f i

l OPERATING DATA REPORT i

h DOCKET NO. I DATE 6-2-/9 COMPLETED BY R. Stancil TELEPHONE 012-537-9444 OPERATING STATUS C

1. Unit Name:

Hatch - 2 N*t'5

2. Reporting Period:

May 1979

' 3. Licensed Thermal Power (MWt):

2436

4. Nameplate Rating (Gross MWe):

817

5. Design Electrical Ratin2 (Net MWe):

784 749

6. Maximum Dependable Capacity (Gross MWe):

716

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions. If Any:

~

This Month Yr to-Date Cumulatise 744 3623 8040

11. Hours In Reporting Period
12. Number Of Houn Reactor Was Critical 83.3 425.2 3057.7
13. Reactor Reserve Shutdown Houn 0

0-0

14. Houn Genentor On.Line 10.1 293.5 1670.1
14. Unit Reserve Shutdown Houn 0

-0 0

16. Gross Thermal Energy Generated (MWH) 14 W 4151I5 2421056
17. Cros Electrical Energy Cenerated (MWH) 1110 114550 651150
18. Net Electrical Energy Genented (MWH)

-3273 91835 585367. _

19. Unit Service Factor I.4 7.8 20 R
20. Unit Availability Factor 1.4 7.8 20.8 0
21. Unit Capacity Factor (Using MDC et) 3.5 10.2
22. Unit Capacity Factor iUsing DER Net) 0 3.2 9.3
23. Unit Forced Outage Rate 98.6 90.4 64.0
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duntion of Eacht:
25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status IPrior to Commercial Operation):

Forecast Achiesed 7~4-70 INITIA L CRITICALITY INITIA L ELECTRICITY 9-22-78 COMMERCIAL OPERATION 7 I-79 2285 106 (9/771 7006120 @ 9,

l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-366

't UNIT Hatch - 2 4

DATE 6-2-79 i

COMPLETED BY R. Stancil TELEPHONE 912-537-9444 d

l l

MONTli ADPil 1979 l

1 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

'I (MWe-Net)

(MWe-Net)

I

-5 7

-5 1

2

-5 is

-5 3

-5 g9

-4 s

4

-5 20

  • 4 5

-5

~4 21 6

-5 22

-5 7

-5

-4 23 8

-6 24

-5 9

-5 25

-4 10

-5

-4 26 11

-5 27

-5 12

-5 23

-11 13

-5

-13 29 14

-5

-l4 30 15

-6

- 30 31 16

-5 INSTRUCTIONS On this format. list the average daay unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

pit 77 )

2285 107

50-366 DOCKET NO.

UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME liatch - 2 DATE 6-2-7 COMPLETED BY R.

Stancil REPORT MON DI Anril TELEPilONE 912-537-9444 "k

b Cause & Curreceive

.E E 3

hYh Licensee E%

84 3

Action to No.

Date h

pg g

jg5 Event u3 fU g$ E 5

jdg Repor #

<E U Psevent Recurrence 0

l 1

790301 F

733.9 A

3 50-366/79-26 CD liANGER MSIV Test'- Cold shutdown due to damage N

N 3

4 C0 l

3 Method:

Exhibie G-Insieuciions LT1 F: Forced Reason:

14fanual for Prepasation of Data S; Sdieduled A. Equipment Failure (Explain) 041aintenance or' Test 24f anual Scram.

Epiry Sheets foi Licensee 3 Autonnaie Scram.

Event Repost (LE Rn Fde (NURLG.

C Refueling D-Itegulatory Resteiction 4-Other (E xplain) 0161)

Om E-Ope:ator Training & Liccuse Examination 5

F. Ad nunist rative Exlubit 1 - Same Souice G Operanional Essor (Explain) 01/77)

Il-Other (Explain) fI k i...

HATCH 2 SAFETY - RELATED MAINTENANCE REQUESTS TO 8E REPORYED FOR MAY 1979 Number Date Completed Description 78-4580 4-28-79 Mounted SWs lights and terminal strip to implement DCR-78,-349 78-4967 5-5-79 Performed 5 year replacement of squib valve cartridges per HNP-

.2-6798 79-18 5-17-79 Installed thermocouple per temp.

OCR-78-477 79-254 1-29-79 Set refueling bridge grapple set-point per DCR-79-26 and HNP-2-11001 79-337 s

5-20-79 Rerouted cable and conduft to P41-F30'3B per DCR-79-48 79-345 2-14-79 Set refueling bridge grapple set-point per DCR-79-26 and HNP-2-11001 79-750 4-25-79 Removed and replaced mainsteam safety valves for repair 79-800 5-1-79 Installed 2 additional drive flow delta P transmitters per DCR-79-59 79-801 5-1-79 Installed 2 additional drive flow delta P transmitters per CCR-79-59 79-1033 5-14-79 Fabricated frames and mounted MK GLE per DCR-78-419 79-1062 4-28-79 Removed and shipped SRV disch.

line vacuum breakers for repair 79-1375 5-14-79 Replaced main steam safety relief valve bodies Fabrica.ted mounting blocks for 79-1614 5-15-79 accelerometers for main steam safety relief valves per DCR-78-442 Installed reworked main steam rel-79-1881 5-10-79 ief valve vacuum breakers 2285 109

~

e

Number Date Completed Description 79-1961 5-10-79 Calibrated RPS pressure SIVs on

,EHC fluid per HNP-2-5279 79-2165 5-9-79 Installed temp. drive flow trans-mitter per DCR-79-59 C

2285 110 m

e 9

Narrative Report Hatch - 2 May 1, 1979 Cold shut down due to MSIV test damage May 23,1979 Rx critical at 1240 CST

~

0 May 31, 1979 Unit on line 1353 CST There was no single release of radioactivity or single radiation exposure which accounts for more than 10 per cent of the allowable annual values during the month of May.

2285 111 I