ML19259C160: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
  .
f i
f i
l OPERATING DATA REPORT                                                          i DOCKET NO. I            h          "
l OPERATING DATA REPORT                                                          i DOCKET NO. I            h          "
* DATE      6-2-/9 COMPLETED BY        R. Stancil TELEPHONE      012-537-9444 OPERATING STATUS
DATE      6-2-/9 COMPLETED BY        R. Stancil TELEPHONE      012-537-9444 OPERATING STATUS
                                                                                                               .            . C Hatch - 2                                      N*t'5                                                '
                                                                                                               .            . C Hatch - 2                                      N*t'5                                                '
.      1. Unit Name:                                                                                .
.      1. Unit Name:                                                                                .
Line 31: Line 30:
: 7. Maximum Dependable Capacity (Net MWe):          716
: 7. Maximum Dependable Capacity (Net MWe):          716
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
-
-
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions. If Any:
: 10. Reasons For Restrictions. If Any:
.
~
~
                                                                                                          .
This Month          Yr to-Date          Cumulatise
This Month          Yr to-Date          Cumulatise
: 11. Hours In Reporting Period                                744                3623                  8040
: 11. Hours In Reporting Period                                744                3623                  8040
Line 54: Line 49:
: 23. Unit Forced Outage Rate                                    98.6                90.4                    64.0
: 23. Unit Forced Outage Rate                                    98.6                90.4                    64.0
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duntion of Eacht:
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duntion of Eacht:
                                                                                                                                  .
_
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Status IPrior to Commercial Operation):                      Forecast            Achiesed INITIA L CRITICALITY                                                        7~4-70 INITIA L ELECTRICITY                                                        9-22-78 COMMERCIAL OPERATION                                      7 I-79
: 26. Units In Test Status IPrior to Commercial Operation):                      Forecast            Achiesed INITIA L CRITICALITY                                                        7~4-70 INITIA L ELECTRICITY                                                        9-22-78 COMMERCIAL OPERATION                                      7 I-79 2285 106            .
                '
2285 106            .
(9/771 7006120 @ 9,              ,
(9/771 7006120 @ 9,              ,


_. . . . _ . . _ . . . . . . .        . . . . . _ . _                  ,
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.        50-366              ;
                                                                                                                              '
l
.
                                                                                        .
AVERAGE DAILY UNIT POWER LEVEL
                                            .
                                                                                                                                ,
                                                                                                                                !
DOCKET NO.        50-366              ;
Hatch - 2        't
Hatch - 2        't
                                                                               .                      UNIT                  4 DATE  6-2-79 i
                                                                               .                      UNIT                  4 DATE  6-2-79 i
COMPLETED BY        R. Stancil TELEPHONE        912-537-9444      d l
COMPLETED BY        R. Stancil TELEPHONE        912-537-9444      d l
l
l MONTli            ADPil 1979 l
  '
                                              '
MONTli            ADPil 1979 l
1 DAY      AVERAGE DAILY POWER LEVEL                            DAY        AVERAGE DAILY POWER LEVEL (MWe-Net)                                                  (MWe-Net)                                  'I I                      -5          .
1 DAY      AVERAGE DAILY POWER LEVEL                            DAY        AVERAGE DAILY POWER LEVEL (MWe-Net)                                                  (MWe-Net)                                  'I I                      -5          .
7                      -5                                  1 2                      -5                                    is                      -5 3                      -5                                    g9                      -4 s                                                    .
7                      -5                                  1 2                      -5                                    is                      -5 3                      -5                                    g9                      -4 s                                                    .
4                      -5                                    20                        *4 5                      -5                                    21                      ~4 6                      -5                                    22                      -5 7                      -5                                    23                        -4 8                        -6                                    24                      -5 9                        -5                                  25                        -4 10                        -5                                  26                        -4 11                        -5                                  27                        -5 12                        -5                                  23                      -11 13                        -5                                  29                      -13 14                        -5                                  30                      -l4 15                        -6                                  31                      - 30 16                        -5
4                      -5                                    20                        *4 5                      -5                                    21                      ~4 6                      -5                                    22                      -5 7                      -5                                    23                        -4 8                        -6                                    24                      -5 9                        -5                                  25                        -4 10                        -5                                  26                        -4 11                        -5                                  27                        -5 12                        -5                                  23                      -11 13                        -5                                  29                      -13 14                        -5                                  30                      -l4 15                        -6                                  31                      - 30 16                        -5 INSTRUCTIONS                                                                                                          -
                                                                                                                              .
INSTRUCTIONS                                                                                                          -
On this format. list the average daay unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
On this format. list the average daay unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
pit 77 )
pit 77 )
              .
2285 107
2285 107
                                                                                .


                                                                                                                                                        .
DOCKET NO.        50-366 UNIT SilUTDOWNS AND POWER REDUCTIONS                          UNIT NAME        liatch - 2 DATE      6-2-7 COMPLETED BY          R. Stancil REPORT MON DI    Anril                                TELEPilONE        912-537-9444
                  .
DOCKET NO.        50-366 UNIT SilUTDOWNS AND POWER REDUCTIONS                          UNIT NAME        liatch - 2 DATE      6-2-7 COMPLETED BY          R. Stancil
      -
REPORT MON DI    Anril                                TELEPilONE        912-537-9444
                                                       .  "k                                -
                                                       .  "k                                -
b                      Cause & Curreceive
b                      Cause & Curreceive
                            -
                                       .E E        3g    hYh jg5 Licensee      E%          843                          Action to No.        Date      h      pg                            Event      u3
                                       .E E        3g    hYh jg5 Licensee      E%          843                          Action to No.        Date      h      pg                            Event      u3
                                                                                 <E U                                Psevent Recurrence
                                                                                 <E U                                Psevent Recurrence
* g$ E        5    jdg        Repor #                  fU 0                                          l
* g$ E        5    jdg        Repor #                  fU 0                                          l 733.9        A      3        50-366/79-26  CD        liANGER        MSIV Test'- Cold shutdown 1      790301        F due to damage N
_
N                                                                                                                  4 3
                                                                                                        .
733.9        A      3        50-366/79-26  CD        liANGER        MSIV Test'- Cold shutdown 1      790301        F due to damage
                                                                                                    .
    .                                                                                                                                        .
  .
                                                                                              .
N N                                                                                                                  4 3
C0  l                    3 Method:                                Exhibie G-Insieuciions      ,
C0  l                    3 Method:                                Exhibie G-Insieuciions      ,
LT1    F: Forced            Reason:                                                                                    for Prepasation of Data S; Sdieduled          A. Equipment Failure (Explain)                      14fanual 24f anual Scram.                      Epiry Sheets foi Licensee
LT1    F: Forced            Reason:                                                                                    for Prepasation of Data S; Sdieduled          A. Equipment Failure (Explain)                      14fanual 24f anual Scram.                      Epiry Sheets foi Licensee
Line 114: Line 77:
C Refueling                                        3 Autonnaie Scram.
C Refueling                                        3 Autonnaie Scram.
O                            D-Itegulatory Resteiction 4-Other (E xplain)                    0161) m                            E-Ope:ator Training & Liccuse Examination 5
O                            D-Itegulatory Resteiction 4-Other (E xplain)                    0161) m                            E-Ope:ator Training & Liccuse Examination 5
F. Ad nunist rative                                                                        Exlubit 1 - Same Souice G Operanional Essor (Explain) 01/77)                    Il-Other (Explain)
F. Ad nunist rative                                                                        Exlubit 1 - Same Souice G Operanional Essor (Explain) 01/77)                    Il-Other (Explain) fI              k i .. . _ . _ _ _ _ _ .
                        ,
fI              k i .. . _ . _ _ _ _ _ .


HATCH 2 SAFETY - RELATED MAINTENANCE REQUESTS TO 8E REPORYED FOR MAY 1979
HATCH 2 SAFETY - RELATED MAINTENANCE REQUESTS TO 8E REPORYED FOR MAY 1979 Number        Date Completed              Description 4-28-79                    Mounted SWs lights and terminal 78-4580 strip to implement DCR-78,-349            ;
:
                                              -
                                                                                        -
Number        Date Completed              Description 4-28-79                    Mounted SWs lights and terminal 78-4580 strip to implement DCR-78,-349            ;
5-5-79                      Performed 5 year replacement of 78-4967 squib valve cartridges per HNP-
5-5-79                      Performed 5 year replacement of 78-4967 squib valve cartridges per HNP-
                                             .2-6798 5-17-79                        Installed thermocouple per temp.
                                             .2-6798 5-17-79                        Installed thermocouple per temp.
79-18 OCR-78-477
79-18 OCR-78-477 79-254        1-29-79                      Set refueling bridge grapple set-point per DCR-79-26 and HNP-2-11001 79-337    s    5-20-79                      Rerouted cable and conduft to P41-F30'3B per DCR-79-48 79-345        2-14-79                        Set refueling bridge grapple set-point per DCR-79-26 and HNP-2-11001 4-25-79                        Removed and replaced mainsteam 79-750 safety valves for repair 79-800        5-1-79                        Installed 2 additional drive flow delta P transmitters per DCR-79-59 79-801        5-1-79                        Installed 2 additional drive flow delta P transmitters per CCR-79-59 79-1033        5-14-79                      Fabricated frames and mounted MK GLE per DCR-78-419 4-28-79                        Removed and shipped SRV disch.
                      '
79-254        1-29-79                      Set refueling bridge grapple set-point per DCR-79-26 and HNP-2-11001
-
79-337    s    5-20-79                      Rerouted cable and conduft to P41-F30'3B per DCR-79-48 79-345        2-14-79                        Set refueling bridge grapple set-point per DCR-79-26 and HNP-2-11001 4-25-79                        Removed and replaced mainsteam 79-750 safety valves for repair 79-800        5-1-79                        Installed 2 additional drive flow delta P transmitters per DCR-79-59 79-801        5-1-79                        Installed 2 additional drive flow delta P transmitters per CCR-79-59 79-1033        5-14-79                      Fabricated frames and mounted MK GLE per DCR-78-419 4-28-79                        Removed and shipped SRV disch.
79-1062                                        line vacuum breakers for repair 5-14-79                        Replaced main steam safety relief 79-1375 valve bodies 5-15-79 Fabrica.ted mounting blocks for 79-1614 accelerometers for main steam        -
79-1062                                        line vacuum breakers for repair 5-14-79                        Replaced main steam safety relief 79-1375 valve bodies 5-15-79 Fabrica.ted mounting blocks for 79-1614 accelerometers for main steam        -
safety relief valves per DCR-78-442 79-1881        5-10-79                        Installed reworked main steam rel-ief valve vacuum breakers 2285 109
safety relief valves per DCR-78-442 79-1881        5-10-79                        Installed reworked main steam rel-ief valve vacuum breakers 2285 109
       ~
       ~
                                            -
                                                  .
e
e


.
                                    .
Number    Date Completed Description 79-1961  5-10-79        Calibrated RPS pressure SIVs on          ..
Number    Date Completed Description 79-1961  5-10-79        Calibrated RPS pressure SIVs on          ..
                           ,EHC fluid per HNP-2-5279              ,
                           ,EHC fluid per HNP-2-5279              ,
79-2165  5-9-79          Installed temp. drive flow trans-mitter per DCR-79-59
79-2165  5-9-79          Installed temp. drive flow trans-mitter per DCR-79-59
                                                  -
                                                     ,            C
                                                     ,            C
                .
           -                2285 110 m
                                                              '
e 9
           -                2285 110
                                                                    .
m e
9
                                                                    -


  ..
,
Narrative Report Hatch - 2                                              .
Narrative Report Hatch - 2                                              .
_.
                                                                                      -
May 1, 1979            Cold shut down due to MSIV test damage May 23,1979            Rx critical at 1240 CST
May 1, 1979            Cold shut down due to MSIV test damage May 23,1979            Rx critical at 1240 CST
                                                                           ~
                                                                           ~
                                                                             -          0 May 31, 1979            Unit on line    1353 CST There was no single release of radioactivity or single radiation exposure which accounts for more than 10 per cent of the allowable annual values during the
                                                                             -          0 May 31, 1979            Unit on line    1353 CST There was no single release of radioactivity or single radiation exposure which accounts for more than 10 per cent of the allowable annual values during the month of May.
                          '
2285      111 I}}
month of May.
                  '
2285      111
                                                              .
I}}

Latest revision as of 22:07, 1 February 2020

Monthly Operating Rept for May 1979
ML19259C160
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/02/1979
From: Stancil R
GEORGIA POWER CO.
To:
Shared Package
ML19259C159 List:
References
NUDOCS 7906120429
Download: ML19259C160 (6)


Text

-

f i

l OPERATING DATA REPORT i DOCKET NO. I h "

DATE 6-2-/9 COMPLETED BY R. Stancil TELEPHONE 012-537-9444 OPERATING STATUS

. . C Hatch - 2 N*t'5 '

. 1. Unit Name: .

. 2. Reporting Period: May 1979

' 3. Licensed Thermal Power (MWt): 2436

4. Nameplate Rating (Gross MWe): 817 -
5. Design Electrical Ratin2 (Net MWe): 784
6. Maximum Dependable Capacity (Gross MWe): 749
7. Maximum Dependable Capacity (Net MWe): 716
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions. If Any:

~

This Month Yr to-Date Cumulatise

11. Hours In Reporting Period 744 3623 8040
12. Number Of Houn Reactor Was Critical 83.3 425.2 3057.7
13. Reactor Reserve Shutdown Houn 0 0- 0
14. Houn Genentor On.Line 10.1 293.5 1670.1
14. Unit Reserve Shutdown Houn 0 -0 0
16. Gross Thermal Energy Generated (MWH) 14 W 4151I5 2421056
17. Cros Electrical Energy Cenerated (MWH) 1110 ._, 114550 651150
18. Net Electrical Energy Genented (MWH) -3273 91835 585367. _
19. Unit Service Factor I.4 7.8 20 R
20. Unit Availability Factor 1.4 7.8 20.8
21. Unit Capacity Factor (Using MDC et) 0 _

3.5 10.2

22. Unit Capacity Factor iUsing DER Net) 0 3.2 9.3
23. Unit Forced Outage Rate 98.6 90.4 64.0
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duntion of Eacht:
25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status IPrior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY 7~4-70 INITIA L ELECTRICITY 9-22-78 COMMERCIAL OPERATION 7 I-79 2285 106 .

(9/771 7006120 @ 9, ,

l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-366  ;

Hatch - 2 't

. UNIT 4 DATE 6-2-79 i

COMPLETED BY R. Stancil TELEPHONE 912-537-9444 d l

l MONTli ADPil 1979 l

1 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 'I I -5 .

7 -5 1 2 -5 is -5 3 -5 g9 -4 s .

4 -5 20 *4 5 -5 21 ~4 6 -5 22 -5 7 -5 23 -4 8 -6 24 -5 9 -5 25 -4 10 -5 26 -4 11 -5 27 -5 12 -5 23 -11 13 -5 29 -13 14 -5 30 -l4 15 -6 31 - 30 16 -5 INSTRUCTIONS -

On this format. list the average daay unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

pit 77 )

2285 107

DOCKET NO. 50-366 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME liatch - 2 DATE 6-2-7 COMPLETED BY R. Stancil REPORT MON DI Anril TELEPilONE 912-537-9444

. "k -

b Cause & Curreceive

.E E 3g hYh jg5 Licensee E% 843 Action to No. Date h pg Event u3

<E U Psevent Recurrence

  • g$ E 5 jdg Repor # fU 0 l 733.9 A 3 50-366/79-26 CD liANGER MSIV Test'- Cold shutdown 1 790301 F due to damage N

N 4 3

C0 l 3 Method: Exhibie G-Insieuciions ,

LT1 F: Forced Reason: for Prepasation of Data S; Sdieduled A. Equipment Failure (Explain) 14fanual 24f anual Scram. Epiry Sheets foi Licensee

- 041aintenance or' Test Event Repost (LE Rn Fde (NURLG.

C Refueling 3 Autonnaie Scram.

O D-Itegulatory Resteiction 4-Other (E xplain) 0161) m E-Ope:ator Training & Liccuse Examination 5

F. Ad nunist rative Exlubit 1 - Same Souice G Operanional Essor (Explain) 01/77) Il-Other (Explain) fI k i .. . _ . _ _ _ _ _ .

HATCH 2 SAFETY - RELATED MAINTENANCE REQUESTS TO 8E REPORYED FOR MAY 1979 Number Date Completed Description 4-28-79 Mounted SWs lights and terminal 78-4580 strip to implement DCR-78,-349  ;

5-5-79 Performed 5 year replacement of 78-4967 squib valve cartridges per HNP-

.2-6798 5-17-79 Installed thermocouple per temp.

79-18 OCR-78-477 79-254 1-29-79 Set refueling bridge grapple set-point per DCR-79-26 and HNP-2-11001 79-337 s 5-20-79 Rerouted cable and conduft to P41-F30'3B per DCR-79-48 79-345 2-14-79 Set refueling bridge grapple set-point per DCR-79-26 and HNP-2-11001 4-25-79 Removed and replaced mainsteam 79-750 safety valves for repair 79-800 5-1-79 Installed 2 additional drive flow delta P transmitters per DCR-79-59 79-801 5-1-79 Installed 2 additional drive flow delta P transmitters per CCR-79-59 79-1033 5-14-79 Fabricated frames and mounted MK GLE per DCR-78-419 4-28-79 Removed and shipped SRV disch.

79-1062 line vacuum breakers for repair 5-14-79 Replaced main steam safety relief 79-1375 valve bodies 5-15-79 Fabrica.ted mounting blocks for 79-1614 accelerometers for main steam -

safety relief valves per DCR-78-442 79-1881 5-10-79 Installed reworked main steam rel-ief valve vacuum breakers 2285 109

~

e

Number Date Completed Description 79-1961 5-10-79 Calibrated RPS pressure SIVs on ..

,EHC fluid per HNP-2-5279 ,

79-2165 5-9-79 Installed temp. drive flow trans-mitter per DCR-79-59

, C

- 2285 110 m

e 9

Narrative Report Hatch - 2 .

May 1, 1979 Cold shut down due to MSIV test damage May 23,1979 Rx critical at 1240 CST

~

- 0 May 31, 1979 Unit on line 1353 CST There was no single release of radioactivity or single radiation exposure which accounts for more than 10 per cent of the allowable annual values during the month of May.

2285 111 I