| issue date = 04/11/1985
| issue date = 04/11/1985
| title = Responds to NRC 850312 Ltr Re Violations Noted in Insp Rept 50-400/85-04.Corrective actions:10 Awg Conductor Replaced Per Field Change Request FCR-E-4052
| title = Responds to NRC 850312 Ltr Re Violations Noted in Insp Rept 50-400/85-04.Corrective actions:10 Awg Conductor Replaced Per Field Change Request FCR-E-4052
| author name = PARSONS R M
| author name = Parsons R
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = GRACE J N
| addressee name = Grace J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000400
| docket = 05000400
Line 16: Line 16:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000400/1985004]]


=Text=
=Text=
{{#Wiki_filter:ML Exhibit ll"aroima Power&L.icnt omoan>P.O.Box 101 New Hill, North Carolina 27562 April 11, 1985 Dr.3.Nelson Grace Jnited States Nuclear Regulatory
{{#Wiki_filter:ML                                           Exhibit     ll "aroima Power & L.icnt omoan>
Commission
P. O. Box 101 New Hill, North Carolina 27562 April 11,   1985 Dr. 3. Nelson Grace                                                                         VRC-339 Jnited States Nuclear Regulatory Commission Region II 131 '.larietta Str et, Vorthw st (Suite 2900}
Region II 131'.larietta
.Atlanta, Georgia 30323
Str et, Vorthw st (Suite 2900}.Atlanta, Georgia 30323 VRC-339 Dear Dr.Crace: In reference to your letter of March 12, 1985, referring to Rll: GFM/RLP 50-000/85-04-02, the attached is Carolina Power 2 Light Company's reply to the violation identified
 
in Enclosure l.It is considered
==Dear Dr. Crace:==
that the corrective
 
action taken/planned
In reference to your letter of March 12, 1985, referring to Rll: GFM/RLP 50-000/85-04-02, the attached is Carolina Power 2 Light Company's reply to the violation identified in Enclosure         l.
is satisfactory
It is considered       that the corrective action taken/planned is satisfactory for resolution of the item.
for resolution
        'hank you for your consideration in this matter.
of the item.'hank you for your consideration
Yours very truly, R. M. Parsons Project General Manager Completion Assurance Shearon Harris Nuclear Power Plant RMP/sae Attachment cc:   Messrs. G. Maxwell/R. Prevatte (NRC-SHNPP)
in this matter.Yours very truly, R.M.Parsons Project General Manager Completion
Mr. B. C. Buckley (NRC)
Assurance Shearon Harris Nuclear Power Plant RMP/sae Attachment
                                                                                    'eI'E X-se7/1-OS       5
cc: Messrs.G.Maxwell/R.
 
Prevatte (NRC-SHNPP)
Dr. 3. '~elson Grac                                         'I <<C-339 bcc: Mr. H. R.~ Banks
Mr.B.C.Buckley (NRC)'eI'E X-se7/1-OS
            ~ ~
5  
Mr. T. A. Baxter (Shaw, Pittman, Potts 4 Trowbridge)
Mr. C. S. Bohanan Mr. H. W. Bowles Mr. C. Carmichael (2)
Dr.3.'~elson Grac'I<<C-339 bcc: Mr.H.R.Banks~~~Mr.T.A.Baxter (Shaw, Pittman, Potts 4 Trowbridge)
Mr. N 3. Chiangi Mr. A. B. utter Dr. T. 5, Elleman
Mr.C.S.Bohanan Mr.H.W.Bowles Mr.C.Carmichael
      '.Is. S. F. F! yni 4lr. 3. L. Harness
(2)Mr.N 3.Chiangi Mr.A.B.utter Dr.T.5, Elleman'.Is.S.F.F!yni 4lr.3.L.Harness'vlr.P.C.Hopkins Or.3.D.E.3effries Vlr.I.A.3ohnson Mr.L.I.Loflin Mr.R.E.Lumsden Mr.R.L.Mayton, 3r.Mr.S.McManus Mr.C.H.Moseley, 3r.Mr.D.L.Nordstrom (LIS)Mr.R.M.Parsons Mr.G.A.Sinders Mr.M.Shannon (Westinghouse)
      'vlr. P. C. Hopkins Or. 3. D. E. 3effries Vlr. I. A. 3ohnson Mr. L. I. Loflin Mr. R. E. Lumsden Mr. R. L. Mayton, 3r.
Mr.Sheldon D.Smith Mr.M.F.Thompson Mr.A.C.Tollison Mr.E.3.Wagner Mr.R.A.Watson Mr.3.L.Willis File: HI/A-2D File: H-X-0500 se7/2  
Mr. S. McManus Mr. C. H. Moseley, 3r.
Attachment
Mr. D. L. Nordstrom (LIS)
to CPRL Letter of Response to NRC Report RII: GFM/RLP 50-000/85-00-02
Mr. R. M. Parsons Mr. G. A. Sinders Mr. M. Shannon (Westinghouse)
Re rted Violation:
Mr. Sheldon D. Smith Mr. M. F. Thompson Mr. A. C. Tollison Mr. E. 3. Wagner Mr. R. A. Watson Mr. 3. L. Willis File: HI/A-2D File: H-X-0500 se7/2
10 CFR 50.55(f)(1)
 
requires CPRL tc implement the quality assurance program described or referenced
Attachment to CPRL Letter of Response to NRC Report RII: GFM/RLP 50-000/85-00-02 Re   rted Violation:
in the Preliminary
10 CFR 50.55(f)(1) requires CPRL tc implement the quality assurance program described or referenced in the Preliminary Safety Analysis Report. Section 1.8.5.3 of the PSAR (versus the Quality Assurance Program, as stated in the Notice of Violation) requires that measures be established and implemented for the selection and review for suitability of application of materials, parts, and equipment that are essential to the safety-relaxed functions.
Safety Analysis Report.Section 1.8.5.3 of the PSAR (versus the Quality Assurance Program, as stated in the Notice of Violation)
Contrary to the above, on 3anuary 28, l985, the Inspector identified an undersized electrical c ble in DC panei D. -IASA. This cable (No. 10$ 21A-SA) 'vas a xwo-condo-x r
requires that measures be established
(/IO AWG that has a maximum ampere rating of 20 amps. It was protected by a 100-ampere circuit breaker and supplied power to Auxiliary Transfer Panel lA-SA which had a loading of approximately 100 amps.         This cable had been installed and inspected in accordance with approved design documents and this unsatisfactory condition had not been identified.
and implemented
This is a Severity Level Y violation (Supplement II).
for the selection and review for suitability
Denial or Admission and Reason for the Violation:
of application
The violation is correct as stated.
of materials, parts, and equipment that are essential to the safety-relaxed
As complete information on load was unknown, an arbitrary size was chosen by HPES Electrical and was input into the cable routing system in order to assure an adequate route was available for the subject cable. The cable card was inadvertently released xo the field prior to final verification.
functions.
Corrective Ste     Taken and Results Achieved:
Contrary to the above, on 3anuary 28, l985, the Inspector identified
The subject /710 AWG conductor was replaced with a /72 AWG conductor per Field Change Request (F CR-E-0052).
an undersized
Corrective Ste   s Taken to Avoid Further Noncom liance:
electrical
Administrative instructions have been issued to HPES Electrical personnel to ensure closer monitoring and control of cable sized by HPES. In addition, a formal guideline procedure to place adequate control and verification requirements on cable sized by HPES is scheduled for issuance by April 30, 1985.
c ble in DC panei D.-IASA.This cable (No.10$21A-SA)'vas a xwo-condo-x
Date Vhen Full Com liance     Vill Be Achieved:
r (/IO AWG that has a maximum ampere rating of 20 amps.It was protected by a 100-ampere circuit breaker and supplied power to Auxiliary Transfer Panel lA-SA which had a loading of approximately
It is currently projected that full compliance will be achieved by April 30, 1985.
100 amps.This cable had been installed and inspected in accordance
se7/3}}
with approved design documents and this unsatisfactory
condition had not been identified.
This is a Severity Level Y violation (Supplement
II).Denial or Admission and Reason for the Violation:
The violation is correct as stated.As complete information
on load was unknown, an arbitrary size was chosen by HPES Electrical
and was input into the cable routing system in order to assure an adequate route was available for the subject cable.The cable card was inadvertently
released xo the field prior to final verification.
Corrective
Ste Taken and Results Achieved: The subject/710 AWG conductor was replaced with a/72 AWG conductor per Field Change Request (F CR-E-0052).
Corrective
Ste s Taken to Avoid Further Noncom liance: Administrative
instructions
have been issued to HPES Electrical
personnel to ensure closer monitoring
and control of cable sized by HPES.In addition, a formal guideline procedure to place adequate control and verification
requirements
on cable sized by HPES is scheduled for issuance by April 30, 1985.Date Vhen Full Com liance Vill Be Achieved: It is currently projected that full compliance
will be achieved by April 30, 1985.se7/3
}}

Latest revision as of 04:14, 22 October 2019

Responds to NRC 850312 Ltr Re Violations Noted in Insp Rept 50-400/85-04.Corrective actions:10 Awg Conductor Replaced Per Field Change Request FCR-E-4052
ML18018B947
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/11/1985
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18018B945 List:
References
CON-NRC-339 NUDOCS 8505210502
Download: ML18018B947 (4)


Text

ML Exhibit ll "aroima Power & L.icnt omoan>

P. O. Box 101 New Hill, North Carolina 27562 April 11, 1985 Dr. 3. Nelson Grace VRC-339 Jnited States Nuclear Regulatory Commission Region II 131 '.larietta Str et, Vorthw st (Suite 2900}

.Atlanta, Georgia 30323

Dear Dr. Crace:

In reference to your letter of March 12, 1985, referring to Rll: GFM/RLP 50-000/85-04-02, the attached is Carolina Power 2 Light Company's reply to the violation identified in Enclosure l.

It is considered that the corrective action taken/planned is satisfactory for resolution of the item.

'hank you for your consideration in this matter.

Yours very truly, R. M. Parsons Project General Manager Completion Assurance Shearon Harris Nuclear Power Plant RMP/sae Attachment cc: Messrs. G. Maxwell/R. Prevatte (NRC-SHNPP)

Mr. B. C. Buckley (NRC)

'eI'E X-se7/1-OS 5

Dr. 3. '~elson Grac 'I <<C-339 bcc: Mr. H. R.~ Banks

~ ~

Mr. T. A. Baxter (Shaw, Pittman, Potts 4 Trowbridge)

Mr. C. S. Bohanan Mr. H. W. Bowles Mr. C. Carmichael (2)

Mr. N 3. Chiangi Mr. A. B. utter Dr. T. 5, Elleman

'.Is. S. F. F! yni 4lr. 3. L. Harness

'vlr. P. C. Hopkins Or. 3. D. E. 3effries Vlr. I. A. 3ohnson Mr. L. I. Loflin Mr. R. E. Lumsden Mr. R. L. Mayton, 3r.

Mr. S. McManus Mr. C. H. Moseley, 3r.

Mr. D. L. Nordstrom (LIS)

Mr. R. M. Parsons Mr. G. A. Sinders Mr. M. Shannon (Westinghouse)

Mr. Sheldon D. Smith Mr. M. F. Thompson Mr. A. C. Tollison Mr. E. 3. Wagner Mr. R. A. Watson Mr. 3. L. Willis File: HI/A-2D File: H-X-0500 se7/2

Attachment to CPRL Letter of Response to NRC Report RII: GFM/RLP 50-000/85-00-02 Re rted Violation:

10 CFR 50.55(f)(1) requires CPRL tc implement the quality assurance program described or referenced in the Preliminary Safety Analysis Report. Section 1.8.5.3 of the PSAR (versus the Quality Assurance Program, as stated in the Notice of Violation) requires that measures be established and implemented for the selection and review for suitability of application of materials, parts, and equipment that are essential to the safety-relaxed functions.

Contrary to the above, on 3anuary 28, l985, the Inspector identified an undersized electrical c ble in DC panei D. -IASA. This cable (No. 10$ 21A-SA) 'vas a xwo-condo-x r

(/IO AWG that has a maximum ampere rating of 20 amps. It was protected by a 100-ampere circuit breaker and supplied power to Auxiliary Transfer Panel lA-SA which had a loading of approximately 100 amps. This cable had been installed and inspected in accordance with approved design documents and this unsatisfactory condition had not been identified.

This is a Severity Level Y violation (Supplement II).

Denial or Admission and Reason for the Violation:

The violation is correct as stated.

As complete information on load was unknown, an arbitrary size was chosen by HPES Electrical and was input into the cable routing system in order to assure an adequate route was available for the subject cable. The cable card was inadvertently released xo the field prior to final verification.

Corrective Ste Taken and Results Achieved:

The subject /710 AWG conductor was replaced with a /72 AWG conductor per Field Change Request (F CR-E-0052).

Corrective Ste s Taken to Avoid Further Noncom liance:

Administrative instructions have been issued to HPES Electrical personnel to ensure closer monitoring and control of cable sized by HPES. In addition, a formal guideline procedure to place adequate control and verification requirements on cable sized by HPES is scheduled for issuance by April 30, 1985.

Date Vhen Full Com liance Vill Be Achieved:

It is currently projected that full compliance will be achieved by April 30, 1985.