ML20128M331: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20128M331
| number = ML20128M331
| issue date = 07/15/1985
| issue date = 07/15/1985
| title = Responds to 850418 Ltr Re Validity of Comments by Clark at 850418 Meeting Denying That Changes to Steam Generator Tube Rupture Procedures Made to Account for Problems Encountered in Tubes.Clark Statements True
| title = Responds to Re Validity of Comments by Clark at 850418 Meeting Denying That Changes to Steam Generator Tube Rupture Procedures Made to Account for Problems Encountered in Tubes.Clark Statements True
| author name = Denton H
| author name = Denton H
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8507250293
| document report number = NUDOCS 8507250293
| title reference date = 04-18-1985
| package number = ML20128K764
| package number = ML20128K764
| document type = CORRESPONDENCE-LETTERS, NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA, OUTGOING CORRESPONDENCE

Latest revision as of 19:03, 21 August 2022

Responds to Re Validity of Comments by Clark at 850418 Meeting Denying That Changes to Steam Generator Tube Rupture Procedures Made to Account for Problems Encountered in Tubes.Clark Statements True
ML20128M331
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/15/1985
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Weiss E
UNION OF CONCERNED SCIENTISTS
Shared Package
ML20128K764 List:
References
NUDOCS 8507250293
Download: ML20128M331 (10)


Text

_ _ _ _ _ _

JUL.15 586 Ms. Ellyn R. Weiss sdT4f Union of Concerned Scientists O 1346 Connecticut Avenue N. W.

Suite 1101 Washington, D. C. 20036

Dear Ms. Weiss:

The Comissioners have requested that I respond to your letter of April 18, 1985 concerning coments made by Mr. Clark of GPU Nuclear Corporation to the April 18, 1985 Comission meeting.

You challenged the validity of the statements made by Mr. Clark at the April 18 meeting which denied that the changes to the steam generator tube rupture procedures were made to account for the problems encountered in the steam generator tubes at TMI-1. You cited statements taken from pages 14 and 15 of the GPU Technical Data Report (TDR) 406 Rev. 3 to support a view that contrary to Mr. Clark's statements, there was a connection between the revised procedures and the steam generator tube problems at TMI-1. You further noted, that Mr. Clark was on distribution for the GPU TDR 406 and should have been knowledgeable about the document.

The primary sentence in TDR 406 which appears to contradict Mr. Clark's statements is as follows:

Since extensive circumferential cracking was discovered in approximately 1200 of the 31,000 tubes, it became clear that a revised set of procedures for dealing with both single and multiple SGTRs [ steam generator tube ruptures, should be developed.

From one perspective, this one sentence from the TDR is not wholly consistent with the statements made by Mr. Clark at the Comission meeting. However, the sentence could also be read as merely saying that GPU should be prepared for the possibility of a tube rupture accident because one could happen.

The TOR as a whole focuses on ways to improve procedures to handle tube rupture accidents; it does not promote reliance on such procedures to "accomodate" or " compensate for" degradation of the steam generators.

Mr. Clark's statements in question involve his responses to similar questions posed by different Comissioners during the course of his presentation at the April 18th Comission meeting on the TMI-1 steam generators. The Comissioners' questions were aimed at probing whether, as you allege, changes were made in plant operating procedures in order to account for the degraded condition of the TMI-1 steam generators. Mr. Clark denied that the changes were proposed for that reason, explaining, for example in response to Comissioner Zech:

5 8507250293 850 209 PDR ADOCK o PDR' P

- 1

~

We believe that the procedures we now have approved for TMI-1 are the proper procedures to use for the plant. That they provide greater protection of the public health and safety, and that they should be adopted regardless of steam generator condition. And in fact in many cases -- and I hesitate to say "all" because we have not gone back and looked -- we were looking at those changes in the procedures before the steam generator problem was even known....

They are not developed in order to accomodate [ sic] any concern about the steam generator. They are developed for other good and sufficient reasons independent of that.

This response can be found from a transcript of the meeting at 93.

Other applicable responses from Mr. Clark can be found in the same Transcript at 68-69, 72, 78-79, 101, and 108-109.

From our viewpoint, the TMI-1 steam generators have been returned to their original licensing basis and meet applicable requirements; and therefore the improved procedures are not necessary to account for any alleged degradation of the steam generators. We believe that the TMI-1 procedures are prudent procedures. In this regard, it is worth noting that, regardless of whether there is a history of steam generator tube degradation, a steam generator tube rupture (SGTR) is a design basis accident for which we expect a licensee to be prepared to respond. Both the NRC and industry have had under consideration improvements in responding to such accidents so as to minimize their consequences; and new Babcock & Wilcox SGTR guidelines for other plants are similar to those at TMI-1 in many respects. Our interest in the emergency procedures for handling a tube rupture at TMI-1 was based primarily on the results of our review of the 1982 tube rupture event at the Ginna plant. (Refer to NUREG-0909 and NUREG-0916 for further details). In fact, as a result of knowledge gained by the Ginna event we asked GPU Nuclear to review its procedures for dealing with a tube rupture accident. GPU Nuclear indicated that it was considering revisions to the procedure (Mr. Clark indicated at the Cocnission meeting that some changes were under consideration as early as 1979).

As described in our safety evaluation, NUREG-1019, we consider the present TMI-1 procedures to be an improvement over the earlier procedures. Nonetheless, the staff could accept the earlier procedures as adequate.

Thus, notwithstanding the single anomalous statement in the TDR, we do not conclude that Mr. Clark's statements to the Comission were false or misleading.

Sincerely, Original signed by Darrell G. Eisenhut Harold R. Denton, Director Office o. Nuclear actor Regulation

DL a;cr .
  1. 1:DL flL \ gly GL ADOas:DL .Dh HThompson DD D nh t '

D-4 be on-85 6pB5 ( 6/4/85 6/p85 }/[/85 }/g /85 , /85 g(

7 Grr'/p*Og 99pu f (h4ff

{

DISTRIBUTION FOR GREEN TICKET # 000702 Docket File or Central File w/ orig. incoming ltr.

NRC PDR w/inc.

L PDR w/inc.

ED0 #000538 ED0 Rdg WDircks DEisenhut/HDenton JThoma (w/cy of incoming)

RIngram MJambor HThompson OELD ( L' ?""J DNottingham u ley # 0007027 /

TSpeis RMattson RVollmer WRussell BSnyder -

TMurley VStello JRoe TRehm GCunningham JTaylor Green Ticket File w/inc. & Ticket 416 Old Phillips

JUL 151995 Ms. Ellyn R. Weiss Union of Concerned Scientists 1346 Connecticut Avenue N. W.

Suite 1101 Washington, D. C. 20036

Dear Ms. Weiss:

The Commissioners have requested that I respond to your letter of April 18, 1985 concerning comments made by Mr. Clark of GPU Nuclear Corporation to the April 18, 1985 Comission meeting.

You challenged the validity of the statements made by Mr. Clark at the April 18 meeting which denied that the changes to the steam generator tube rupture procedures were made to account for the problems encountered in the steam generator tubes at TMI-1. You cited statements taken from pages 14 and 15 of the GPU Technical Data Report (TDR) 406 Rev. 3 to support a view that contrary to Mr. Clark's statements, there was a connection between the revised procedures and the steam generator tube problems at TMI-1. You further noted, that Mr. Clark was on distribution for the GPU TDR 406 and should have been knowledgeable about the document.

The primary sentence in TDR 406 which appears to contradict Mr. Clark's statements is as follows:

Since extensive circumferential cracking was discovered in approximately 1200 of the 31,000 tubes, it became clear that a revised set of procedures for dealing with both single and multiple SGTRs [ steam generator tube ruptures, should be developed.

From one perspective, this one sentence from the TDR is not wholly consistent with the statements made by Mr. Clark at the Comission meeting. However, the sentence could also be read as merely saying that GPU should be prepared for the possibility of a tube rupture accident because one could happen.

The TDR as a whole focuses on ways to improve procedures to handle tube rupture accidents; it does not promote reliance on such procedures to "accomodate" or " compensate for" degradation of the steam generators.

Mr. Clark's statements in question involve his responses to similar questions posed by different Comissioners during the course of his presentation at the April 18th Comission meeting on the TMI-1 steam generators. The Comissioners' questions were aimed at probing whether, as you allege, changes were made in plant operating procedures in order to account for the degraded condition of the TMI-1 steam generators. Mr. Clark denied that the changes were proposed for that reason, explaining, for example in response to Comissioner Zech: '

1 l

l

a -

We believe that the procedures we now have approved for TMI-1 are the proper procedures to use for the pl ant. That they provide greater protection of the public health and safety, and that they should be adopted regardless of steam generator condition. And in fact in many cases -- and I hesitate to say "all" because we have not gone back and looked -- we were looking at those changes in the procedures before the steam generator problem was even known....

They are not developed in order to accomodate [ sic] any concern about the steam generator. They are developed for other good and sufficient reasons independent of that.

This response can be found from a transcript of the meeting at 93.

Other applicable responses from Mr. Clark can be found in the same Transcript at 68-69, 72, 78-79, 101, and 108-109.

From our viewpoint, the TMI-1 steam generators have been returned to their original licensing basis and meet applicable requirements; and therefore the improved procedures are not necessary to account for any alleged degradation of the steoiti geilerators. Wa believe that the TMI-1 precedures are prudent procedures. In this regard, it is worth noting that, regardless of whether there is a history of steam generator tube degradation, a steam generator tube rupture (SGTR) is a design basis accident for which we expect a licensee to be prepared to respond. Both the NRC and industry have had under consideration improvements in responding to such accidents so as to minimize their consequences; and new Babcock & Wilcox SGTR guidelines for other plants are similar to those at TMI-1 in many respects. Our interest in the emergency procedures for handling a tube rupture at TMI-I was based primarily on the results of our review of the 1982 tube rupture event at the Ginna plant. (Refer to NUREG-0909 and NUREG-0916 for further details). In fact, as a .'asult of knowledge gained by the Ginna event we asked GPU Nuclear to review its procedures for dealing with a tube rupture accident. GPU Nuclear indicated that it was considering revisions to the procedure (Mr. Clark indicated at the Commission meeting that some changes were under consideration as early as 1979).

As described in our safety evaluation, NUREG-1019, we consider the present TMI-I procedures to be an improvement over the earlier procedures. Nonetheless, the staff could accept the earlier procedures as adequate.

Thus, notwithstanding the single anomalous statement in the TDR, we do not conclude that Mr. Clark's statements to the Comission were false or misleading.

Sincerely, Original signed by l Darrell G. Eisenhut I

Harold R. Denton, Director Office o Nuclear } actor Regulation l :DL a;cr 0 :DL- \ glD, ~ AD GL

DL as

!D h HThompson DD:DL D:NRR DEisenhut HDenton 85 6 85 _ 6/4/85 6/p85 }/(/85 6/ /85 6/ /85

DISTRIBUTION FOR GREEN TICKET # 000702 l

l l

Central File w/ orig, incoming ltr.

L PDR w/inc.

EDO #000538 EDO Rdg WDircks DEisenhut/HDenton JThoma (w/cy of incoming)

RIngram MJambor D f I?'"'#

DNottingham u ley # 0007027[Jf[

TSpeis RMattson i RVollmer WRussell-BSnyder TMurley VStello JRoe TRehm GCunningham JTaylor Green Ticket File w/inc. & Ticket 416 Old Phillips i

l

JUL 151985 Ms. Ellyn R. Weiss Union of Concerned Scientists 1346 Connecticut Avenue N. W.

Suite 1101 Washington, D. C. 20036

Dear Ms. Weiss:

The Commissioners have requested that I respond to your letter of April 18, 1985 concerning consents made by Mr. Clark of GPU Nuclear Corporation to the April 18, 1985 Commission meeting.

You challenged the validity of the statements made by Mr. C1srk at the April 18 meeting which denied that the changes to the steam generator tube rupture procedures were made to account for the problems encountered in the steam generator tubes at TMI-1. You cited statements taken from pages 14 and 15 of the GPU Technical Data Report (TDR) 406 Rev. 3 to support a view that contrary to Mr. Clark's statements, there was a connection between the revised procedures and the steam generator tube problems at TMI-1. You further noted, that Mr. Clark was on distribution for the GPU TDR 406 and should have been knowledgeable about the document.

The primary sentence in TDR 406 which appears to contradict Mr. Clark's statements is as follows:

Since extensive circumferential cracking was discovered in approximately 1200 of the 31,000 tubes, it became clear that a revised set of procedures for dealing with both sincle and multiple SGTRs [ steam generator tube ruptures should be developed.

From one perspective, this one sentence from the TDR is not wholly consistent with the statements made by Mr. Clark at the Commission meeting. However, the sentence could also be read as merely saying that GPU should be prepared for the possibility of a tube rupture accident because one could happen.

The TDR as a whole focuses on ways to improve procedures to handle tube rupture accidents; it does net promote reliance on such procedures to "accommodata" or " compensate tor" degradation of the steam generators.

Mr. Clark's statements in question involve his responses to similar questions posed by different Commissioners during the course of his presentation at the April 18th Commission meeting on the TMI-1 steam generators. The Commissioners' questions were aimed at probing whether, as you allege, changes were made in plant operating procedures in order to account for the degraded condition of the TMI-1 steam generators. Mr. Clark denied that the changes were proposed for that reason, explaining, for example in response to Commissioner Zech:

We believe that the procedures we now have approved for TMI-1 are the proper procedures to use for the pl ant. That they provide greater protection of the public health and safety, and that they should be adopted regardless of steam generator condition. And in fact in many cases -- and I hesitate to say "all" because we have not gone back and looked -- we were looking at those changes in the procedures before the steam generator problem was even known....

They are not developed in order to accomodate [ sic] any concern about the steam generator. They are developed for other good and sufficient reasons independent of that.

This response can be found from a transcript of the meeting at 93.

Other applicable responses from Mr. Clark can be found in the same Transcript at 68-69, 72, 78-79, 101, and 108-109.

From our viewpoint, the TMI-1 steam generators have been returned to their original licensing basis and meet applicable requirements; and therefore the improved procedures are not necessary to account for any alleged degradation of the steam generators. We believe that the TMI-1 procedures are prudent procedures. In this regard, it is worth noting that, regardless of whether there is a history of steam generator tube degradation, a steam generator tube rupture (SGTR) is a design basis accident for which we expect a licensee to be prepared to respond. Both the NRC and industry have had under consideration improvements in responding to such accidents so as to minimize their consequences; and new Babcock & Wilcox SGTR guidelines for other plants are similar to those at TMI-1 in many respects. Our interest in the emergency procedures for handling a tube rupture at TMI-1 was based primarily on the results of our review of the 1982 tube rupture event at the Ginna plant. (Refer to NUREG-0909 and NUREG-0916 for further details). In fact, as a result of knowledge gained by the Ginna event we asked GPU Nuclear to review its procedures for dealing with a tube rupture accident. GPU Nuclear indicated that it was considering revisions to the procedure (Mr. Clark indicated at the Commission meeting that some changes were under consideration as early as 1979).

As described in our safety evaluation, NUREG-1019, we consider the present TMI-1 procedures to be an improvement over the earlier procedures. Nonetheless, the staff could accept the earlier procedures as adequate.

Thus, notwithstanding the single anomalous statement in the TDR, we do not conclude that Mr. Clark's statements to the Conunission were false or misleading.

Sincerely, i Original signed by Darrell C. Eisenhut i Harold R. Denton, Director j actor Regulation

(\_A)ffice o Nuclear l OR :DL a;cr hJ1

DL $ gD,.~ AD GL
DL as RDh HThompson DD:DL D:NRR DEisenhut HDenton 85 6 85 _ 6/27/85 6/p85 }/ ( /85 6/ /85 6/ /85 i

r

1. .
  • DISTRIBUTION FOR GREEN TICKET # 000702 Docket File or Central File w/ orig. incoming ltr.

NRC PDR w/inc.

Q PDR M EDO #000538 EDO Rdg WDircks DEisenhut/HDenton JThoma (w/cy of incoming)

RIngram MJambor HThompson OELD &'1"*",J)

DNottingham L 1ey # 0007027[3f[

T5peis-RMattson RVollmer WRussell BSnyder TMurley VStello JRoe TRehm GCunningham JTaylor Green Ticket File w/inc. & Ticket 416 Old Phillips l

1

$ , ,j h L.

3

, o, h. NUCLEAR REGULATORY UNITED STATES COMMISSION j

P .,Ec. ~

2 WASHINGTON, D. C. 20555

%,*****/

EDO PRINCIPAL CORRESPONDENCE CONTROL l

FROM: DUE: p1185 l l O CONTROL: 000702 s

s_ DOC DT: 06/07/85'

\

SAMUEL J. CHILK FINAL REPLY:'

SECY f/

TO:

DIRCKS FOR SIGNATURE OF: ** GREEN ** SECY NO:

DENTON -

l DESC: ROUTING:

REQUEST STAFF PREPARE APPROPRIATE RESPONSE TO DIRCKS' 4/18/85 LETTER FROM ELLYN WEISS, UCS RE TMI-1 ROE -

STEAM GENERATOR TUBE RUPTURE REHM /

STELLO' DATE: 06/10/85 GCUNNINGHAM /

ASSIGNED TO: NRR CONTACT: DENTON TAYLOR

_. MURLEYe SPECIAL INSTRUCTIONS OR REMARKS:

NRR: RECEIVED: ;06/10/85-ACTION: .-DL, H. THOMPSON-N  %'ao ROUTING: DENTON/EISENHUT PPAS O