Line 37: |
Line 37: |
|
| |
|
| Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi | | Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi |
| -Unit Dose Assessment Plans." This inspection will be conducted at Wolf Creek Generating Station to confirm the station's full implementation of Commission Orders EA | | -Unit Dose Assessment Plans." This inspection will be conducted at Wolf Creek Generating Station to confirm the station's full implementation of Commission Orders EA-12-049 and EA |
| -12-049 and EA | |
| -12-051. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011 | | -12-051. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011 |
| -4511 A. Helflin 2 public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | | -4511 A. Helflin 2 public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading |
| -rm/adams.html (the Public Electronic Reading Room). | | -rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| Please contact me at (817) 200 | | Please contact me at (817) 200-1141 with any questions you have regarding this letter. |
| -1141 with any questions you have regarding this letter. | |
|
| |
|
| Sincerely,/RA D. Proulx for/ | | Sincerely,/RA D. Proulx for/ |
Line 53: |
Line 51: |
| Wolf Creek Generating Station Inspection Plan | | Wolf Creek Generating Station Inspection Plan |
|
| |
|
| SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword-NRC-002 By:NHT/dll Yes No Publicly Available Sensitive OFFICE RIV/DRP:SPE RIV/DRP:C NAME DProulx NTaylor SIGNATURE | | SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword-NRC-002 By:NHT/dll Yes No Publicly Available Sensitive OFFICE RIV/DRP:SPE RIV/DRP:C NAME DProulx NTaylor SIGNATURE /RA/ /RA DProulx for/ DATE 8/28/17 8/28/17 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2017 |
| /RA/ /RA DProulx for/ DATE 8/28/17 8/28/17 Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2017
| | -06/30/2019 Page 1 of 2 08/25/2017 08:25:55 INIT EXA-INITIAL EXAM 5 1 INITIAL EXAM WOLF CREEK (11/2017) |
| -06/30/2019 Page 1 of 2 08/25/2017 08:25:55 INIT EXA-INITIAL EXAM 51 INITIAL EXAM WOLF CREEK (11/2017) | | X02597 10/16/2017 10/20/2017 1 INITIAL EXAM WOLF CREEK (11/2017) |
| X0259710/16/2017 10/20/2017 1 INITIAL EXAM WOLF CREEK (11/2017)
| | X0259711/06/201711/10/2017 EB1-21N-WC DESIGN BASIS INSPECTION PROGRAMS 3 1 IP Design Bases Assurance Inspection (Programs)7111121N 05/08/2017 07/13/2017 PI&R-PI&R FOCUSED SAMPLE - SCWE 2 1 IP In-depth Reviews71152-Reviews 08/29/2017 08/30/2017 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 4 1 IP Fire Protection [Triennial]7111105T 10/02/2017 10/06/2017 1 IP Fire Protection [Triennial]7111105T 10/16/2017 10/20/2017 EP-2-BIENNIAL EP EXERCISE INSPECTION 4 1 IP Exercise Evaluation711140111/13/201711/17/2017 1 IP Emergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017 EP-3-EP PERFORMANCE INDICATOR VERIFICATION 1 1 IP Drill/Exercise Performance71151-EP0111/13/201711/17/2017 1 IP ERO Readiness71151-EP0211/13/201711/17/2017 1 IP A lert & Notification System Reliability71151-EP0311/13/201711/17/2017TI191-MITIGATING STRATEGIES/SFP INST FOR BDBEE 4 1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 01/22/2018 01/26/20187111108-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/02/2018 04/13/2018 RS 12PI-RAD SAFETY 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/09/2018 04/13/2018 1 IP Occupational ALARA Planning and Controls71124.02 04/09/2018 04/13/2018 1 IP Occupational Exposure Control Effectiveness71151-OR01 04/09/2018 04/13/2018 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 04/09/2018 04/13/2018 INSP-BRQ INSPECTION 2 1 IP Licensed Operator Requalification Program7111111B 06/04/2018 06/08/2018 PI&R-BIENNIAL PI&R INSPECTION 4 1 IP Problem Identification and Resolution71152B06/11/2018 06/15/2018 1 IP Problem Identification and Resolution71152B 06/25/2018 06/29/2018 EB1-21M-WC DESIGN BASES INSPECTION TEAMS 6 1 IP Design Bases Assurance Inspection (Teams)7111121M 07/16/2018 08/03/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. |
| X0259711/06/201711/10/2017 EB1-21N-WC DESIGN BASIS INSPECTION PROGRAMS 31 IPDesign Bases Assurance Inspection (Programs)7111121N05/08/2017 07/13/2017 PI&R-PI&R FOCUSED SAMPLE - SCWE 21 IPIn-depth Reviews71152-Reviews 08/29/2017 08/30/2017 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 41 IPFire Protection [Triennial]7111105T10/02/2017 10/06/2017 1 IPFire Protection [Triennial]7111105T10/16/2017 10/20/2017 EP-2-BIENNIAL EP EXERCISE INSPECTION 41 IPExercise Evaluation711140111/13/201711/17/2017 1 IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017 EP-3-EP PERFORMANCE INDICATOR VERIFICATION 11 IPDrill/Exercise Performance71151-EP0111/13/201711/17/2017 1 IPERO Readiness71151-EP0211/13/201711/17/2017 1 IPAlert & Notification System Reliability71151-EP0311/13/201711/17/2017TI191-MITIGATING STRATEGIES/SFP INST FOR BDBEE 41 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/19101/22/2018 01/26/20187111108-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/02/2018 04/13/2018 RS 12PI-RAD SAFETY 21 IPRadiological Hazard Assessment and Exposure Controls71124.0104/09/2018 04/13/2018 1 IPOccupational ALARA Planning and Controls71124.0204/09/2018 04/13/2018 1 IPOccupational Exposure Control Effectiveness71151-OR01 04/09/2018 04/13/2018 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 04/09/2018 04/13/2018 INSP-BRQ INSPECTION 21 IPLicensed Operator Requalification Program7111111B06/04/2018 06/08/2018 PI&R-BIENNIAL PI&R INSPECTION 41 IPProblem Identification and Resolution71152B06/11/2018 06/15/2018 1 IPProblem Identification and Resolution71152B06/25/2018 06/29/2018 EB1-21M-WC DESIGN BASES INSPECTION TEAMS 61 IPDesign Bases Assurance Inspection (Teams)7111121M07/16/2018 08/03/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |
|
| |
|
| Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2017 | | Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2017 |
| -06/30/2019 Page 2 of 2 08/25/2017 08:25:55 RS 5678-RAD SAFETY 41 IPRadiation Monitoring Instrumentation71124.0508/20/2018 08/24/2018 1 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0608/20/2018 08/24/2018 1 IPRadiological Environmental Monitoring Program71124.0708/20/2018 08/24/2018 1 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0808/20/2018 08/24/2018 EP-1-EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140209/17/2018 09/21/2018 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/17/2018 09/21/2018 1 IPEmergency Action Level and Emergency Plan Changes711140409/17/2018 09/21/2018 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/17/2018 09/21/2018 1 IPDrill/Exercise Performance71151-EP01 09/17/2018 09/21/2018 1 IPERO Readiness71151-EP02 09/17/2018 09/21/2018 1 IPAlert & Notification System Reliability71151-EP03 09/17/2018 09/21/2018 EB1-17T-WOLF CREEK 10CFR50.59 INSPECTION 31 IPEvaluations of Changes, Tests, and Experiments7111117T04/29/2019 05/03/2019 RS 24-RP INSPECTION 11 IPOccupational ALARA Planning and Controls71124.0205/06/2019 05/10/2019 1 IPOccupational Dose Assessment71124.0405/06/2019 05/10/2019 EP-2-EP EXERCISE INSPECTION 41 IPExercise Evaluation711140106/03/2019 06/07/2019 1 IPEmergency Action Level and Emergency Plan Changes711140406/03/2019 06/07/2019 1 IPDrill/Exercise Performance71151-EP01 06/03/2019 06/07/2019 1 IPERO Readiness71151-EP02 06/03/2019 06/07/2019 1 IPAlert & Notification System Reliability71151-EP03 06/03/2019 06/07/2019 EP2-EP EXERCISE AND PI INSPECTION 41 IPExercise Evaluation711140106/03/2019 06/07/2019 1 IPEmergency Action Level and Emergency Plan Changes711140406/03/2019 06/07/2019 1 IPDrill/Exercise Performance71151-EP01 06/03/2019 06/07/2019 1 IPERO Readiness71151-EP02 06/03/2019 06/07/2019 1 IPAlert & Notification System Reliability71151-EP03 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | | -06/30/2019 Page 2 of 2 08/25/2017 08:25:55 RS 5678-RAD SAFETY 4 1 IP Radiation Monitoring Instrumentation71124.05 08/20/2018 08/24/2018 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 08/20/2018 08/24/2018 1 IP Radiological Environmental Monitoring Program71124.07 08/20/2018 08/24/2018 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 08/20/2018 08/24/2018 EP-1-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing7111402 09/17/2018 09/21/2018 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 09/17/2018 09/21/2018 1 IP Emergency Action Level and Emergency Plan Changes7111404 09/17/2018 09/21/2018 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 09/17/2018 09/21/2018 1 IP Drill/Exercise Performance71151-EP01 09/17/2018 09/21/2018 1 IP ERO Readiness71151-EP02 09/17/2018 09/21/2018 1 IP A lert & Notification System Reliability71151-EP03 09/17/2018 09/21/2018 EB1-17T-WOLF CREEK 10CFR50.59 INSPECTION 3 1 IP Evaluations of Changes, Tests, and Experiments7111117T 04/29/2019 05/03/2019 RS 24-RP INSPECTION 1 1 IP Occupational ALARA Planning and Controls71124.02 05/06/2019 05/10/2019 1 IP Occupational Dose Assessment71124.04 05/06/2019 05/10/2019 EP-2-EP EXERCISE INSPECTION 4 1 IP Exercise Evaluation7111401 06/03/2019 06/07/2019 1 IP Emergency Action Level and Emergency Plan Changes7111404 06/03/2019 06/07/2019 1 IP Drill/Exercise Performance71151-EP01 06/03/2019 06/07/2019 1 IP ERO Readiness71151-EP02 06/03/2019 06/07/2019 1 IP A lert & Notification System Reliability71151-EP03 06/03/2019 06/07/2019 EP2-EP EXERCISE AND PI INSPECTION 4 1 IP Exercise Evaluation7111401 06/03/2019 06/07/2019 1 IP Emergency Action Level and Emergency Plan Changes7111404 06/03/2019 06/07/2019 1 IP Drill/Exercise Performance71151-EP01 06/03/2019 06/07/2019 1 IP ERO Readiness71151-EP02 06/03/2019 06/07/2019 1 IP A lert & Notification System Reliability71151-EP03 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. |
| }} | | }} |
Revision as of 15:18, 7 July 2018
|
---|
Category:Inspection Plan
MONTHYEARML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 IR 05000482/20220062023-03-0101 March 2023 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2022006) ML22321A2662022-11-16016 November 2022 January 2023 Emergency Preparedness Program Inspection - Request for Information IR 05000482/20220052022-08-23023 August 2022 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2022005) ML22215A2742022-08-0202 August 2022 Inservice Inspection Request for Information ML22249A2552022-06-29029 June 2022 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000482/2022012 ML22130A7662022-05-10010 May 2022 Notification of Inspection (NRC Inspection Report 05000482/2022003) and Request for Information IR 05000482/20224012022-05-0303 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000482/2022401 IR 05000482/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000482/2021006) ML22025A3612022-01-21021 January 2022 PI&R RFI Final ML22019A0932022-01-19019 January 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection (05000482/2022002) and Request for Information ML21322A2952021-11-19019 November 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000482/2022001 and Request for Information ML21237A5212021-09-0101 September 2021 Wc Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21132A1032021-05-12012 May 2021 Document Request List, Paperwork Reduction Act Statement ML21123A0412021-05-0505 May 2021 Notification of NRC Design Bases Assurance Inspection (Teams) (05000482/2021010) and Initial Request for Information IR 05000482/20190062021-03-0303 March 2021 Annual Assessment Letter (Report 05000482/2019006) ML21061A3412021-02-25025 February 2021 Request for Information: Wolf Creek Nuclear Station, Dated February 11, 2021, Inspection Report 05000482/2021002 Occupational Radiation Safety Inspection-1, 2, PI ML21026A1982021-01-26026 January 2021 Inservice Inspection Request for Information ML20104C1472020-04-13013 April 2020 Notification of Inspection (NRC Inspection Report 05000482/2020003) and Request for Information ML20099G9422020-04-0808 April 2020 Notification of NRC Biennial Problem Identification and Resolution Inspection (05000482/2020010) and Initial Request for Information ML20055E1132020-03-0303 March 2020 WC2019006 Annual Assessment Letter ML20024D7072020-01-24024 January 2020 Notification of NRC Design Bases Assurance Inspection (Programs) (05000482/2020011) and Initial Request for Information IR 05000482/20190052019-08-30030 August 2019 Updated Inspection Plan for Wolf Creek Generating Station, Report 05000482/2019005 ML19158A0782019-06-0505 June 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000482/2019003) and Request for Information IR 05000482/20180062019-03-0404 March 2019 Annual Assessment Letter for Wolf Creek Report 05000482/2018006) ML19043A9462019-02-12012 February 2019 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000482/2019002) and Request for Information IR 05000482/20180052018-08-31031 August 2018 Updated Inspection Plan for Wolf Creek Generating Station, Unit 1, (Inspection Report 05000482/2018005) IR 05000482/20170062018-03-0101 March 2018 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2017006) ML17311A5182017-11-0101 November 2017 Notification of NRC Inspection of Implementation of Mitigation Strategies Assessment Plans (05000482/2018008) and Request for Information IR 05000482/20170052017-08-28028 August 2017 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2017005) IR 05000482/20160062017-03-0101 March 2017 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016006) IR 05000482/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005) ML16237A0732016-08-31031 August 2016 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005) IR 05000482/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Reports Number 05000482/2016401) ML16085A0532016-03-25025 March 2016 Operating Corp - Notification of NRC Triennial Heat Sink Performance Inspection (05000482/2016002) and Request for Information IR 05000482/20150062016-03-0202 March 2016 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2015006) IR 05000482/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2015005) ML15015A1712015-01-0808 January 2015 Focused Baseline Inspection at the Wolf Creek Site for a Major Essential Service Water Modification IR 05000482/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Report Number 05000482/2014402) IR 05000482/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2014006) ML14231A0682014-08-19019 August 2014 Notification of Inspection (NRC Inspection Report 05000482-14-005) and Request for Information ML14063A6282014-03-0404 March 2014 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2013001) ML13246A2992013-09-0303 September 2013 Midcycle Assessment Letter 2013 IR 05000482/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - Wolf Creek Generating Station (05000482/2012006) 2024-08-14
[Table view] Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] |
Text
August 28, 2017
Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411
Burlington, KS 66839
SUBJECT: UPDATED INSPECTION PLAN FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2017005)
Dear Mr. Heflin:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Wolf Creek Generating Station.
The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include the plan for security
-related inspections, which will be sent via separate, non
-publicly available correspondence.
Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans." This inspection will be conducted at Wolf Creek Generating Station to confirm the station's full implementation of Commission Orders EA-12-049 and EA
-12-051. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011
-4511 A. Helflin 2 public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (817) 200-1141 with any questions you have regarding this letter.
Sincerely,/RA D. Proulx for/
Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects Docket No. 0 5000482 License No. NPF
-42
Enclosure:
Wolf Creek Generating Station Inspection Plan
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword-NRC-002 By:NHT/dll Yes No Publicly Available Sensitive OFFICE RIV/DRP:SPE RIV/DRP:C NAME DProulx NTaylor SIGNATURE /RA/ /RA DProulx for/ DATE 8/28/17 8/28/17 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2017
-06/30/2019 Page 1 of 2 08/25/2017 08:25:55 INIT EXA-INITIAL EXAM 5 1 INITIAL EXAM WOLF CREEK (11/2017)
X02597 10/16/2017 10/20/2017 1 INITIAL EXAM WOLF CREEK (11/2017)
X0259711/06/201711/10/2017 EB1-21N-WC DESIGN BASIS INSPECTION PROGRAMS 3 1 IP Design Bases Assurance Inspection (Programs)7111121N 05/08/2017 07/13/2017 PI&R-PI&R FOCUSED SAMPLE - SCWE 2 1 IP In-depth Reviews71152-Reviews 08/29/2017 08/30/2017 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 4 1 IP Fire Protection [Triennial]7111105T 10/02/2017 10/06/2017 1 IP Fire Protection [Triennial]7111105T 10/16/2017 10/20/2017 EP-2-BIENNIAL EP EXERCISE INSPECTION 4 1 IP Exercise Evaluation711140111/13/201711/17/2017 1 IP Emergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017 EP-3-EP PERFORMANCE INDICATOR VERIFICATION 1 1 IP Drill/Exercise Performance71151-EP0111/13/201711/17/2017 1 IP ERO Readiness71151-EP0211/13/201711/17/2017 1 IP A lert & Notification System Reliability71151-EP0311/13/201711/17/2017TI191-MITIGATING STRATEGIES/SFP INST FOR BDBEE 4 1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 01/22/2018 01/26/20187111108-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/02/2018 04/13/2018 RS 12PI-RAD SAFETY 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/09/2018 04/13/2018 1 IP Occupational ALARA Planning and Controls71124.02 04/09/2018 04/13/2018 1 IP Occupational Exposure Control Effectiveness71151-OR01 04/09/2018 04/13/2018 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 04/09/2018 04/13/2018 INSP-BRQ INSPECTION 2 1 IP Licensed Operator Requalification Program7111111B 06/04/2018 06/08/2018 PI&R-BIENNIAL PI&R INSPECTION 4 1 IP Problem Identification and Resolution71152B06/11/2018 06/15/2018 1 IP Problem Identification and Resolution71152B 06/25/2018 06/29/2018 EB1-21M-WC DESIGN BASES INSPECTION TEAMS 6 1 IP Design Bases Assurance Inspection (Teams)7111121M 07/16/2018 08/03/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2017
-06/30/2019 Page 2 of 2 08/25/2017 08:25:55 RS 5678-RAD SAFETY 4 1 IP Radiation Monitoring Instrumentation71124.05 08/20/2018 08/24/2018 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 08/20/2018 08/24/2018 1 IP Radiological Environmental Monitoring Program71124.07 08/20/2018 08/24/2018 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 08/20/2018 08/24/2018 EP-1-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing7111402 09/17/2018 09/21/2018 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 09/17/2018 09/21/2018 1 IP Emergency Action Level and Emergency Plan Changes7111404 09/17/2018 09/21/2018 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 09/17/2018 09/21/2018 1 IP Drill/Exercise Performance71151-EP01 09/17/2018 09/21/2018 1 IP ERO Readiness71151-EP02 09/17/2018 09/21/2018 1 IP A lert & Notification System Reliability71151-EP03 09/17/2018 09/21/2018 EB1-17T-WOLF CREEK 10CFR50.59 INSPECTION 3 1 IP Evaluations of Changes, Tests, and Experiments7111117T 04/29/2019 05/03/2019 RS 24-RP INSPECTION 1 1 IP Occupational ALARA Planning and Controls71124.02 05/06/2019 05/10/2019 1 IP Occupational Dose Assessment71124.04 05/06/2019 05/10/2019 EP-2-EP EXERCISE INSPECTION 4 1 IP Exercise Evaluation7111401 06/03/2019 06/07/2019 1 IP Emergency Action Level and Emergency Plan Changes7111404 06/03/2019 06/07/2019 1 IP Drill/Exercise Performance71151-EP01 06/03/2019 06/07/2019 1 IP ERO Readiness71151-EP02 06/03/2019 06/07/2019 1 IP A lert & Notification System Reliability71151-EP03 06/03/2019 06/07/2019 EP2-EP EXERCISE AND PI INSPECTION 4 1 IP Exercise Evaluation7111401 06/03/2019 06/07/2019 1 IP Emergency Action Level and Emergency Plan Changes7111404 06/03/2019 06/07/2019 1 IP Drill/Exercise Performance71151-EP01 06/03/2019 06/07/2019 1 IP ERO Readiness71151-EP02 06/03/2019 06/07/2019 1 IP A lert & Notification System Reliability71151-EP03 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.