ML18037A174: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML18037A174
| number = ML18037A174
| issue date = 05/31/1979
| issue date = 05/31/1979
| title = LER 79-012/01T-0 on 790523:Concrete Anchor Bolt Deficiencies & Missing Seismic Restraints Were Discovered on Class I Seismic Piping Sys.Caused by Incorrect Installation.Concrete Anchor Bolt Repair Program Will Be Completed by 791231
| title = LER 79-012/01T-0 on 790523:concrete Anchor Bolt Deficiencies & Missing Seismic Restraints Were Discovered on Class I Seismic Piping Sys.Caused by Incorrect Installation.Concrete Anchor Bolt Repair Program Will Be Completed by 791231
| author name = DUDA E
| author name = DUDA E
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.

Revision as of 16:28, 26 February 2018

LER 79-012/01T-0 on 790523:concrete Anchor Bolt Deficiencies & Missing Seismic Restraints Were Discovered on Class I Seismic Piping Sys.Caused by Incorrect Installation.Concrete Anchor Bolt Repair Program Will Be Completed by 791231
ML18037A174
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/31/1979
From: DUDA E
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17053A719 List:
References
LER-79-012-01T, LER-79-12-1T, NUDOCS 7906130006
Download: ML18037A174 (10)