance criteria, performance verification, recording conduct of test, QC j inspection records, restoration of system to normal after test, j independent verification of critical steps or parameters, identifi- |
| | ; cation of personnel conducting and evaluating test data, and veri-j |
| | . |
| | fication that the test results have been approved. |
| | |
| | ! |
| | -- |
| | PTP-KL-1, Primary Containment Instrument Gas, Revision 0, |
| | { results licensee approved on March 18, 1986, |
| | |
| | ! -- |
| | PTP-SB-2, Response Time Testing, Revision 0, results licensee i approved on April 3, 1986, i |
| | ! -- |
| | DTP-SB-0001, Recirculation Pump Trip Breaker Interrupt Time, |
| | ! Revision 0, results licensee approved on March 27, 1986, |
| | ; |
| | i -- |
| | DTP-SB-0002, Turbine Stop Valve / Recirculation Pump Trip Response Time and RPS Trip Response Time, Revision 0, results |
| | , |
| | licensee approved on March 27, 1986, |
| | -- |
| | DTP-SB-0003, Turbine Controi Valve Fast Closure / Recirculation l Pump Breaker Trip and RPS Trip Response Time, Revision 0, i results licensee' approved on March 27, 1986, and I -- |
| | OP-ST.KJ-005 (006 and 007) (Q) Integrated Emergency Diesel |
| | : Generator 1AG400 (IBG400 and ICG400) Test-18 months, Revision 0, |
| | } Discussed in Paragraph 2.0.of this report. |
| | |
| | ] 6.2 Discussion i |
| | ; During review of PTP-KL-1 the inspector noted that air quality |
| | ! samples were taken at the containment instrument gas system receiver |
| | ! drain valves and analyzed for 3.0 micrometer particle size. The |
| | , inspector questioned why air quality samples had not been obtained |
| | ! at the end of the feeder lines as suggested by Regulatory Guide 1.68.3, Preoperational Testing of Instrument and Control. Air Systems. |
| | |
| | ] |
| | . |
| | |
| | ! |
| | ! |
| | ! |
| | l.- . - _ - - -. - _ ._ - , , . - _ - , , , . . , - . , . . -, , , ... ,.-.- ,-.- ,. - |
| | |
| | _ _ _ _ _ |
| | . |
| | * |
| | |
| | The licensee noted that a satisfactory flush had been previously con-ducted using General Test Procedure (GTP)-1, General Flushing and Cleaning Procedure. The inspector stated that GTP-1 flush samples method would not be able to detect 3.0 micrometer particles and could not verify system cleanlines The licensee agreed and stated that further sampling would be performed to verify particle siz If par-ticle size criteria are exceeded further action will be taken to re-solve the issue and ensure that air quality is such that safety re-lated components / instruments are not adversely affected. This item is unresolved pending licensee action and NRC review (354/86-22-01). |
| | |
| | 6.3 Findings No violations were identifie .0 QA/QC Interfaces The inspector reviewed several randomly selected Quality Assurance Surveil-lance Report (QASR) covering licensee's technical specification surveil-lance program. The reports were reviewed to verify direct QA/QC monitoring of activities affecting the quality of testing of plant equipment and com-ponents. The following QSARs were reviewed: |
| | - |
| | QASR-86059, Surveillance of the performance of OP-IS.EG-101, Safety Auxiliaries Cooling System-Subsystem A valves - Inservice Test on March 1, 1986. The QA inspector witnessed the proper timing of seven valves and verified the use of calibrated test equipmen QASR-86074, Surveillance of the performance of CH-CA.ZZ-048, Viscosity of Opaque and Transparent Liquids, and CH-CA.ZZ-042, Water and Sedi-ment in Oil, on March 17, 198 The QA inspector witnessed the test-ing of Diesel Generator Fuel Oil samples taken from storage tanks DT-403 and FT-40 For the week proceeding fuel load, the QA department assigned 3 auditors to perform a surveillance of the surveillance test program. All departments were reviewed for accuracy and completeness of their surveillance test progra Problems were identified and corrected with the Chemistry and Health Physics Department The inspector reviewed Stat'on QA surveillance report No. 86-092. The administrative program used for controlling sur-veillance tests was also reviewe Findings No unacceptable conditions were noted during the above revie . |
| | |
| | .. . _ __ ___ - . |
| | |
| | . |
| | |
| | * |
| | . |
| | |
| | 1 I |
| | j' 8.0 Independent Verification I |
| | I |
| | ' |
| | During the surveillance test witnessing discussed in paragraph 2.0 of this report the inspectors independently timed (stopwatch) portions of the EDG 4 starting sequence. The inspector also independently reviewed strip chart recordings obtained during surveillance tests OP-5T-KJ-005 (006 and 007) i |
| | |
| | (Q) to verify EDG time to speed and voltage and load start sequence time i |
| | |
| | 9.0 Plant Tours |
| | : |
| | * |
| | ; The inspectors made several tours of various areas of the facility to observe work in progress, housekeeping, cleanliness controls and testing activities were in progress. As noted in Paragraphs 2.0 and 5.0 several |
| | , |
| | retests wore in progres ; |
| | 1 -; |
| | 9.1 Findings ' |
| | f No unacceptable conditions were identified. |
| | |
| | ; 10.0 Unresolved Items i |
| | l Unresolved items are matters about which more information is required in order to determine whether they are acceptable, an item of non-compliance |
| | ' |
| | ] or a deviation. An unresolved item disclosed during the inspection is j discussed in Paragraph 6.2. |
| | |
| | ) 11.0 Exit Interview |
| | [ A management meeting was held at the conclusion of the inspection on 1 April 11, 1986 to discuss the scope and findings as detailed in this re-i port (see Paragraph I for attendees). In addition, an interim exit meeting j was held with the licensee on April 4, 1986. No written information was provided to the licensee at any time during the inspection. The licensee |
| | ' |
| | ; did not indicate that proprietary information was contained within the |
| | ; scope of this inspection. |
| | |
| | ( |
| | i, i |
| | ! |
| | , |
| | ; |
| | i j |
| | |
| | d t |
| | |
| | ___ ___-_--__ |
| | . |
| | . |
| | . |
| | ATTACHMENT A TECHNICAL SPECIFICATION SURVEILLANCE PROCEDURES IC-CC.SE-001, Channel Calibrntion Nuclear Instrumentation System Channel A Source Range Monitor C51-K600A, Revision 4, dated February 19, 198 IC-FT. S E-001, Functional Test Nuclear Instrumentation System Channel A Source Range Monitor C51-K600A, Revision 2, dated March 18, 1986 IC-CC.SE-013, Channel Calibration Nuclear Instrumentation System Channel A Average Power Range Monitor, Revision 0, dated October 4, 198 IC-FT . S E-013, Functional Test Nuclear Instrumentation System Channel A Average Power Range Monitor, Revision 0, dated October 24, 198 OP-IO.ZZ-009, Refueling Operations, Revisions 0, dated January 25, 1986 |
| | , |
| | OP-ST.BF-001, Control Rod Drive Exercise - Weekly, Revision 0, dated August 26, 1985 OP-ST.EA-001, Service Water Flow Path Verification - Monthly, Revision 0, dated July 1, 1985 OP-ST.GU-002, Reactor Building Integrity Functional Test - 18 months, Revision 0, dated December 20, 1985 OP-ST.KE-001, Refuel Interlock Operability Function Test, Revision 1, dated February 25, 1986 OP-ST.SF-001, Reactor Mode Switch Functional Test - 18 months, Revision 0, dated August 14, 1985 OP-ST.SF-003, RPS Manual Scram Test - Monthly, Revision 0, dated January 9,198 RE-ST.ZZ-007, Shutdown Margin Demonstration, Revision 1, dated March 10, 1986 l |
| | -- |
| | |
| | . |
| | . |
| | ATTACHMENT B TECHNICAL SPECIFICATION SURVEILLANCE RESULTS OP-ST.BH-002, Standby Liquid Control Flow Test - 18 months, OP-ST.BH-003, Standby Liquid Control System Tank Flow Test - 18 months, i |
| | OP-ST.BH-004, Standby Liquid Control Storage Tank Heater Operability Test - |
| | 18 months, i |
| | 0P-ST.GV-002, Reactor Building Integrity Functional Test, |
| | ; IC-CC.SE-009, Channel E, Intermediate Range Monitor, IC-CC.SE-029, LPRM Gain Calibration, IC-CC.SE-015, Channel C, Average Power Range Monitor, IC-FT . B F-002, Control Rod Drive Hydraulic - Channel B1/B C11-N601B, Scram Discharge Volume High Water Level, IC-CC.SE-008, Channel D, Intermediate Range Monitor, OP-FT.KE-001, Refuel Platform and Fuel Grapple Operability Test - Refueling, MD-PM . KF-004, Polar Crane Preventive Maintenance and Check Out, MD-ST-SK-001, Polar Crane 7-day Surveillance Test, IC-CC-SE-016, Channel D, Average Power Range Monitor. |
| | |
| | , |
| | ! |
| | l i |
| | ' |
| | _ _ - - . __ _ _ ,_ . _ _ . _ |
| }} | | }} |
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20137W7811997-04-14014 April 1997 Insp Rept 50-354/97-01 on 970202-0317.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint, & Plant Support ML20135A3901997-02-21021 February 1997 Insp Rept 50-354/96-11 on 961222-970201.Violation Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19960101997-01-27027 January 1997 Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan IR 05000354/19960091996-12-0505 December 1996 Insp Rept 50-354/96-09 on 960922-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129D0891996-10-18018 October 1996 Insp Rept 50-354/96-07 on 960804-0921.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19950151996-02-14014 February 1996 Insp Rept 50-354/95-15 on 950905-1109.No Violations Noted. Major Areas inspected:safety-related Reactor Vessel Water Level Mod,Corrective Actons for Digital Feedwater Control Sys & RCIC Jockey Pump Corrective Action Process ML20084L7691995-05-30030 May 1995 Insp Rept 50-354/95-05 on 950406-21.No Violations Noted. Major Areas Inspected:Licensee Actions & Evaluations Associated W/Unplanned Release of Radioactive Matl from Hope Creek South Plant Vent That Occurred on 950405 IR 05000354/19930231993-12-15015 December 1993 Insp Rept 50-354/93-23 on 931004-1103.No Violations Noted. Major Areas Inspected:Review Licensee Corrective Actions of Previously Identified Edsfi Findings IR 05000354/19920191992-12-15015 December 1992 Insp Rept 50-354/92-19 on 921104-10.No Violations Noted. Major Areas Inspected:Licensees C/A for Mechanical Snubbers That Failed Functional Test & to Verify That Failed Snubbers Have Been Replaced or Restored to as-designed Condition IR 05000354/19910131991-06-21021 June 1991 Insp Rept 50-354/91-13 on 910520-24.No Violations Noted. Major Areas Inspected:Review of Several Open Items Remaining from Maint Team Insp 50-354/89-80 & Surveillance Test & Implementation IR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880201988-10-24024 October 1988 IR 50-354/88-20 on 880906-16.No Violations Noted. Major Areas Inspected:Verification That Emergency Operating Procedures Technically Adequate IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality 1999-08-11
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20137W7811997-04-14014 April 1997 Insp Rept 50-354/97-01 on 970202-0317.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint, & Plant Support ML20135A3901997-02-21021 February 1997 Insp Rept 50-354/96-11 on 961222-970201.Violation Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19960101997-01-27027 January 1997 Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan IR 05000354/19960091996-12-0505 December 1996 Insp Rept 50-354/96-09 on 960922-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129D0891996-10-18018 October 1996 Insp Rept 50-354/96-07 on 960804-0921.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19950151996-02-14014 February 1996 Insp Rept 50-354/95-15 on 950905-1109.No Violations Noted. Major Areas inspected:safety-related Reactor Vessel Water Level Mod,Corrective Actons for Digital Feedwater Control Sys & RCIC Jockey Pump Corrective Action Process ML20084L7691995-05-30030 May 1995 Insp Rept 50-354/95-05 on 950406-21.No Violations Noted. Major Areas Inspected:Licensee Actions & Evaluations Associated W/Unplanned Release of Radioactive Matl from Hope Creek South Plant Vent That Occurred on 950405 IR 05000354/19930231993-12-15015 December 1993 Insp Rept 50-354/93-23 on 931004-1103.No Violations Noted. Major Areas Inspected:Review Licensee Corrective Actions of Previously Identified Edsfi Findings IR 05000354/19920191992-12-15015 December 1992 Insp Rept 50-354/92-19 on 921104-10.No Violations Noted. Major Areas Inspected:Licensees C/A for Mechanical Snubbers That Failed Functional Test & to Verify That Failed Snubbers Have Been Replaced or Restored to as-designed Condition IR 05000354/19910131991-06-21021 June 1991 Insp Rept 50-354/91-13 on 910520-24.No Violations Noted. Major Areas Inspected:Review of Several Open Items Remaining from Maint Team Insp 50-354/89-80 & Surveillance Test & Implementation IR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880201988-10-24024 October 1988 IR 50-354/88-20 on 880906-16.No Violations Noted. Major Areas Inspected:Verification That Emergency Operating Procedures Technically Adequate IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality 1999-08-11
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20137W7811997-04-14014 April 1997 Insp Rept 50-354/97-01 on 970202-0317.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint, & Plant Support ML20135A3901997-02-21021 February 1997 Insp Rept 50-354/96-11 on 961222-970201.Violation Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19960101997-01-27027 January 1997 Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan IR 05000354/19960091996-12-0505 December 1996 Insp Rept 50-354/96-09 on 960922-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129D0891996-10-18018 October 1996 Insp Rept 50-354/96-07 on 960804-0921.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19950151996-02-14014 February 1996 Insp Rept 50-354/95-15 on 950905-1109.No Violations Noted. Major Areas inspected:safety-related Reactor Vessel Water Level Mod,Corrective Actons for Digital Feedwater Control Sys & RCIC Jockey Pump Corrective Action Process ML20084L7691995-05-30030 May 1995 Insp Rept 50-354/95-05 on 950406-21.No Violations Noted. Major Areas Inspected:Licensee Actions & Evaluations Associated W/Unplanned Release of Radioactive Matl from Hope Creek South Plant Vent That Occurred on 950405 IR 05000354/19930231993-12-15015 December 1993 Insp Rept 50-354/93-23 on 931004-1103.No Violations Noted. Major Areas Inspected:Review Licensee Corrective Actions of Previously Identified Edsfi Findings IR 05000354/19920191992-12-15015 December 1992 Insp Rept 50-354/92-19 on 921104-10.No Violations Noted. Major Areas Inspected:Licensees C/A for Mechanical Snubbers That Failed Functional Test & to Verify That Failed Snubbers Have Been Replaced or Restored to as-designed Condition IR 05000354/19910131991-06-21021 June 1991 Insp Rept 50-354/91-13 on 910520-24.No Violations Noted. Major Areas Inspected:Review of Several Open Items Remaining from Maint Team Insp 50-354/89-80 & Surveillance Test & Implementation IR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880201988-10-24024 October 1988 IR 50-354/88-20 on 880906-16.No Violations Noted. Major Areas Inspected:Verification That Emergency Operating Procedures Technically Adequate IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality 1999-08-11
[Table view] Category:UTILITY
MONTHYEARIR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality IR 05000354/19880161988-07-0606 July 1988 Insp Rept 50-354/88-16 on 880426-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Esf Sys Walkdown,Ler Followup,Emergency Preparedness & Assurance of Quality IR 05000354/19880101988-06-21021 June 1988 Insp Rept 50-354/88-10 on 880404-08.No Violations Noted. Major Areas Inspected:Review of Previously Identified Unresolved Items & Maint Outage Mgt That Encompassed Observations of Limitorque Valve Operator Insp IR 05000354/19880141988-06-20020 June 1988 Insp Rept 50-354/88-14 on 880418-22.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Processing,Preparation,Packaging & Shipping Program, Including Previously Identified Items ML20196J0671988-06-17017 June 1988 Enforcement Conference Rept 50-354/88-20 on 880609.Major Areas Inspected:Dept of Labor Determination That Contractor Bogan Discriminated Against Employee for Raising Safety Concerns.Agenda & Supporting Info Encl IR 05000354/19880171988-06-0202 June 1988 Insp Rept 50-354/88-17 on 880509-13.No Violations Noted. Major Areas Inspected:Licensee Effluent Controls,Liquid Effluent,Gaseous Effluent,Effluent Monitor Calibr, Ventilation Sys & Offsite Dose Calculation Manual IR 05000354/19880151988-06-0202 June 1988 Insp Rept 50-354/88-15 on 880418-22.No Violations or Deviations Noted.Major Areas Inspected:Startup Test Program Following First Refueling,Including Review of Startup Test Procedures & Test Results Evaluation IR 05000354/19880091988-05-24024 May 1988 Insp Rept 50-354/88-09 on 880322-0425.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Review of Maint Program,Esf Sys Walkdown & Assurance of Quality ML20197E2951988-05-19019 May 1988 Insp Rept 50-354/88-11 on 880321-25.No Violations or Deviations Noted.Major Areas Inspected:Review of Licensee Action in Response to Mark I Containment Mod Requirements of NUREG-0661 IR 05000354/19880081988-04-20020 April 1988 Insp Rept 50-354/88-08 on 880314-18.No Violations or Deviations Noted.Major Areas Inspected:Local Leak Rate Testing of Containment Isolation Boundaries & Implementation of Inservice Test Program for Pumps & Valves IR 05000354/19880061988-04-20020 April 1988 Insp Rept 50-354/88-06 on 880229-0303.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Organization & Staffing,Communications,Audits,Alara & High Radiation Area Access Control IR 05000354/19880131988-04-14014 April 1988 Insp Rept 50-354/88-13 on 880328-29.No Violations Noted. Major Areas Inspected:Inservice Insp Activities to Ascertain Whether Licensee Activities Conducted in Compliance W/ Applicable ASME Code & Regulatory Requirements ML20151W1711988-04-0909 April 1988 Insp Rept 50-354/88-03 on 880126-29.Violation Noted.Major Areas Inspected:Licensee Environ Qualification Program & Licensee Response & Resolutions to Equipment Concerns Identified in SER IR 05000354/19880051988-04-0404 April 1988 Onsite Resident Insp Rept 50-354/88-05 on 880209-0321. Violation Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Testing,Maint Activities,Reactor Coolant Spill in Torus Basement & Assurance of Quality IR 05000272/19880061988-03-18018 March 1988 Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness IR 05000354/19880011988-03-0404 March 1988 Insp Rept 50-354/88-01 on 880105-0208.Violation Noted.Major Areas Inspected:Followup of Outstanding Insp Items, Operational Safety Verification,Surveillance Testing,Maint Activities,Esf Sys Walkdown,Lers & Design Change Packages IR 05000354/19870271987-12-31031 December 1987 Radiological Controls Insp Rept 50-354/87-27 on 871116-18 & 20.No Violations Noted.Major Areas Inspected:Process & Area Radiation Monitor Surveillance Testing,Sealed Sources, Radiological Controls for New Fuel Receipt & Insp & ALARA IR 05000354/19870281987-12-21021 December 1987 Insp Rept 50-354/87-28 on 871116-20.No Violation Noted.Major Areas Inspected:Radiochemical Measurements Program, Confirmatory Measurements,Audits & Boron Analysis IR 05000354/19870251987-11-25025 November 1987 Insp Rept 50-354/87-25 on 870921-25.No Violations Noted. Major Areas Inspected:Organization & Staffing,Mgt Oversight, Training & Qualification,External Exposure Controls,Alara, Internal Exposure Controls & High Radiation Area Controls IR 05000354/19870201987-11-0303 November 1987 Emergency Preparedness Insp Rept 50-354/87-20 on 870908-10. No Violations Noted.Major Areas Inspected:Observation of Licensee Full Participation,Emergency Exercise Conducted on 870909 & Insp of Training Records ML20235T8501987-10-0101 October 1987 Insp Rept 50-354/87-17 on 870714-0817.Violation Noted.Major Areas Inspected:Followup on Outstanding Insp Items,Maint Activities,Operational Safety Verification,Surveillance Testing,Esf Sys Walkdown & Instrument Calibr Data Cards IR 05000354/19870191987-10-0101 October 1987 Insp Rept 50-354/87-19 on 870727-30.No Violations Noted. Major Areas Inspected:Licensee Action on Previous NRC Findings,Organization & Staffing,Audits & External Exposure Control IR 05000354/19870211987-09-0404 September 1987 Insp Rept 50-354/87-21 on 870817-21.No Violations or Deviations Noted.Major Areas Inspected:Licensee Program for Resolving QA Action Requests IR 05000354/19870161987-07-20020 July 1987 Insp Rept 50-354/87-16 on 870609-0713.Violations Noted. Major Areas Inspected:Followup on Outstanding Insp Items, Operational Safety Verification,Surveillance Testing,Maint Activities,Esf Sys Walkdown & LER Followup IR 05000354/19870141987-07-0606 July 1987 Insp Rept 50-354/87-14 on 870512-0608.Deviation Noted.Major Areas Inspected:Outstanding Insp Items,Operational Safety Verification,Surveillance Testing,Maint Activities,Esf Sys Walkdown & LER Followup IR 05000354/19870131987-06-0101 June 1987 Insp Rept 50-354/87-13 on 870504-06 & 12.No Violations Noted.Major Areas Inspected:Licensee Activities in Areas of Surveillance Testing,Procedures & Records IR 05000354/19870111987-05-28028 May 1987 Insp Rept 50-354/87-11 on 870414-0511.Major Areas Inspected: Followup on Outstanding Insp Items,Operational Safety Verification & Security Insp.Addl Mgt Attention Needed in Housekeeping Area to Ensure Cleanliness Stds Maintained IR 05000354/19870101987-04-0707 April 1987 Insp Rept 50-354/87-10 on 870316-20.No Violations Noted. Major Areas inspected:post-accident Monitoring Sys Conformance W/Rev 2 to Reg Guide 1.97.Open Item Identified Re Identification of Category 2 Equipment IR 05000354/19870071987-04-0303 April 1987 Insp Rept 50-354/87-07 on 870309-13.Unresolved Items Re Evaluation of Offgas Delay Time & Determination of Dose & Dose Commitments & Continuing Problems W/Licensee Process & Effluent Monitors Noted IR 05000354/19870061987-03-23023 March 1987 Insp Rept 50-354/87-06 on 870224-26.No Violations Noted. Major Areas Inspected:Power Ascension Test Program,Plateau Review,Test Results Evaluation,Outstanding Results Deficiencies,Qa Interface & Independent Measurements IR 05000354/19870031987-03-23023 March 1987 Insp Rept 50-354/87-03 on 870209-13.No Violations,Deviations or Unresolved Items Noted.Major Areas Inspected:Emergency Preparedness Program IR 05000354/19870051987-03-20020 March 1987 Insp Rept 50-354/87-05 on 870210-0309.Violation Noted: Failure to Obtain & Analyze Grab Samples of Cooling Tower Blowdown Line.Unresolved Item Noted Re Environ Qualification of MSIV Terminal Boxes IR 05000354/19870011987-03-0404 March 1987 Insp Rept 50-354/87-01 on 870101-0209.Violation Noted: Failure to Obtain & Analyze Grab Samples Per Drywell Leak Detection Action Statement IR 05000354/19870041987-03-0404 March 1987 Insp Rept 50-354/87-04 on 870127-30.No Violations Noted. Major Areas Inspected:Nonradiological Chemistry Program, Including Measurement Control & Analytical Procedure Evaluations IR 05000354/19870021987-02-0606 February 1987 Safety Insp Rept 50-354/87-02 on 870112-16.Violations Noted: Failure to Properly Identify & Quantify Fe-59 & Zr-95 in Shipment 86-04,Details 6.1 & 6.4 & Incorrect Certification for Shipment 86-04,Detail 6.1 IR 05000354/19860601987-02-0505 February 1987 Physical Security Insp Rept 50-354/86-60 on 861230.No Violation Noted.Major Areas Inspected:Review of Licensee Program for Conducting Contingency Drills to Evaluate Effectiveness & Impact of Drills During Security Activities 1990-07-26
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000354/19983021999-10-13013 October 1999 Suppl NRC Operator Licensing Exam Rept 50-354/98-302 on 991025-29 (NRC Onsite Review),Mgt Meeting on 990322, in-office Reviews on 990429-30 & 0617-18 & Telephone Call on Appeal Results on 990720 IR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999 PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20196D0911998-11-23023 November 1998 Notice of Violation from Insp on 980920-1031.Violation Noted:On 981001,electricians Placed Single Degraded Cell Associated with Operable 1E Battery Bank on Single Cell Charge IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering PNO-I-98-053, on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie1998-11-16016 November 1998 PNO-I-98-053:on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie ML20154Q7381998-10-16016 October 1998 Second Suppl to NRC Exam Rept 50-354/98-03OL for Tests Administered on 980304-12,0519-21,22-28 & 0629.Five of Five Reactor Operator Applicants & Four of Five Senior Reactor Applicants Passed Exams ML20154J8611998-10-0909 October 1998 Notice of Violation from Insp on 980809-0919.Violation Noted:On 980831,licensee Did Not Promptly Correct Condition Adverse to Quality in That 'C' Residual Heat Removal Pump Rendered Inoperable IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19983011998-09-0404 September 1998 Exam Rept 50-354/98-301OL Conducted on 980810-12.Exam Results:Four SRO Candidates Performed Well on Both Written & Operating Portions of Exam.All Four Were Issued Licenses ML20237E4981998-08-25025 August 1998 Notice of Violation from Insp on 980628-0808.Violation Noted:As of 980810,util Had Not Corrected Known Deficiency in Verifying MSIV Full Closed During Springs Only Full Stroke Closing Tests IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236T1601998-07-21021 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:As of Oct 1997,chemistry Technicians Did Not Sample & Analyze Diesel Fuel Oil Deliveries for Particulates & Did Not Report Results by Written Notification within 14 Days IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980031998-06-16016 June 1998 Suppl to NRC Licensing Exam Rept 50-354/98-03OL (Including Completed & Graded Tests) for Tests Administered on 980223- 0304 IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering ML20249A2031998-06-10010 June 1998 Notice of Violation from Insp on 980223-0319 & 0427-30. Violation Noted:Conditions Adverse to Quality Were Not Promptly Identified & Corrected IR 05000354/19980991998-06-0808 June 1998 SALP Rept 50-354/98-99 for Period of 961110-980516 ML20249A1071998-06-0404 June 1998 Notice of Violation from Insp on 980405-0516.Violation Noted:During Refueling Outage RF03 in Dec 1990 Licensee Did Not Maintain RHR Sys in Operation IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217M0491998-04-28028 April 1998 NRC Operator Licensing Exam Rept 50-354/98-03OL,(including Completed & Graded Tests) for Tests Administered on 980223-0304 ML20217N6221998-04-24024 April 1998 Notice of Violation from Investigation Conducted by Oi. Violation Noted:Safeguard Event Log,Required to Be Maintained by Licensee,Was Not Complete & Accurate in All Matl Aspects IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program ML20217H8051998-04-23023 April 1998 Notice of Violation from Insp on 980222-0404.Violation Noted:Three Examples of Inadequate Accomplishment of Procedure Control Associated W/Temporary Equipment Installed in Plant Svc Water Intake Structure ML20217C6711998-03-20020 March 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:On 971112,while Reactor Was in Cold Shutdown W/Rv Head Removed,Operators Did Not Verify That CR Position Did Not Change During Withdrawal ML20217D8291998-03-17017 March 1998 EN-98-013:informs That NOV & Proposed Imposition of Civil Penalty in Amount of $55,000 Will Be Issued on or About 980330 to Pse&G.Civil Penalty Based on Violation Involving Failure by Operating Crew to Follow Procedures IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L4791998-02-0303 February 1998 Notice of Violation from Insp on 971126-980103.Violation Noted:On 971124,maint Technicians Failed to Follow HC.IC-DC.ZZ-0140(Q),Rev 3, Device/Equipment Calibration Masonleilan Pressure & Temperature Controllers ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20199D3171997-11-12012 November 1997 Notice of Violation from Insp on 970824-1004.Violation Noted:On 970914,electric motor-driven Fire Pump Supply Breaker Opened During Electrical Bus Swap Which Rendered Pump Inoperable ML20196J6531997-10-20020 October 1997 Notice of Violation from Insp on 970202 & 0317.Violation Noted:In Apr 1994,licensee Made Changes to Facility That Involved USQ Without Prior Commission Approval ML20198L9531997-10-15015 October 1997 NRC Operator Licensing Exam Rept 50-354/97-08OL for Tests Administered on 970929-1002.Exam Results:Four Candidates Passed All Portions of License Exam.One Candidate Failed Written Exam IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9061997-08-11011 August 1997 Notice of Violation from Insp on 970601-0712.Violation Noted:Inoperable HPCI Sys Injection Valve Was Not Promptly Identified ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20217E7851997-07-25025 July 1997 Investigation Rept 1-96-024 on 970725.No Noncompliance Noted.Major Areas Investigated:Allegations Re Failure to Make 10CFR73.71 Notification by Station Security Dept ML20140J3811997-06-12012 June 1997 Notice of Violation from Insp on 970429-0531.Violation Noted:Failing to Adhere to Established Procedural Guidance for safety-related Activities Were Identified,Significant Condition Adverse to Quality ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20148D2011997-05-23023 May 1997 Notice of Violation from Insp on 970318-0428.Violation Noted:On 970423,operators Failed to Shut Six of Twelve Cylinder Indicator Test Cocks Following Completion of C Emergency Diesel Generator pre-start Checks 1999-09-16
[Table view] |
Text
r
.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report N /86-22 Docket N License N CPPR-120 Category B
!
Licensee: Public Service Electric and Gas Company 80 Park plaza - 17C Newark, New Jersey 07101 Facility Name: Hope Creek Generating Station Unit, 1 Inspection At: Hancocks Bridge, New Jersey Inspection Conducted: March 31, 1986-April 11, 1986 Inspectors h L. Briggs ad eactor ngineer 5 .3
' dat'e
[
L.~ Wink Reac Engineer '
date T E'rell, Re to Engin r shiln/ ddti Approved by: , J Y selgroth ,
~
. lef
'
dite Test Progra Section, OB, DRS Inspection Summary: Inspection on March 31, 1986 - April 11, 1986 (Inspection Report No. 50-354/86-22)
Areas Inspected: Routine unannounced inspection by three region-based inspec-tors of licensee actions on previous inspection findings, Technical Specifi-cation surveillances for operational condition 5, power ascension test program, preoperational, detailed and surveillance test results evaluation review, pre-operational retest witnessing, QA/QC interfaces, independent verification and plant tour Results: No violations were identifie NOTE: For acronyms not defined refer to NUREG-0544 " Handbook of Acronyms and Initialims."
.
! 8606090301 860602 '
$DR ADOCK 05000354 PDR
- -- - -- -
_ - . ~ . - - -- . . - . -
.
.
DETAILS 1.0 Persons Contacted Public Service Electric and Gas (PSE&G) Personnel and Contractors G. Chew, Power Ascension Technical Support
- G. Connor, Operations Manager G. Daves, Senior Engineer-Operations
- M. Farschon, Power Ascension Manager B. Forward, Power Ascension Administration
- S. Funsten, I&C Engineer
- R. Griffith, Principal QA Engineer
- P. Krishna, Assistant to General Manager-Hope Creek Operations
- P. Kudless, Maintenance Manager
- S. LaBruna, Assistant General Manager
- J. Lovell, Radiation Protection / Chemistry Manager
'
- C. McNeill, Jr. , Vice President-Nuclear
- M. Metcalf, Principal QA Engineer J. Montgomery, Maintenance Technical Specification Coordinator C. Moore, Startup Test Engineer L. Rice, I&C Work Order Planner E. Rush, I&C Technical Specification Coordinator W. Ryder, Operations Technical Specification Coordinator
- R. Salvesen, General Manager, Hope Creek Operations W. Schell, Power Ascension Technical Director T. Szumski, Power Ascension Engineer S. Tanner, I&C Engineer U. S. Nuclear Regulatory Commission
- D. Allsopp, Resident Inspector
- R. Borchardt, Senior Resident Inspector
- J. Lyash, Reactor Engineer The inspection also contacted other members of the licensee staff includ-ing senior nuclear shift supervisors, reactor operators, test engineers and members of the technical staf * Denotes those present at the interim exit meeting on April 4, 1986.
- Denotes those present at toe final exit meeting on April 11, 1986.
2.0 Licensee Actions on Previous Inspection Findings (Closed) Unresolved Item (354/86-12-01). Licensee to modify and re-test nuclear steam supply shutoff system manual initiation pushbuttons (B21H-S28A, B, C and D) to close test exception SDR-SM-0086.
-
__ __ _ ..
.
?
,
.
,
The inspector reviewed the completed re-test package (TPR: SME-0025) and verified that the appropriate modifications had been made and the push-button re-tested. The inspector questioned the startup test engineer to insure that the scope of the re-test was adequate to assure the proper i functioning of the pushbuttons.
.
This item is close (Closed) Unresolved Item (354/86-21-01) Determination of acceptability of surveillance test-OP-ST.KJ-005 (006, 007 and 008)(Q) to satisfy preopera-tional test requirements. During results review / evaluation of preopera-tional test procedure (PTP)-BB-3(A), Standby Diesel Generator Loading, and PTP-BB-3(B), ECCS Integrated Initiation / Loss of Offsite Power, the inspec-
,
tor determined that integrated system performance had not been fully demon-strated. During this inspection the inspector reviewed surveillance test i OP-ST.KJ-005,(006, 007 and 008)(Q), Integrated Emergency Diesel Generator I 1AG400 (IBG400, ICG400 and IDG400) Test - 18 months. The inspector deter-mined that satisfactory performance of the surveillanc- "est would demon-
.
strate proper performance of each emergency diesel g" ttor (EDG) and its
, associated electrical bus. On April 2, 1986 the inst ars observed per-
- formance of portions of OP-ST.KJ-007 (Q)('C'EDG). Th< ..ocedure was stop-f ped by the licensee when the Residual Heat Removal (RhR) pump did not start
during the initiation sequenc That portion of the test was satisfactori-i ly completed later during the 11 p.m. to 7 a.m. shift when an incorrect j test connection not noted in the test was discovered and corrected. One j hardware problem was identified by the inspectors when it was noted that the Logic Out of Service annunciator for the 'C' RHR pump was not energized as required by the procedure. This item is being investigated by the 11-a censee and being followed by the resident inspector.
,
On April 9 and 10, 1986 the inspector reviewed the results of the 18 month surveillance tests performed on the A, B and C EDG's with a licensee re-
presentative. All data were acceptable, with c.,1y the annunciator problem discussed above remaining unanswered.
!
This item is closed.
'
3.0 Power Ascension Test Program (PATP)
!
,
3.1 References j * Regulatory Guide 1.68, Revision 2, August 1978, " Initial Test Programs for Water-Cooled Nuclear Power Plants"
- ANSI N18.7 - 1976, " Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants" l
,
l l
l l
l
- . _
-- -. - - - . - __ -. --
. .
-
,
,
- Hope Creek Generating Station (HCGS) Technical Specifications, l Proof and Review Copy l * HCGS Safety Evaluation Report, Chapter 14, " Initial Test
- Program"
- * Station Administrative Procedure, SA-AP.ZZ-036, Revision 1,
'
" Phase III Startup Test Program" i *
Specification NE80 23A4137, Revision 0, " Hope Creek Startup Test
,
Specification"
- HCGS Power Ascension Test Matrix, Revision 3 j 3.2 Overall Power Ascension Test Program (PATP)
i Discussion
^
The inspector met with the Power Ascension Manager and members of his staff to discuss the overall readiness of the program, status of training activities and progress on procedure review and revision Based on these discussions, and the procedure reviews discussed in r
paragraph 3.3 below, the inspector was satisfied that the Power Ascen-
!
- sion Test Program was adequately prepared to support fuel loading and iow power testing. Training on Power Ascension Test Procedures, in-1 cluding an integrated " dry run" of the fuel loading procedures, has i been completed satisfactorily. The Technical Review Board, utilized j '
to improve the quality of the PATP procedures, has completed its re-view of the fuel loading and low power testing procedures and appro-
,
priate revisions are being made.
- 3.3 Power Ascension Test Procedure Review
i Scope l The Power Ascension Test Procedures discussed below were reviewed j for their conformance to the requirements and guidelines of the
! references listed in paragraph 3.1 and for the attributes previously
defined in Inspection Report 50-354/86-03. In addition, the resi-
'
- sions reviewed were verified to adequately address the concerns identified in Inspection Report 50-354/86-0 Discussion i
!
Initial Fuel Loading
!
The inspector reviewed the approved revision to the fuel loading
] test procedure (TE-SU.KE-032, Revision 1) in Jetail and verified i
'
that it was in conformance with the Regulatory Guide and FSAR commitments and that it would provide a technically adequate basis l
!
- - - - - - -- -. . . - - - . = -
.
t .
J for safely conducting the initial fuel loading. -It was also deter-mined that all the inspector's concerns identified in an earlier l inspection had been adequately addressed in this revisio Initial Criticality / Full Core Shutdown Margin Demonstration The inspector reviewed the approved revision to the power ascension test procedure, TE-SU.ZZ-041, Revision 1, Full Core Shutdown Margin
Demonstration, in detai The inspector determined that the proce-dure was in conformance with the Regulatory Guide and FSAR commit -
ments and that it was adequate to ensure that the initial approach to i
criticality would be conducted in a deliberate and orderly manne ! In addition, the procedural deficiencies identified as a violation (86-03-03) in a previous inspection report had been adequately addressed in this revisio Findings
- Within the scope of the inspection, no violations were identified.
j 4.0 Technical Specification Surveillances For Operational Condition 5
4.1 Scope
.
Tne licensee's surveillance activities were monitored to insure that technical specification surveillance requirements were being adequate-ly met. The inspector also reviewed selected surveillance procedures to verify that they were consistent with the final draft of the faci-lity's Technical Specifications.
4.2 Discussion
- The surveillance procedures listed in Attachment A were reviewed to insure conformance with the final draft Technical Specifications and for technical adequacy. Minor concerns identified by the inspector
- were all resolved through discussions with the appropriate work group technical specification coordinators.
'
The inspector reviewed the completed technical specification surveil-
^ lances listed in Attachment B to insure that all appropriate accept-
'
ance criteria were satisfied. In addition, the inspector verified through a 20% sample, that all I&C surveillances that were logged as completed, had been properly reviewed and filed and the surveillance J
i results were retrievable for review.
$
l
}
}
!
.
-
4.3 Test Witnessed The following two surveillance tests were witnessed by the inspector:
IC-FT-BF-001, Revision 2, Scram Discharge Volume High Water Level 0P-ST.KE-001, Revision 3, Refuel Interlock Operability Functional Test In addition the training and qualifications of those refueling bridge operators, which will be used for the initial fuel load, were reviewe Discussions were also held with QA to determine their involvement with the refueling operator training and qualification progra .4 Findings Within the scope of the inspection, no violations were identifie .0 Preoperational Test Retest Witnessing 5.1 Scope Testing witnessed by the inspector included the observations of overall crew performance stated in Paragraph 3.0 of Inspection Report 50-354/85-1 .2 Discussion During this inspection the inspector noted several preoperational test retests being conducted to clear test exceptions. Among those observed were:
--
Test Package Release (TPR) GSC-0412 and GTI-28C-6032, Opera-tion / Maintenance Instruction for Containment 2H and 02 Analyzer Systems
--
PTP-BB-3 Part B, Retest No. 1, Check of Control Room Emergency Filter Unit, and
--
PTP-GM-1, 50R-GM-443, Retest of AP414 and BP41 The inspector observed that testing was being conducted in accordance with written procedures and satisfied the criteria referenced in Paragraph 5.1 above.
. - - _ - - - _ _ _ _ - _ _ _ _ - _ _ _ - . _ _ _ _ - .-_
.- . . - - _ - . - . . - .-
.
l* 7 6.0 Preoperational, Detailed and Surveillance Test Results Evaluation Review 6.1 Scope The completed test procedures listed below were reviewed during this inspection to verify that adequate testing has been conducted to sa-tisfy regulatory guidance, licensee commitments and FSAR requirements I and to verify that uniform criteria were being applied for evaluation of completed test results in order to assure technical and administra-tive adequacy.
J The inspector reviewed the test results and verified the licensee's evaluation of test results by review of test changes, test exception, test deficiencies, "As-Run" copy of the test procedure, acceptance criteria, performance verification, recording conduct of test, QC j inspection records, restoration of system to normal after test, j independent verification of critical steps or parameters, identifi-
- cation of personnel conducting and evaluating test data, and veri-j
.
fication that the test results have been approved.
!
--
PTP-KL-1, Primary Containment Instrument Gas, Revision 0,
{ results licensee approved on March 18, 1986,
! --
PTP-SB-2, Response Time Testing, Revision 0, results licensee i approved on April 3, 1986, i
! --
DTP-SB-0001, Recirculation Pump Trip Breaker Interrupt Time,
! Revision 0, results licensee approved on March 27, 1986,
i --
DTP-SB-0002, Turbine Stop Valve / Recirculation Pump Trip Response Time and RPS Trip Response Time, Revision 0, results
,
licensee approved on March 27, 1986,
--
DTP-SB-0003, Turbine Controi Valve Fast Closure / Recirculation l Pump Breaker Trip and RPS Trip Response Time, Revision 0, i results licensee' approved on March 27, 1986, and I --
OP-ST.KJ-005 (006 and 007) (Q) Integrated Emergency Diesel
- Generator 1AG400 (IBG400 and ICG400) Test-18 months, Revision 0,
} Discussed in Paragraph 2.0.of this report.
] 6.2 Discussion i
- During review of PTP-KL-1 the inspector noted that air quality
! samples were taken at the containment instrument gas system receiver
! drain valves and analyzed for 3.0 micrometer particle size. The
, inspector questioned why air quality samples had not been obtained
! at the end of the feeder lines as suggested by Regulatory Guide 1.68.3, Preoperational Testing of Instrument and Control. Air Systems.
]
.
!
!
!
l.- . - _ - - -. - _ ._ - , , . - _ - , , , . . , - . , . . -, , , ... ,.-.- ,-.- ,. -
_ _ _ _ _
.
The licensee noted that a satisfactory flush had been previously con-ducted using General Test Procedure (GTP)-1, General Flushing and Cleaning Procedure. The inspector stated that GTP-1 flush samples method would not be able to detect 3.0 micrometer particles and could not verify system cleanlines The licensee agreed and stated that further sampling would be performed to verify particle siz If par-ticle size criteria are exceeded further action will be taken to re-solve the issue and ensure that air quality is such that safety re-lated components / instruments are not adversely affected. This item is unresolved pending licensee action and NRC review (354/86-22-01).
6.3 Findings No violations were identifie .0 QA/QC Interfaces The inspector reviewed several randomly selected Quality Assurance Surveil-lance Report (QASR) covering licensee's technical specification surveil-lance program. The reports were reviewed to verify direct QA/QC monitoring of activities affecting the quality of testing of plant equipment and com-ponents. The following QSARs were reviewed:
-
QASR-86059, Surveillance of the performance of OP-IS.EG-101, Safety Auxiliaries Cooling System-Subsystem A valves - Inservice Test on March 1, 1986. The QA inspector witnessed the proper timing of seven valves and verified the use of calibrated test equipmen QASR-86074, Surveillance of the performance of CH-CA.ZZ-048, Viscosity of Opaque and Transparent Liquids, and CH-CA.ZZ-042, Water and Sedi-ment in Oil, on March 17, 198 The QA inspector witnessed the test-ing of Diesel Generator Fuel Oil samples taken from storage tanks DT-403 and FT-40 For the week proceeding fuel load, the QA department assigned 3 auditors to perform a surveillance of the surveillance test program. All departments were reviewed for accuracy and completeness of their surveillance test progra Problems were identified and corrected with the Chemistry and Health Physics Department The inspector reviewed Stat'on QA surveillance report No.86-092. The administrative program used for controlling sur-veillance tests was also reviewe Findings No unacceptable conditions were noted during the above revie .
.. . _ __ ___ - .
.
.
1 I
j' 8.0 Independent Verification I
I
'
During the surveillance test witnessing discussed in paragraph 2.0 of this report the inspectors independently timed (stopwatch) portions of the EDG 4 starting sequence. The inspector also independently reviewed strip chart recordings obtained during surveillance tests OP-5T-KJ-005 (006 and 007) i
(Q) to verify EDG time to speed and voltage and load start sequence time i
9.0 Plant Tours
- The inspectors made several tours of various areas of the facility to observe work in progress, housekeeping, cleanliness controls and testing activities were in progress. As noted in Paragraphs 2.0 and 5.0 several
,
retests wore in progres ;
1 -;
9.1 Findings '
f No unacceptable conditions were identified.
- 10.0 Unresolved Items i
l Unresolved items are matters about which more information is required in order to determine whether they are acceptable, an item of non-compliance
'
] or a deviation. An unresolved item disclosed during the inspection is j discussed in Paragraph 6.2.
) 11.0 Exit Interview
[ A management meeting was held at the conclusion of the inspection on 1 April 11, 1986 to discuss the scope and findings as detailed in this re-i port (see Paragraph I for attendees). In addition, an interim exit meeting j was held with the licensee on April 4, 1986. No written information was provided to the licensee at any time during the inspection. The licensee
'
- did not indicate that proprietary information was contained within the
- scope of this inspection.
(
i, i
!
,
i j
d t
___ ___-_--__
.
.
.
ATTACHMENT A TECHNICAL SPECIFICATION SURVEILLANCE PROCEDURES IC-CC.SE-001, Channel Calibrntion Nuclear Instrumentation System Channel A Source Range Monitor C51-K600A, Revision 4, dated February 19, 198 IC-FT. S E-001, Functional Test Nuclear Instrumentation System Channel A Source Range Monitor C51-K600A, Revision 2, dated March 18, 1986 IC-CC.SE-013, Channel Calibration Nuclear Instrumentation System Channel A Average Power Range Monitor, Revision 0, dated October 4, 198 IC-FT . S E-013, Functional Test Nuclear Instrumentation System Channel A Average Power Range Monitor, Revision 0, dated October 24, 198 OP-IO.ZZ-009, Refueling Operations, Revisions 0, dated January 25, 1986
,
OP-ST.BF-001, Control Rod Drive Exercise - Weekly, Revision 0, dated August 26, 1985 OP-ST.EA-001, Service Water Flow Path Verification - Monthly, Revision 0, dated July 1, 1985 OP-ST.GU-002, Reactor Building Integrity Functional Test - 18 months, Revision 0, dated December 20, 1985 OP-ST.KE-001, Refuel Interlock Operability Function Test, Revision 1, dated February 25, 1986 OP-ST.SF-001, Reactor Mode Switch Functional Test - 18 months, Revision 0, dated August 14, 1985 OP-ST.SF-003, RPS Manual Scram Test - Monthly, Revision 0, dated January 9,198 RE-ST.ZZ-007, Shutdown Margin Demonstration, Revision 1, dated March 10, 1986 l
--
.
.
ATTACHMENT B TECHNICAL SPECIFICATION SURVEILLANCE RESULTS OP-ST.BH-002, Standby Liquid Control Flow Test - 18 months, OP-ST.BH-003, Standby Liquid Control System Tank Flow Test - 18 months, i
OP-ST.BH-004, Standby Liquid Control Storage Tank Heater Operability Test -
18 months, i
0P-ST.GV-002, Reactor Building Integrity Functional Test,
- IC-CC.SE-009, Channel E, Intermediate Range Monitor, IC-CC.SE-029, LPRM Gain Calibration, IC-CC.SE-015, Channel C, Average Power Range Monitor, IC-FT . B F-002, Control Rod Drive Hydraulic - Channel B1/B C11-N601B, Scram Discharge Volume High Water Level, IC-CC.SE-008, Channel D, Intermediate Range Monitor, OP-FT.KE-001, Refuel Platform and Fuel Grapple Operability Test - Refueling, MD-PM . KF-004, Polar Crane Preventive Maintenance and Check Out, MD-ST-SK-001, Polar Crane 7-day Surveillance Test, IC-CC-SE-016, Channel D, Average Power Range Monitor.
,
!
l i
'
_ _ - - . __ _ _ ,_ . _ _ . _