ML20141C845: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
| project = TAC:59962, TAC:59963, TAC:62779, TAC:62780
| stage = Other
}}
}}


Line 37: Line 39:
                       " Analysis of Capsule from the Duke Power Company McGuire Unit 2 Reactor Vessel Radiation Surveillance Program", WCAP-11029.
                       " Analysis of Capsule from the Duke Power Company McGuire Unit 2 Reactor Vessel Radiation Surveillance Program", WCAP-11029.
Please note that in Section 7 of the report, a revise capsule removal schedule is recommended.      It is noted that Capsule V was removed in lieu of Capsule U as required by Technical Specification Table 4.4.5.      The revised schedule accounts for this. A proposed Technical Specification revision is in the process of being developed which will reflect the new pressure-temperature limits as well as the revised schedule.
Please note that in Section 7 of the report, a revise capsule removal schedule is recommended.      It is noted that Capsule V was removed in lieu of Capsule U as required by Technical Specification Table 4.4.5.      The revised schedule accounts for this. A proposed Technical Specification revision is in the process of being developed which will reflect the new pressure-temperature limits as well as the revised schedule.
Please note that my letter dated April 5, 1985 provided the capsule report for Unit 1 and indicated that revised pressure-temperature limit curves                      I would be submitted. It is Duke's intention to submit proposed technical specifications for both units in summer 1986.
Please note that my {{letter dated|date=April 5, 1985|text=letter dated April 5, 1985}} provided the capsule report for Unit 1 and indicated that revised pressure-temperature limit curves                      I would be submitted. It is Duke's intention to submit proposed technical specifications for both units in summer 1986.
Please feel free to contact us if you require any additional information.
Please feel free to contact us if you require any additional information.
Very truly yours,
Very truly yours,

Latest revision as of 13:57, 12 December 2021

Forwards Nonproprietary WCAP-11029, Analysis of Capsule V from Duke Power Co,Mcguire Unit 2,Reactor Vessel Radiation Surveillance Program. Revised Capsule Removal Schedule Recommended
ML20141C845
Person / Time
Site: Mcguire
Issue date: 04/02/1986
From: Tucker H
DUKE POWER CO.
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20141C848 List:
References
TAC-59962, TAC-59963, TAC-62779, TAC-62780, NUDOCS 8604070324
Download: ML20141C845 (2)


Text

_

. i V

O*

< DUKE Powna GOMPANY P.O. HOK 33180 CHAHLOTTE, N.C. 28242 HALB. TUCKER Traspuosa m mm m po4) ara-4nas mm.mou-April 2, 1986 1

l

[Nr$ Harold'RTDealtos, Director {

~~0ffice'of' Nucle'ar Reactor Regulation

~

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ,

l ATTENTION: B.J. Youngblood, Director PWR Project Directorate #4 '

Subject:

McGuire Nuclear Station, Unit 2 Docket No. 50-370 1

l l

Dear Mr. Denton:

. Pursuant to 10 CFR50, Appendix H, please find attached a report entitled

" Analysis of Capsule from the Duke Power Company McGuire Unit 2 Reactor Vessel Radiation Surveillance Program", WCAP-11029.

Please note that in Section 7 of the report, a revise capsule removal schedule is recommended. It is noted that Capsule V was removed in lieu of Capsule U as required by Technical Specification Table 4.4.5. The revised schedule accounts for this. A proposed Technical Specification revision is in the process of being developed which will reflect the new pressure-temperature limits as well as the revised schedule.

Please note that my letter dated April 5, 1985 provided the capsule report for Unit 1 and indicated that revised pressure-temperature limit curves I would be submitted. It is Duke's intention to submit proposed technical specifications for both units in summer 1986.

Please feel free to contact us if you require any additional information.

Very truly yours,

.Y lfh Hal B. Tucker i RLG/jgm h4070324860402 p ADOCK 05000370 I Attachments PDR {(

3 Mr. Harold R. Denton April 2, 1986 Page 2 xc: w/o attachment Dr. J. Nelson Grace, Reg. Admin.

U.S. Nuclear Regulatory Commission l

Region II 101 Marietta Street, NW, Suite 2900  ;

Atlanta, Georgia 30323 '

Mr. Darl Hood, Project Manager Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. W.T. Orders NRC Resident Inspector McGuire Nuclear Station L_