{{#Wiki_filter:March 4, 2015
[[Issue date::March 4, 2015]]
 
Mr. Eric Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077-0004


SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2014001 AND 05000412/2014001)
SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2014001 AND 05000412/2014001)

Revision as of 03:56, 18 May 2019

ROP 15 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2, (Report 05000334/2014001 and 05000412/2014001)
ML15062A379
Person / Time
Site: Beaver Valley
Issue date: 03/04/2015
From: Kennedy S R
NRC/RGN-I/DRP/PB6
To: Larson E A
FirstEnergy Nuclear Operating Co
KENNEDY, SR
Shared Package
ML15049A479 List:
References
IR 2014001
Download: ML15062A379 (5)


Text

March 4, 2015

SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2014001 AND 05000412/2014001)

Dear Mr. Larson:

On February 12, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Power Station, Unit Nos. 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs inspections at your facility. The NRC determined that overall, Beaver Valley Power Station, Unit Nos. 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Beaver Valley Power Station Unit Nos. 1 and 2 during the most recent quarter was wProcess (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60854.1, months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design--12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals, and to receive and review information relative to associated open items. This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The audit at your site has been scheduled for the week of July 20, 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. In accordance with Title 10 of the Code of Federal RegulationsPublic Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/ Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412 License Nos. DPR-66, NPF-73 Enclosure: Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML15062A379 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CBickett/ CAB SKennedy/ SRK DATE 02/ 18 /15 02/18/15 Page 1 of 2 01/22/2015 08:56:34 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteBeaver ValleyInspection / Activity Plan 01/01/2015

-06/30/2016 ISFSI-ISFSI DRY RUN AND INITIAL LOADING 3 1, 2 IP Preoperational Testing Of An ISFSI 60854 01/05/2015 01/09/2015 1, 2 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 01/05/2015 01/09/2015 1, 2 IP Operation Of An ISFSI 60855 01/12/2015 01/16/2015 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 01/12/2015 01/16/20157111111B-U2 REQUAL INSP W/ P/F RESULTS 2 2 IP Licensed Operator Requalification Program7111111B 06/15/2015 06/19/201571124-RAD SAFETY INSPECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/04/2015 05/08/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 05/04/2015 05/08/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/04/2015 05/08/2015 1, 2 IP Occupational Dose Assessment71124.04 05/04/2015 05/08/20157111108P-U1 INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 05/04/2015 05/15/2015 71003-LR COMMITMENTS PHASE I OUTAGE INSP 2 1 IP Post-Approval Site Inspection for License Renewal 7100305/11/2015 05/15/2015 PI&R-PI&R BIENNIAL 4 1, 2 IP Problem Identification and Resolution71152B 06/08/2015 06/12/2015 1, 2 IP Problem Identification and Resolution71152B 06/22/2015 06/26/2015 EP-EP PROGRAM INSPECTION 1 1, 2 IP A lert and Notification System Testing7111402 06/29/2015 07/02/2015 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 06/29/2015 07/02/2015 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 06/29/2015 07/02/201571124.07-RAD SAFETY INSPECTION 1 1, 2 IP Radiological Environmental Monitoring Program71124.07 07/06/2015 07/10/2015 1, 2 IP Performance Indicator Verification71151 07/06/2015 07/10/2015 TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION 6 1, 2 IP Fire Protection [Triennial]7111105T 08/03/2015 08/07/2015 1, 2 IP Fire Protection [Triennial]7111105T 08/17/2015 08/21/201512/7EXAM-U2 INITIAL OL EXAM 3 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAM U0190611/09/201511/13/2015 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAM U01906 12/07/2015 12/18/2015 71003-LR COMMITMENTS PHASE II TEAM INSP 4 1 IP Post-Approval Site Inspection for License Renewal 71003 08/31/2015 09/04/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 01/22/2015 08:56:34 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteBeaver ValleyInspection / Activity Plan 01/01/2015

-06/30/2016 71003-LR COMMITMENTS PHASE II TEAM INSP 4 1 IP Post-Approval Site Inspection for License Renewal 71003 09/14/2015 09/18/20157111108P-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 10/05/2015 10/16/201571124-RAD SAFETY INSP 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/19/2015 10/23/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 10/19/2015 10/23/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/19/2015 10/23/2015 1, 2 IP Occupational Dose Assessment71124.04 10/19/2015 10/23/2015 1, 2 IP Radiation Monitoring Instrumentation71124.05 10/19/2015 10/23/201571124-RAD SAFETY INSP 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 12/14/2015 12/18/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 12/14/2015 12/18/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 12/14/2015 12/18/2015 1, 2 IP Occupational Dose Assessment71124.04 12/14/2015 12/18/2015 1, 2 IP Performance Indicator Verification71151 12/14/2015 12/18/201571124-RAD SAFETY INSPECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/07/201603/11/2016 1, 2 IP Occupational Dose Assessment71124.04 03/07/201603/11/2016 EP-EP EXERCISE EVALUATION 4 1, 2 IP Exercise Evaluation7111401 06/13/2016 06/17/20167111107T-TRIENNIAL HEAT SINK 1 1, 2 IP Heat Sink Performance7111107T 05/16/2016 05/20/20167111117T-PERMANENT PLANT MODIFICATIONS 1 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/06/2016 06/10/2016 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/20/2016 06/24/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.