| issue date = 04/28/1986
| issue date = 04/28/1986
| title = Forwards Rev 1 to Shearon Harris Nuclear Power Plant Crdr Final Summary Rept & Addl Info Re Human Engineering Discrepancies Listed in Draft Lll Technical Evaluation Rept
| title = Forwards Rev 1 to Shearon Harris Nuclear Power Plant Crdr Final Summary Rept & Addl Info Re Human Engineering Discrepancies Listed in Draft Lll Technical Evaluation Rept
| author name = CUTTER A B
| author name = Cutter A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400
| docket = 05000400
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REQU RY INFORMATION DISTRIBU SYSTEM (RIDS)ACCESSION NBR: Sb05020184 DOC.DATE: 8b/04/28 NOTARIZED:
{{#Wiki_filter:REQU     RY INFORMATION     DISTRIBU       SYSTEM (RIDS)
NO DOCKET 0 FACIL: 50-400 Sheav'on Hav r is Nucleav Powev Planti Unit ii Cav ol ina 05000400 AUTH.NANE AUTHOR AFFILIATION CUTTERS A.B.Carolina Power 8r Light Co.RECIP.NAKE RECIPIENT AFFILIATION DENTQN, H.R.Of f ice of Nucleav Reactov Regulatiov)>
ACCESSION NBR: Sb05020184         DOC. DATE: 8b/04/28     NOTARIZED: NO           DOCKET 0 FACIL: 50-400 Sheav'on   Hav r is Nucleav Powev Planti Unit     ii Cav ol ina 05000400 AUTH. NANE         AUTHOR AFFILIATION CUTTERS A. B.       Carolina Power 8r Light Co.
Director<post 851125  
RECIP. NAKE         RECIPIENT AFFILIATION DENTQN, H. R.         f Of ice of Nucleav Reactov Regulatiov)>       Director <post   851125


==SUBJECT:==
==SUBJECT:==
Forwards Rev 1 to"Sheav on Harv is Nucleav Powev'lant CRDR Final Summary Rept" 5 addi info v e human engineering discv epancies listed in draft LLL technical evaluat'ion rept.DISTRIBUTION CODE: A003D COPIES RECEIVED: LTR J ENCL/SIZE: TITLE: OR/Licensing Submittal:
Forwards Rev 1 to "Sheav on Harv is Nucleav Powev'lant CRDR Final Summary Rept" 5 addi info v e human engineering discv epancies listed in draft LLL technical evaluat'ion rept.
Supp l 1 to NUREQ-0737<Generic Ltr 82-33)NOTES: Application f ov permit v enewal f i led.05000400 RECIPIENT ID CODE/NANE PWR-A ADTS PWR-A EICSB PMR-A PD2 LA BUCKLEY B PMR-A RSB'NTERNAL: ADN/LFI%NRR BWR ADTS NRR PWR-A ADTS NRR/DHFT/HFIB NRR/DSRO ESPRIT NRR/DSRO/RSIB RCN2 EXTERNAL: 24X NRC PDR COPIES LTTR ENCL fo Pu ic 1 10 1 io 1 1+1 io RECIP I ENT ID CODE/MANE PWR-A EB PWR-A FOB PWR-A PD2 PD PWR-A PSB IE/DEPER/EPB NRR PAULSONi W NRR PWR-B ADTS NRR/DHFT/NTB NRR/D/EIB 0 FILE LPDR NSIC COP IES LTTR ENCL 1 1~7 gt 3 1 1 2 1 1 io io TOTAL NUgBER OF COPIES REQUIRED: LTTR 40 ENCL TBit:)'30 i jH:O'"'U".I)TON BB<k~'38~~TAG.;,30(t PR EO.".<M(lv8 Q(}QQQ(jFO E;ri x<<t)rr~g k k 4g V sdfrfi J, I'<<'tdlg~9%rid]f), I l y j r r,t''rueq,~q>f~Y'JT, Tw<"i I.IA Hi'~<i/h.A3 i'r~i~L.J Pv'r<His)'I i.'f'.<1'i'".'
DISTRIBUTION CODE: A003D       COPIES RECEIVED: LTR   J   ENCL   / SIZE:
I;QYTAl.IY.",'lh
TITLE: OR/Licensing Submittal: Supp l       1 to NUREQ-0737<Generic Ltr 82-33)
'4'i-.l,~rIK,'.i;;~+5'g gc'H+.0 q);n:I g-, rj:Q~A~)sf t=s~u0'ill'ref:)69/'qrgutg 50 0>H 5~QR',i~ri;j'I r>>~u~re.i~:i<4 i-r,~t" ri~~rs.~c.'" af L~<<!3;~b.'~w o''G.ILGWU'rr~
NOTES: Application fov permit v enewal     fi led.                               05000400 RECIPIENT         COPIES            RECIP I ENT        COP  IES ID CODE/NANE       LTTR ENCL        ID CODE/MANE        LTTR ENCL PWR-A ADTS                     fo    PWR-A  EB                      1 PWR-A EICSB                   Pu    PWR-A  FOB                      1~
r'y,'>~'x pi"e rrcirir...
PMR-A PD2 LA                   ic    PWR-A  PD2 PD          7      gt BUCKLEY B               1    10    PWR-A  PSB PMR-A RSB               1    io
q r o~rr"*Ebb'~"f q~'-I Ite;, eau." J r~<<'i-t.f qs~vox f<>>J~i+~Ess'.rrrtvzf 3JJ>'3svb rrr b>feil..sr, irr:;iv i>~lb ll 3i fw,.J-'=)NB.'...hI"..I:GGVl3V'>Fi 83'i'I(IQ Gr"(i'0A;.~("'"'>
'NTERNAL: ADN/LFI%                               IE/DEPER/EPB            3 NRR BWR ADTS                         NRR PAULSONi W          1 NRR PWR-A ADTS                       NRR PWR-B ADTS          1 NRR/DHFT/HFIB                         NRR/DHFT/NTB            2 NRR/DSRO ESPRIT                       NRR/D    /EIB          1 NRR/DSRO/RSIB                           0 FILE                1 RCN2 EXTERNAL: 24X                       1     1+    LPDR                            io NRC PDR                  1     io     NSIC                           io TOTAL NUgBER OF COPIES REQUIRED: LTTR           40   ENCL
NOL II.'>'liATOXG (i,"C-'.".b'+.I
 
'r.>sri)Q)&#xc3;t M-QAFiUN of'.qquo'Lc$fi~,~~uQ prrj;.~i"a'>i'Jkgr):3JT'I'I'Q,'-
TBit:)'30                   i jH:O'"'U I )TON   ".
~()iz'l">be rii Leven'.>r f Lm~sq rr~%rm~" r;:>il'qqA:83IGN
BB < k~'38             ~~TAG .;,30(t             PR EO.".<M(lv8 Q(}QQQ(jFO           E;ri x <<t) rr   ~
".'3Z RG 5 I:)""~5t)'i.1 i TMB K'I K:3.3$i)QryQ Q$~i.!A-AM'i HC'~'-1 A-RW9 G'l".-iG->>H-RN9'c"i I-" RW";.',2K tU".).iDN:3 5TIl',.TN3 r~I r~'53'3l':,',NX
g k   k 4g   V     sdfrfi J,   I   '<< 'tdlg~9   %rid] f   ), I l   y j r r,t ''rueq, q >f ~
~QG:5 rJI eTGA A-$',lt9 GB>~3 A-~H9 AJ" G~k P'i'IIW~l 6<"r" JJPI3UQ itBLI A-5IW9 O'E;3 x", i'.~3"36~3 7 t*!.r'<.)9Ji JARRR4'GA 8--"",i>>)I FcPA J1'i I'~'i~'iGX 8'lN>"'.'g~6'~lG y$ip>.I i" a QRR ()r I, IL~QI"i1J~hGA:
                                                                                                                                        ~
IANR37'~IX 5N>ii klR4I gi'ilq'-5'iVR HAig ,i AT iIPX5IANi i T'i)i3 AA~<>XA94'5iQGX RAN<,NQn HGr-)a 2,>.Hb'I X@~J(ANRQTX3 AG GRI i SKK Carolina Power&Light Company APg gs~SERIAL: NLS-86-127 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-000 CONTROL ROOM DESIGN REVIEW FINAL  
Y'JT, Tw< "i I.IA Hi'~< i/h
                                                                            .A3       i'r~i~L.J Pv 'r <His)'I i. 'f '.<1'i'".'
I;QYTAl.IY.",'lh '4'i-.l,~ rIK,'.           i;;
~+5'g gc'H   +.0 q);n:I         g ,
rj:Q ~A~)sf t=         s~u0   'ill 'ref:)69/               'qrgutg 50 0> H 5~QR',i     ~ri;j'I r>>~u~ re.i~:i<                     4       i -r,~t"     ri~~rs.~c.'"         af   L       <<!3;~b.'~w o "fq~'-I
                                                                                                                              ~
Ebb'~
                                                                                                                                                                                    ''G.ILGWU'rr~
r'y,'>~'x pi"e rrcirir...           q r o~rr"
* Ite;, eau." J r~ <<'i -t
              .f qs~     vox f<>>J ~i+~ Ess'.rrrtvzf 3JJ                                 >'3svb rrr         b   >feil     .. sr, irr:; iv i>~ lb                                                       ll 3i fw,           . J-'=)NB .'...         hI"..I:GGVl3V'>Fi 83'i'I(IQ                       Gr"(i'0A;.~("'"'> NOL II.'>'liATOXG (i,"C-'.".b'+.I 'r. >sri )Q)&#xc3;t M-QAFiUN of                                     '.qquo           'Lc$ fi ~,~~uQ prrj;.~i           "a'>i'Jkgr):3JT'I'I'Q,'-
      ~()iz'l ">                                                               be   rii     Leven'.> r         f Lm~sq       rr~%   rm~" r;:>il'qqA:83IGN
                      ".'3Z RG 5                       TMB K'I K:3.3$ i                           .',2K tU".)                  TN3 r ~I r '53    ~
I:)""~ 5t)'i.1                              )QryQ Q        $            .iDN:3 5TIl',.                 '3l':,',NX ~QG:5 rJI i                              ~i.!    A-AM'i                                                      eTGA A -$ ',lt9 HC'~'-1  A- RW9                                                    GB>~3 A-~H9 G'l  ".-iG->>    H-RN9                                                  AJ " G~k P'i'IIW~l
                                                                'c"i    I-" RW";                                                      6 <"r" JJPI3UQ itBLI A- 5IW9 O'E;3 x", i'. ~3 "36~3 7                 ()          r                            QI"i1J~hGA: IANR37'~IX t*! .r'<.)9Ji JARRR4                                                                   5N>ii klR4I GA 8- -"",i>>) I FcPA                                 I,            gi'ilq'-5'iVR                                          HAig J1'i I'~'i ~'iGX 8'lN                               IL ~                    ,i AT iIPX5IANi
                                                        >"'.'g ~ 6'~lG y $ ip>.I                                             i T'i)i3     AA~
i" a QRR                                                                                        <>XA94'5iQGX RAN
                                                                                                                                                                            <,NQn HGr-) a                                                                                                 X@~            J(ANRQTX3 2,>. Hb'I                                                       AG                                     GRI i
 
SKK Carolina Power & Light Company APg   gs   ~                         SERIAL: NLS-86-127 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO. 50-000 CONTROL ROOM DESIGN REVIEW FINAL  


==SUMMARY==
==SUMMARY==
REPORT  
REPORT
 
==Dear Mr. Denton:==
 
Carolina Power R Light Company (CPRL) hereby submits a revision to the SHNPP                    ~
Control Room Design Review (CRDR) Final Summary Report. This revision is in response to concerns expressed in the Lawrence Livermore National Laboratory (LLNL) draft "Technical Evaluation Report (TER) of the Detailed Control Room Design Review,"
dated November 0, 1985 and discussions held with members of the NRC on December 20, 1985 and March 18-19, 1986.
                                'I  provides the revised sections of the SHNPP CRDR Final Summary Report, which includes the relevant information required to complete the staff's review of the SHNPP CRDR program. Each revised section is paginated such that it directly replaces the corresponding sections contained in the SHNPP CRDR Final Summary Report submitted to you on September 13, 1985. Each report section contained in Enclosure 1 has been expanded to include the additional information requested in the draft TER and by discussions with the NRC. This additional material will enable the NRC and LLNL reviewers to adequately assess the development and implementation of the SHNPP CRDR Program and the results obtained from the review process. presents those HEDs listed in the draft TER as not containing adequate information for the NRC to perform a thorough review of the HED disposition. For these HEDs, the "Title" and/or "Disposition" descriptions have been expanded to provide the additional information requested. Please note that Enclosure 2 is not a revision to the SHNPP CRDR Final Summary Report, Appendix A, but provides additional information only.
The attached material was reviewed and discussed with the NRC Human Factors reviewers during the March 18-19, 1986 on-site meeting and was determined to adequately address all NRC and LLNL concerns. With this submittal CPRL, therefore, Sb05020f84 8b0428 PDR                  PDR'ttt9 ADOCK 05000400'
                                                                                                  .(i 411 Fayetteville Street ~ P. O. Box 1551 o Raleigh, N. C. 27602


==Dear Mr.Denton:==
~ 4 ~e Qr. Harold R. Denton NLS-86-127/Page 2 considers all outstanding NRC concerns regarding the SHNPP CRDR Program to be closed. Should you have any questions concerning this submittal, please contact Mr. Arnold Schmich at (919) 836-8759.
Carolina Power R Light Company (CPRL)hereby submits a revision to the SHNPP~Control Room Design Review (CRDR)Final Summary Report.This revision is in response to concerns expressed in the Lawrence Livermore National Laboratory (LLNL)draft"Technical Evaluation Report (TER)of the Detailed Control Room Design Review," dated November 0, 1985 and discussions held with members of the NRC on December 20, 1985 and March 18-19, 1986.'I Enclosure 1 provides the revised sections of the SHNPP CRDR Final Summary Report, which includes the relevant information required to complete the staff's review of the SHNPP CRDR program.Each revised section is paginated such that it directly replaces the corresponding sections contained in the SHNPP CRDR Final Summary Report submitted to you on September 13, 1985.Each report section contained in Enclosure 1 has been expanded to include the additional information requested in the draft TER and by discussions with the NRC.This additional material will enable the NRC and LLNL reviewers to adequately assess the development and implementation of the SHNPP CRDR Program and the results obtained from the review process.Enclosure 2 presents those HEDs listed in the draft TER as not containing adequate information for the NRC to perform a thorough review of the HED disposition.
Yours v ry trul A.. Cutter -    ice resi ent Nuclear Engineering R Licensing ABC/AWS/ccc (3692AWS)
For these HEDs, the"Title" and/or"Disposition" descriptions have been expanded to provide the additional information requested.
Enclosures
Please note that Enclosure 2 is not a revision to the SHNPP CRDR Final Summary Report, Appendix A, but provides additional information only.The attached material was reviewed and discussed with the NRC Human Factors reviewers during the March 18-19, 1986 on-site meeting and was determined to adequately address all NRC and LLNL concerns.With this submittal CPRL, therefore, Sb05020f84 8b0428 PDR ADOCK 05000400'PDR'ttt9.(i 411 Fayetteville Street~P.O.Box 1551 o Raleigh, N.C.27602
      +cc:  Mr. B. C. Buckley (NRC)                     Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)               Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII)              Dr. Richard D. Wilson Mr. Saba N. Saba (NRC)                      Mr. G. O. Bright (ASLB)
Mr. Travis Payne (KUDZU)                    Dr. 3. H. Carpenter (ASLB)
Mr. Daniel F. Read (CHANGE/ELP)            Mr. 3. L. Kelley (ASLB)
Wake County Public Library
      "  Enclosure with all cc's.


~4~e Qr.Harold R.Denton NLS-86-127/Page 2 considers all outstanding NRC concerns regarding the SHNPP CRDR Program to be closed.Should you have any questions concerning this submittal, please contact Mr.Arnold Schmich at (919)836-8759.Yours v ry trul ABC/AWS/ccc (3692AWS)Enclosures
~ ~}}
+cc: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
Dr.3.Nelson Grace (NRC-RII)Mr.Saba N.Saba (NRC)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
Wake County Public Library" Enclosure with all cc's.A..Cutter-ice resi ent Nuclear Engineering R Licensing Mr.Wells Eddleman Mr.3ohn D.Runkle Dr.Richard D.Wilson Mr.G.O.Bright (ASLB)Dr.3.H.Carpenter (ASLB)Mr.3.L.Kelley (ASLB)
-~~}}

Latest revision as of 19:15, 3 February 2020

Forwards Rev 1 to Shearon Harris Nuclear Power Plant Crdr Final Summary Rept & Addl Info Re Human Engineering Discrepancies Listed in Draft Lll Technical Evaluation Rept
ML18019A791
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/28/1986
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18019A792 List:
References
NLS-86-127, NUDOCS 8605020184
Download: ML18019A791 (6)


Text

REQU RY INFORMATION DISTRIBU SYSTEM (RIDS)

ACCESSION NBR: Sb05020184 DOC. DATE: 8b/04/28 NOTARIZED: NO DOCKET 0 FACIL: 50-400 Sheav'on Hav r is Nucleav Powev Planti Unit ii Cav ol ina 05000400 AUTH. NANE AUTHOR AFFILIATION CUTTERS A. B. Carolina Power 8r Light Co.

RECIP. NAKE RECIPIENT AFFILIATION DENTQN, H. R. f Of ice of Nucleav Reactov Regulatiov)> Director <post 851125

SUBJECT:

Forwards Rev 1 to "Sheav on Harv is Nucleav Powev'lant CRDR Final Summary Rept" 5 addi info v e human engineering discv epancies listed in draft LLL technical evaluat'ion rept.

DISTRIBUTION CODE: A003D COPIES RECEIVED: LTR J ENCL / SIZE:

TITLE: OR/Licensing Submittal: Supp l 1 to NUREQ-0737<Generic Ltr 82-33)

NOTES: Application fov permit v enewal fi led. 05000400 RECIPIENT COPIES RECIP I ENT COP IES ID CODE/NANE LTTR ENCL ID CODE/MANE LTTR ENCL PWR-A ADTS fo PWR-A EB 1 PWR-A EICSB Pu PWR-A FOB 1~

PMR-A PD2 LA ic PWR-A PD2 PD 7 gt BUCKLEY B 1 10 PWR-A PSB PMR-A RSB 1 io

'NTERNAL: ADN/LFI% IE/DEPER/EPB 3 NRR BWR ADTS NRR PAULSONi W 1 NRR PWR-A ADTS NRR PWR-B ADTS 1 NRR/DHFT/HFIB NRR/DHFT/NTB 2 NRR/DSRO ESPRIT NRR/D /EIB 1 NRR/DSRO/RSIB 0 FILE 1 RCN2 EXTERNAL: 24X 1 1+ LPDR io NRC PDR 1 io NSIC io TOTAL NUgBER OF COPIES REQUIRED: LTTR 40 ENCL

TBit:)'30 i jH:O'"'U I )TON ".

BB < k~'38 ~~TAG .;,30(t PR EO.".<M(lv8 Q(}QQQ(jFO E;ri x <<t) rr ~

g k k 4g V sdfrfi J, I '<< 'tdlg~9 %rid] f ), I l y j r r,t rueq, q >f ~

~

Y'JT, Tw< "i I.IA Hi'~< i/h

.A3 i'r~i~L.J Pv 'r <His)'I i. 'f '.<1'i'".'

I;QYTAl.IY.",'lh '4'i-.l,~ rIK,'. i;;

~+5'g gc'H +.0 q);n:I g ,

rj:Q ~A~)sf t= s~u0 'ill 'ref:)69/ 'qrgutg 50 0> H 5~QR',i ~ri;j'I r>>~u~ re.i~:i< 4 i -r,~t" ri~~rs.~c.'" af L <<!3;~b.'~w o "fq~'-I

~

Ebb'~

G.ILGWU'rr~

r'y,'>~'x pi"e rrcirir... q r o~rr"

  • Ite;, eau." J r~ <<'i -t

.f qs~ vox f<>>J ~i+~ Ess'.rrrtvzf 3JJ >'3svb rrr b >feil .. sr, irr:; iv i>~ lb ll 3i fw, . J-'=)NB .'... hI"..I:GGVl3V'>Fi 83'i'I(IQ Gr"(i'0A;.~("'"'> NOL II.'>'liATOXG (i,"C-'.".b'+.I 'r. >sri )Q)Ãt M-QAFiUN of '.qquo 'Lc$ fi ~,~~uQ prrj;.~i "a'>i'Jkgr):3JT'I'I'Q,'-

~()iz'l "> be rii Leven'.> r f Lm~sq rr~% rm~" r;:>il'qqA:83IGN

".'3Z RG 5 TMB K'I K:3.3$ i .',2K tU".) TN3 r ~I r '53 ~

I:)""~ 5t)'i.1 )QryQ Q $ .iDN:3 5TIl',. '3l':,',NX ~QG:5 rJI i ~i.! A-AM'i eTGA A -$ ',lt9 HC'~'-1 A- RW9 GB>~3 A-~H9 G'l ".-iG->> H-RN9 AJ " G~k P'i'IIW~l

'c"i I-" RW"; 6 <"r" JJPI3UQ itBLI A- 5IW9 O'E;3 x", i'. ~3 "36~3 7 () r QI"i1J~hGA: IANR37'~IX t*! .r'<.)9Ji JARRR4 5N>ii klR4I GA 8- -"",i>>) I FcPA I, gi'ilq'-5'iVR HAig J1'i I'~'i ~'iGX 8'lN IL ~ ,i AT iIPX5IANi

>"'.'g ~ 6'~lG y $ ip>.I i T'i)i3 AA~

i" a QRR <>XA94'5iQGX RAN

<,NQn HGr-) a X@~ J(ANRQTX3 2,>. Hb'I AG GRI i

SKK Carolina Power & Light Company APg gs ~ SERIAL: NLS-86-127 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO.50-000 CONTROL ROOM DESIGN REVIEW FINAL

SUMMARY

REPORT

Dear Mr. Denton:

Carolina Power R Light Company (CPRL) hereby submits a revision to the SHNPP ~

Control Room Design Review (CRDR) Final Summary Report. This revision is in response to concerns expressed in the Lawrence Livermore National Laboratory (LLNL) draft "Technical Evaluation Report (TER) of the Detailed Control Room Design Review,"

dated November 0, 1985 and discussions held with members of the NRC on December 20, 1985 and March 18-19, 1986.

'I provides the revised sections of the SHNPP CRDR Final Summary Report, which includes the relevant information required to complete the staff's review of the SHNPP CRDR program. Each revised section is paginated such that it directly replaces the corresponding sections contained in the SHNPP CRDR Final Summary Report submitted to you on September 13, 1985. Each report section contained in Enclosure 1 has been expanded to include the additional information requested in the draft TER and by discussions with the NRC. This additional material will enable the NRC and LLNL reviewers to adequately assess the development and implementation of the SHNPP CRDR Program and the results obtained from the review process. presents those HEDs listed in the draft TER as not containing adequate information for the NRC to perform a thorough review of the HED disposition. For these HEDs, the "Title" and/or "Disposition" descriptions have been expanded to provide the additional information requested. Please note that Enclosure 2 is not a revision to the SHNPP CRDR Final Summary Report, Appendix A, but provides additional information only.

The attached material was reviewed and discussed with the NRC Human Factors reviewers during the March 18-19, 1986 on-site meeting and was determined to adequately address all NRC and LLNL concerns. With this submittal CPRL, therefore, Sb05020f84 8b0428 PDR PDR'ttt9 ADOCK 05000400'

.(i 411 Fayetteville Street ~ P. O. Box 1551 o Raleigh, N. C. 27602

~ 4 ~e Qr. Harold R. Denton NLS-86-127/Page 2 considers all outstanding NRC concerns regarding the SHNPP CRDR Program to be closed. Should you have any questions concerning this submittal, please contact Mr. Arnold Schmich at (919) 836-8759.

Yours v ry trul A.. Cutter - ice resi ent Nuclear Engineering R Licensing ABC/AWS/ccc (3692AWS)

Enclosures

+cc: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII) Dr. Richard D. Wilson Mr. Saba N. Saba (NRC) Mr. G. O. Bright (ASLB)

Mr. Travis Payne (KUDZU) Dr. 3. H. Carpenter (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Mr. 3. L. Kelley (ASLB)

Wake County Public Library

" Enclosure with all cc's.

~ ~