{{#Wiki_filter:REGULATOR INFORMATION DISTRIBUTION TEM (RIDS)ACCESSION NBRe8007170187
{{#Wiki_filter:REGULATOR                 INFORMATION DISTRIBUTION               TEM   (RIDS)
.DOC~DATES 8'/07/11 NOTARIZED:
ACCESSION NBRe8007170187                     . DOC DATES 8'/07/11
NO FACIL:50-r400 Shearon Harris Nuclear Power Plantr Unit 1<Carolina AUTH~NAME AUTHOR AFF ILIATION ZIMMERMANrS,R.
                                                      ~                NOTARIZED: NO                   DOCKET FACIL:50-r400 Shearon     Harris Nuclear Power Plantr Unit 1< Carolina                               05000r400 AUTH NAME
Carolina Power 8 Light Co, RECIP,NAME RECIPIENT AFFILIATION DENTON,H,R, Office of Nuclear Reactor Regulationr Director DOCKET 05000r400
        ~               AUTHOR AFF ILIATION ZIMMERMANrS,R.       Carolina Power 8 Light Co, RECIP,NAME           RECIPIENT AFFILIATION DENTON,H,R,         Office of Nuclear Reactor Regulationr Director


==SUBJECT:==
==SUBJECT:==
Forwards addi info re leak reduction program SER open, Item 10 (f)~DISTRIBUTION CODE: 8001S COPIES RECEIVED:LTiR ENCL TITLE: Licensing Submittal:
Forwards addi info re leak reduction program                                     response to NOTES'n  SER REC open, Item 10 DISTRIBUTION CODE: 8001S TITLE: Licensing Submittal: PSAR/FSAR Amdts IP IENT IO CODE/NAME (f) ~
PSAR/FSAR Amdts 8 Related NOTES'n response to SIZE+Correspondence REC IP IENT IO CODE/NAME NRR/DL/AOL NRR LB3 LA INTERNAL;ELO/HDS1 IE/DEPER/EPB 36 IE/DQA SIP/QAB21 NRR/OE/CEB 11 NRR/DE/EQB 13 NRR/OE/MEB 18 NRR/DE/SAB 2'RR/DHFS/HFEBrr0 NRR/DHFS/PSRB NRR/OS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23 RGN2 EXTERNAl: 'ACRS rr 1 DMB/DSS (AMDTS)LPOR 03 NSIC 05"COPIES LTTR ENCL 1 0 1 0 1 0 3 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 6 6 1 1 1 1 1 RECIPIENT ID CODE/NAME NRR LB3 BC BUCKLEYrB 01 IE FILE IE/OEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/OE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DS I/CSB 09 NRR/DS I/METB 12 NRR I/RAB 22 EQ F I Or4 MIB'NL(AMOTS ONLY)FEMA REP DIV 39 NRC POR 02 NTIS COPIES LTTR ENCL 1 0 1 1 1 1 1 0 1 1 2 2 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 TOTAL NUMBER OF COPIES REQUIRED e L'TTR 53 ENCL F6 tel IKI~'f.l X1,f ll I&ff, t~gt>>I 1)'rt'K>>f f>>>>fhff>>''1 lf)h>>C I K I>>I hrt I"lt,*lr>>i ,pat I 4~~~>>I>>~~<<<lrn" 0<<'hw5 Ir I>n C I.ptr,f n C'h f 5~C I>>I l I>><<~1 1 rfh)W OW O'W I>>K J n'hf 1, tr I P>>~>>I I f I'I fh>>>>r'.I hl I vlrJ I~CC>>)J I Crier>>I" KKC"<<>>1'1 if''I~K'II,-I'f f ,J I If I>>g 7,I Ihr f f t'h K hh ,I h K 1>>'I II*1<X=I a~'X 1>>ll11,'it<<h>>>>J l'X f Cllrh-*K>>Xi."X.-"''I I Q I.r'fK f h Kl l c.f If.KI~~I c ft M I>>>>1 h I'.ll~I>>IX I yI'i 1 t" I.~)I I'1 ig>>f'f t.h>>I C.h'
COPIES RECEIVED:LTiR "COPIES LTTR ENCL 8
@ME Carolina Power&Light Company JUL 11)984 SERIAL: NLS-84-294 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO>>50-400 LEAK REDUCTION PROGRAM
ENCL Related Correspondence RECIPIENT ID CODE/NAME SIZE+
COPIES LTTR ENCL NRR/DL/AOL                             1    0    NRR  LB3 BC                      1    0 NRR LB3 LA                           1    0    BUCKLEYrB            01          1 INTERNAL; ELO/HDS1                               1    0    IE FILE                          1 IE/DEPER/EPB 36                             3    IE/OEPER/IRB 35                  1    1 IE/DQA SIP/QAB21                       1    1    NRR/DE/AEAB                      1    0 NRR/OE/CEB       11                   1    1    NRR/DE/EHEB                      1    1 NRR/DE/EQB        13                  2    2   NRR/OE/GB          28            2    2 NRR/OE/MEB        18                  1    1    NRR/DE/MTEB          17          1     1 NRR/DE/SAB                            1    1    NRR/DE/SGEB          25 2'RR/DHFS/HFEBrr0 1    1    NRR/DHFS/LQB        32            1    1 NRR/DHFS/PSRB                          1    1    NRR/DL/SSPB                      1    0 NRR/OS  I/AEB 26                      1    1    NRR/DS I/ASB                     1    1 NRR/DSI/CPB      10                  1          NRR/DS I/CSB 09                   1    1 NRR/DSI/ICSB      16                  1          NRR/DS I/METB 12                 1 NRR/DSI/PSB      19                        1    NRR     I/RAB 22                 1    1 NRR/DSI/RSB    23                    1    1    EQ F I             Or4         1    1 RGN2                                  3                      MIB                   1    0 EXTERNAl: 'ACRS            rr 1                  6    6                ONLY)
                                                                              'NL(AMOTS DMB/DSS (AMDTS)                       1    1    FEMA REP   DIV 39 LPOR            03                    1    1    NRC POR             02 NSIC            05                          1    NTIS TOTAL NUMBER OF COPIES REQUIRED e L'TTR                     53   ENCL     F6


==Dear Mr.Denton:==
                                                                . l  X1                                                                                                ll tel IKI  ~
Carolina Power 6 fight Company (CP&L)hereby submits additional information concerning the Shearon Harris Nuclear Power Plant Leak Reduction Program.This information is in response to Safety Evaluation Report (SER)Open Item 14(f)from the Meteorology and Effluent Treatment Systems Branch.If you have further questions or require additional information, please feel free to contact me.Yours very truly, ESS/pgp (292NLU)S.R.mmerman anager Nuclear Licensing Section Attachment cc: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
f                          ,f                                                                                            I& ff, t  ~
Mr.Charles Willis (NRC-METB)
I      K      I      >>
Mr.J.P.O'Reilly (NRC-RII)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
C                      I  hrt I        "lt,            ~    ~
Chapel Hill Public Library Wake County Public Library Mr.Wells Eddleman Mr.John D.Runkle Dr.Richard D.Wilson Mr.G.O.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)8407170187 840711 PDR ADOCK 05000400 E PDR 411 Fayetteville Street o P.O.Box 1551 o Raleigh.N.C.27602
lr  >>i                                        >>    ~
~, 4aa H II Shearon Harris Nuclear Power Plant SER Open Item 14(f)TMI Action Plan Item III.D.1.1 Leak Reduction Pro ram~Oen Isee The gaseous waste processing system, the seal water return system, the demineralizers in the chemical and volume control system, the boron recycle system, the filter backwash system, and the fuel pool cooling and cleanup system are not included in the current leak reduction program proposed by CP&L.In addition, the SER stated that initial leak reduction program test results must be submitted to the NRC at least four months prior to fuel load.~Res ense: CP&L's leak reduction program was submitted to the NRC by a letter dated September 21, 1983.CP&L will supplement this leak reduction program to include the following components:
gt>> I  1  )'rt  '
-Gaseous Waste Processing System-Seal Mater Return System-Demineralizers in the Chemical and Volume Control System CP&L has reviewed its position on the other items and has determined that the following items do not belong in the III.D.1.1.
K>>f    f>>>>fhff>>''1 lf )h>>                                                  ,pat      I  4                      ~  >>I
leak reduction program for the reasons stated: Boron Rec cle S stem This system is batch operated.Effluent is received from the CVCS system into two 84,000 gallon recycle holdup tanks (RHT).The transfer of effluent from the RHT will not occur during the post accident phase.Treatment of the effluent in the RHT will not occur until the recovery phase, well after the post-accident phase.Actions at that time can be thoroughly planned and deliberate.
            ~ <<<lrn" 0<<'hw5    Ir I                            >n    C  I.ptr,f n      C  'h f            5  ~  C     I>>                                        ~  1 1    rfh I l                              I        >><<
Therefore, although we will include the RHT in the leak reduction program, the balance of the system need not be.Fuel Pool Coolin and Cleanu S stem The SER stated that this system should be leak tested to minimize leakage that might occur during a serious transient or accident (i.e.fuel handling accident).
) W OW O'W    I r'. I I vlrJ
The system is used to maintain water quality in the fuel pools and as such can reduce the contamination present in the fuel pools.However, the fuel pools do not have a significant inventory of radioactive material following a fuel handling accident since all noble gases are assumed to escape from the pool surface.This postulated accident, even when conservatively analyzed contributes only.02 microcuries of iodine per gram to the activity of the water.CP&L does not consider this to represent a highly contaminated system, especially within the context of TMI Item III.D.1.1.
  >>K J n 'hf 1, tr  I P>> ~>>
(292NLU/ccc)
I            I f I'I fh>>>>                                            hl  I  ~ CC>>) J I          Crier>> I"  KKC "<<>>        1'1   if''              I
                                                                                                                                                                        ~   K II, -I'f            f I
If
                                                              ,J I>>g    7,I      Ihr f                                          ,I h K                                                    ft 1>>    'I                                                          Kl l f                      II*  1
                                                        <X    =I                                                                              M t'            K
: c. f                I >>>>
a ~    'X    1>>ll11,                                               If
                                                                                                                    .KI  ~  ~              1 h    ~ I>>
h
                                                'it <<h>>>>J                                                                        I c
I hh l'    Xf    Cllrh      -   *K>>
Xi      ."X.-           "''I f
I Q                                                                          IX h                                                  '.ll I.r'fK I        t" I          .~)     I                                                                                              I yI          I '1  ig>>                                                                        C. h'
                                    'i 1                                                                           t.h>>
f          f


We conclude that this system need not be included in the leak reduction program.Filter Backwash S stem The filter backwash system is designed to collect materials back flushed from the filters within systems such as the chemical and volume control system.Filters which are part of systems included in the leak reduction program will be included in the boundary subject to the leak reduction program.Such filters are not in service during safety injection or recirculation and can be manually bypassed in the event the pressure drop becomes too great or during flushing operations.
                                        @ME Carolina Power & Light Company                SERIAL: NLS-84-294 JUL  11 )984 Mr. Harold R. Denton,    Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC    20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1  DOCKET NO>> 50-400 LEAK REDUCTION PROGRAM
The back flushing portions of the system are operated manually and the back flushing alignment exists for only short periods of time.Backflushing is not likely to occur following an accident since it would only tend to spread contamination.
 
Therefore, CP&L concludes that this system does not need to be included in the leak reduction program.None of these systems are required by NUREG 0737 Item III.D.1.1 to be included in the leak reduction program, and CP&L believes that no significant benefit would be derived from their inclusion.
==Dear Mr. Denton:==
Submittal Re uirements CP&L requests that the leak test results submittal requirement of"four months prior to fuel load" be reduced to"two months prior to fuel load." The four month requirement will prevent orderly coordination with other testing that will be taking place at that time.A two month requirement will allow orderly coordination with other requirements.
 
(292NLU/ccc) 0+r}}
Carolina Power 6 fight Company (CP&L) hereby submits additional information concerning the Shearon Harris Nuclear Power Plant Leak Reduction Program.
This information is in response to Safety Evaluation Report (SER) Open Item 14(f) from the Meteorology and Effluent Treatment Systems Branch.
If you  have  further questions or require additional information, please feel free to contact  me.
Yours very        truly, S. R.      mmerman anager Nuclear Licensing Section ESS/pgp  (292NLU)
Attachment cc:    Mr. B. C. Buckley (NRC)                              Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)                        Mr. John D. Runkle Mr. Charles Willis (NRC-METB)                          Dr. Richard D. Wilson Mr. J. P. O'Reilly (NRC-RII)                          Mr. G. O. Bright (ASLB)
Mr. Travis Payne (KUDZU)                              Dr. J. H. Carpenter (ASLB)
Mr. Daniel F. Read (CHANGE/ELP)                      Mr. J. L. Kelley (ASLB)
Chapel Hill Public Library Wake County Public Library 8407170187 840711 PDR ADOCK E
05000400 PDR 411 Fayetteville Street o P. O. Box 1551 o Raleigh. N. C. 27602
 
    ~, 4aa H
II
 
Shearon  Harris Nuclear Power Plant SER Open  Item 14(f)
TMI Action Plan Item III.D.1.1 Leak Reduction Pro      ram
~Oen  Isee The gaseous waste processing system, the seal water return system, the demineralizers in the chemical and volume control system, the boron recycle system, the filter backwash system, and the fuel pool cooling and cleanup system are not included in the current leak reduction program proposed by CP&L. In addition, the SER stated that initial leak reduction program test results must be submitted to the NRC at least four months prior to fuel load.
~Res ense:
CP&L's leak reduction program was submitted to the NRC by a letter dated September 21, 1983. CP&L will supplement this leak reduction program to include the following components:
Gaseous Waste Processing System Seal Mater Return System Demineralizers in the Chemical and Volume      Control System CP&L has    reviewed  its position  on the other items and has determined that the following items    do not belong  in the III.D.1.1. leak reduction  program for the reasons stated:
Boron Rec    cle  S stem This system    is batch operated. Effluent is received from the CVCS system into two 84,000    gallon recycle holdup tanks (RHT). The transfer of effluent from the RHT will not occur during the post accident phase. Treatment of the effluent in the RHT will not occur until the recovery phase, well after the post-accident phase. Actions at that time can be thoroughly planned and deliberate.
Therefore, although we will include the        RHT in the leak reduction program, the balance of the system need not be.
Fuel Pool Coolin      and Cleanu  S  stem The SER  stated that this system should be leak tested to minimize leakage that might  occur  during a serious transient or accident (i.e. fuel handling accident). The system is used to maintain water quality in the fuel pools and as such can reduce the contamination present in the fuel pools. However, the fuel pools do not have a significant inventory of radioactive material following a fuel handling accident since all noble gases are assumed to escape from the pool surface. This postulated accident, even when conservatively analyzed contributes only .02 microcuries of iodine per gram to the activity of the water. CP&L does not consider this to represent a highly contaminated system, especially within the context of TMI Item III.D.1.1.
(292NLU/ccc)
 
We conclude that     this   system need not be included in the leak reduction program.
Filter Backwash   S stem The filter backwash     system is designed to collect materials back flushed from the filters within     systems such as the chemical and volume control system.
Filters which are part of systems included in the leak reduction program will be included in the boundary subject to the leak reduction program.         Such filters   are not   in service during safety injection or recirculation and can be manually bypassed in the event the pressure drop becomes too great or during flushing operations. The back flushing portions of the system are operated manually and the back flushing alignment exists for only short periods of time. Backflushing is not likely to occur following an accident since it would only tend to spread contamination. Therefore, CP&L concludes that this system does not need to be included in the leak reduction program.
None of these systems are required by NUREG 0737 Item III.D.1.1 to be included in the leak reduction program, and CP&L believes that no significant benefit would be derived from their inclusion.
Submittal   Re uirements CP&L requests that the leak test results submittal requirement of "four months prior to fuel load" be reduced to "two months prior to fuel load." The four month requirement will prevent orderly coordination with other testing that will be taking place at that time. A two month requirement will allow orderly coordination with other requirements.
(292NLU/ccc)
 
0 +r}}

Latest revision as of 18:32, 3 February 2020

Forwards Addl Info Re Leak Reduction Program in Response to SER Open Item 14(f)
ML18018B715
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/11/1984
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
TASK-3.D.1.1, TASK-TM NLS-84-294, NUDOCS 8407170187
Download: ML18018B715 (8)


Text

REGULATOR INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBRe8007170187 . DOC DATES 8'/07/11

~ NOTARIZED: NO DOCKET FACIL:50-r400 Shearon Harris Nuclear Power Plantr Unit 1< Carolina 05000r400 AUTH NAME

~ AUTHOR AFF ILIATION ZIMMERMANrS,R. Carolina Power 8 Light Co, RECIP,NAME RECIPIENT AFFILIATION DENTON,H,R, Office of Nuclear Reactor Regulationr Director

SUBJECT:

Forwards addi info re leak reduction program response to NOTES'n SER REC open, Item 10 DISTRIBUTION CODE: 8001S TITLE: Licensing Submittal: PSAR/FSAR Amdts IP IENT IO CODE/NAME (f) ~

COPIES RECEIVED:LTiR "COPIES LTTR ENCL 8

ENCL Related Correspondence RECIPIENT ID CODE/NAME SIZE+

COPIES LTTR ENCL NRR/DL/AOL 1 0 NRR LB3 BC 1 0 NRR LB3 LA 1 0 BUCKLEYrB 01 1 INTERNAL; ELO/HDS1 1 0 IE FILE 1 IE/DEPER/EPB 36 3 IE/OEPER/IRB 35 1 1 IE/DQA SIP/QAB21 1 1 NRR/DE/AEAB 1 0 NRR/OE/CEB 11 1 1 NRR/DE/EHEB 1 1 NRR/DE/EQB 13 2 2 NRR/OE/GB 28 2 2 NRR/OE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/SAB 1 1 NRR/DE/SGEB 25 2'RR/DHFS/HFEBrr0 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/PSRB 1 1 NRR/DL/SSPB 1 0 NRR/OS I/AEB 26 1 1 NRR/DS I/ASB 1 1 NRR/DSI/CPB 10 1 NRR/DS I/CSB 09 1 1 NRR/DSI/ICSB 16 1 NRR/DS I/METB 12 1 NRR/DSI/PSB 19 1 NRR I/RAB 22 1 1 NRR/DSI/RSB 23 1 1 EQ F I Or4 1 1 RGN2 3 MIB 1 0 EXTERNAl: 'ACRS rr 1 6 6 ONLY)

'NL(AMOTS DMB/DSS (AMDTS) 1 1 FEMA REP DIV 39 LPOR 03 1 1 NRC POR 02 NSIC 05 1 NTIS TOTAL NUMBER OF COPIES REQUIRED e L'TTR 53 ENCL F6

. l X1 ll tel IKI ~

f ,f I& ff, t ~

I K I >>

C I hrt I "lt, ~ ~

lr >>i >> ~

gt>> I 1 )'rt '

K>>f f>>>>fhff>>1 lf )h>> ,pat I 4 ~ >>I

~ <<<lrn" 0<<'hw5 Ir I >n C I.ptr,f n C 'h f 5 ~ C I>> ~ 1 1 rfh I l I >><<

) W OW O'W I r'. I I vlrJ

>>K J n 'hf 1, tr I P>> ~>>

I I f I'I fh>>>> hl I ~ CC>>) J I Crier>> I" KKC "<<>> 1'1 if I

~ K II, -I'f f I

If

,J I>>g 7,I Ihr f ,I h K ft 1>> 'I Kl l f II* 1

<X =I M t' K

c. f I >>>>

a ~ 'X 1>>ll11, If

.KI ~ ~ 1 h ~ I>>

h

'it <<h>>>>J I c

I hh l' Xf Cllrh - *K>>

Xi ."X.- "I f

I Q IX h '.ll I.r'fK I t" I .~) I I yI I '1 ig>> C. h'

'i 1 t.h>>

f f

@ME Carolina Power & Light Company SERIAL: NLS-84-294 JUL 11 )984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO>> 50-400 LEAK REDUCTION PROGRAM

Dear Mr. Denton:

Carolina Power 6 fight Company (CP&L) hereby submits additional information concerning the Shearon Harris Nuclear Power Plant Leak Reduction Program.

This information is in response to Safety Evaluation Report (SER) Open Item 14(f) from the Meteorology and Effluent Treatment Systems Branch.

If you have further questions or require additional information, please feel free to contact me.

Yours very truly, S. R. mmerman anager Nuclear Licensing Section ESS/pgp (292NLU)

Attachment cc: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. John D. Runkle Mr. Charles Willis (NRC-METB) Dr. Richard D. Wilson Mr. J. P. O'Reilly (NRC-RII) Mr. G. O. Bright (ASLB)

Mr. Travis Payne (KUDZU) Dr. J. H. Carpenter (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Mr. J. L. Kelley (ASLB)

Chapel Hill Public Library Wake County Public Library 8407170187 840711 PDR ADOCK E

05000400 PDR 411 Fayetteville Street o P. O. Box 1551 o Raleigh. N. C. 27602

~, 4aa H

II

Shearon Harris Nuclear Power Plant SER Open Item 14(f)

TMI Action Plan Item III.D.1.1 Leak Reduction Pro ram

~Oen Isee The gaseous waste processing system, the seal water return system, the demineralizers in the chemical and volume control system, the boron recycle system, the filter backwash system, and the fuel pool cooling and cleanup system are not included in the current leak reduction program proposed by CP&L. In addition, the SER stated that initial leak reduction program test results must be submitted to the NRC at least four months prior to fuel load.

~Res ense:

CP&L's leak reduction program was submitted to the NRC by a letter dated September 21, 1983. CP&L will supplement this leak reduction program to include the following components:

Gaseous Waste Processing System Seal Mater Return System Demineralizers in the Chemical and Volume Control System CP&L has reviewed its position on the other items and has determined that the following items do not belong in the III.D.1.1. leak reduction program for the reasons stated:

Boron Rec cle S stem This system is batch operated. Effluent is received from the CVCS system into two 84,000 gallon recycle holdup tanks (RHT). The transfer of effluent from the RHT will not occur during the post accident phase. Treatment of the effluent in the RHT will not occur until the recovery phase, well after the post-accident phase. Actions at that time can be thoroughly planned and deliberate.

Therefore, although we will include the RHT in the leak reduction program, the balance of the system need not be.

Fuel Pool Coolin and Cleanu S stem The SER stated that this system should be leak tested to minimize leakage that might occur during a serious transient or accident (i.e. fuel handling accident). The system is used to maintain water quality in the fuel pools and as such can reduce the contamination present in the fuel pools. However, the fuel pools do not have a significant inventory of radioactive material following a fuel handling accident since all noble gases are assumed to escape from the pool surface. This postulated accident, even when conservatively analyzed contributes only .02 microcuries of iodine per gram to the activity of the water. CP&L does not consider this to represent a highly contaminated system, especially within the context of TMI Item III.D.1.1.

(292NLU/ccc)

We conclude that this system need not be included in the leak reduction program.

Filter Backwash S stem The filter backwash system is designed to collect materials back flushed from the filters within systems such as the chemical and volume control system.

Filters which are part of systems included in the leak reduction program will be included in the boundary subject to the leak reduction program. Such filters are not in service during safety injection or recirculation and can be manually bypassed in the event the pressure drop becomes too great or during flushing operations. The back flushing portions of the system are operated manually and the back flushing alignment exists for only short periods of time. Backflushing is not likely to occur following an accident since it would only tend to spread contamination. Therefore, CP&L concludes that this system does not need to be included in the leak reduction program.

None of these systems are required by NUREG 0737 Item III.D.1.1 to be included in the leak reduction program, and CP&L believes that no significant benefit would be derived from their inclusion.

Submittal Re uirements CP&L requests that the leak test results submittal requirement of "four months prior to fuel load" be reduced to "two months prior to fuel load." The four month requirement will prevent orderly coordination with other testing that will be taking place at that time. A two month requirement will allow orderly coordination with other requirements.

(292NLU/ccc)