Category:CORRESPONDENCE-LETTERS
MONTHYEARML20149G1941993-09-13013 September 1993 Partial Response to FOIA Request for Listed OI Repts.Record Listed in App D Being Withheld from Public Disclosure Because It Consists of Records Compiled for Law Enforcement Purposes.Nrc Continuing to Review Records Re FOIA Request IA-93-355, Partial Response to FOIA Request for Listed OI Repts.Record Listed in App D Being Withheld from Public Disclosure Because It Consists of Records Compiled for Law Enforcement Purposes.Nrc Continuing to Review Records Re FOIA Request1993-09-13013 September 1993 Partial Response to FOIA Request for Listed OI Repts.Record Listed in App D Being Withheld from Public Disclosure Because It Consists of Records Compiled for Law Enforcement Purposes.Nrc Continuing to Review Records Re FOIA Request ML20072C9611993-06-18018 June 1993 FOIA Request for Listed OI Repts ML20079D3191991-06-10010 June 1991 Forwards B Tatalovich Correspondence Re Plant ML20235A1251987-12-16016 December 1987 Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs ML20235W0981987-10-13013 October 1987 Final Response to FOIA Request for Records.No Records Subj to Request located.FOIA-87-40 in Name of Thomas Available in PDR IA-87-676, Final Response to FOIA Request for Records.No Records Subj to Request located.FOIA-87-40 in Name of Thomas Available in PDR1987-10-13013 October 1987 Final Response to FOIA Request for Records.No Records Subj to Request located.FOIA-87-40 in Name of Thomas Available in PDR ML20235W0951987-10-0808 October 1987 FOIA Request for All FOIA Requests Made for Zimmer Plant or GE Mark I or II Containment by Cincinnati Gas & Electric, Dayton Power & Light or Columbus & Southern Ohio Electric & FOIA 87-40 ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20234E4571987-06-23023 June 1987 Partial Response to FOIA Request for 771026 Minutes of ACRS Subcommittee on Fluid/Hydraulic Dynamic Effects Meeting in Portland,Or & Addl ACRS Documentation.Documents Identified on App H & Addl ACRS Documents Encl ML20209G6751987-03-27027 March 1987 FOIA Request for All Matls Made Available in Accordance W/ FOIA 87-40 & All Matls Produced to Either Plaintiffs in Zimmer Litigation &/Or GE ML20212H6601987-01-20020 January 1987 Final Response to FOIA Request.App F Documents Re Marviken II Project Encl & Available in PDR ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20210L2601986-03-20020 March 1986 Forwards Endorsement 31 to Nelia Policy NF-206 ML20141N2771986-01-14014 January 1986 Partial Response to FOIA Request for Seven Classes of Documents.Forwards App a Documents.App B Documents Available in Pdr.App C Documents Outside Scope of Request,Per 860114 Telcon W/Ca Reed ML20140F3691986-01-14014 January 1986 Further Response to FOIA Request for Several Categories of Documents Re Pressure Suppression Containment.Fsar & SER for Limerick Only Documentation Re 4x4 Tests.Encl Apps D-G Documents Responsive to Item 4 Also Available in PDR ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20136D8751985-11-0606 November 1985 Further Response to FOIA Request for Documents Re H Hoyt & Aloot Oct 1983 Rept on NRC Investigations at Facility. Listed Documents Encl & Available in Pdr.Certain Documents Totally Withheld (Ref FOIA Exemptions 5 & 7) ML20136J3371985-08-0101 August 1985 Final Response to FOIA Request for Documents Re Facility.Documents Listed on Encl Printout Located in Ofc of Investigations.Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-84-604, Responds to FOIA Request for Documents Re Ofc of Investigation Repts on Facility.Documents Listed on Encl Printout Located in Ofc of Investigations as of 850227. Documents Withheld (Ref FOIA Exemptions 5 & 7)1985-08-0101 August 1985 Responds to FOIA Request for Documents Re Ofc of Investigation Repts on Facility.Documents Listed on Encl Printout Located in Ofc of Investigations as of 850227. Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-83-684, Final Response to FOIA Request for Documents Re Facility.Documents Listed on Encl Printout Located in Ofc of Investigations.Documents Withheld (Ref FOIA Exemptions 5 & 7)1985-08-0101 August 1985 Final Response to FOIA Request for Documents Re Facility.Documents Listed on Encl Printout Located in Ofc of Investigations.Documents Withheld (Ref FOIA Exemptions 5 & 7) ML20134D7991985-08-0101 August 1985 Responds to FOIA Request for Documents Re Ofc of Investigation Repts on Facility.Documents Listed on Encl Printout Located in Ofc of Investigations as of 850227. Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-83-787, Responds to FOIA Request for Documents Which Resulted in Issuance of Notice of Violation to Util in Nov 1981. Documents Withheld (Ref FOIA Exemptions 5 & 7)1985-07-31031 July 1985 Responds to FOIA Request for Documents Which Resulted in Issuance of Notice of Violation to Util in Nov 1981. Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-83-655, Final Response to FOIA Request for Documents Re Wh Zimmer Nuclear Power Station.Forwards Computer Printout of Document.W/O Encl.Documents Contained in Ofc of Investigation Files Withheld (Ref FOIA Exemptions 5 & 7)1985-07-31031 July 1985 Final Response to FOIA Request for Documents Re Wh Zimmer Nuclear Power Station.Forwards Computer Printout of Document.W/O Encl.Documents Contained in Ofc of Investigation Files Withheld (Ref FOIA Exemptions 5 & 7) ML20133Q2231985-07-31031 July 1985 Responds to FOIA Request for Documents Which Resulted in Issuance of Notice of Violation to Util in Nov 1981. Documents Withheld (Ref FOIA Exemptions 5 & 7) ML20134D5821985-07-31031 July 1985 Final Response to FOIA Request for Documents Re Wh Zimmer Nuclear Power Station.Forwards Computer Printout of Document.W/O Encl.Documents Contained in Ofc of Investigation Files Withheld (Ref FOIA Exemptions 5 & 7) ML20133Q3771985-07-29029 July 1985 Responds to FOIA Request for Ofc of Investigations Documents Re Wh Zimmer Nuclear Power Station.Forwards List of Documents as of 840227.All Documents Withheld (FOIA Exemptions 5 & 7) ML20129J4671985-07-15015 July 1985 Informs That Util 821124 Application for Extension of Const Completion Date Fee Exempt.Refund Being Processed ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20133B5651985-05-10010 May 1985 Partial Response to FOIA Request for Four Categories of Documents Re Facility.Forwards App a Documents.Documents Also Available in Pdr.App B Documents Already Available in Pdr.Search Continuing ML20129E9971985-05-0909 May 1985 Responds to FOIA Request for Compilations of Results of Operator Licensing & Requalification Exams.App a Documents Placed in Pdr.App B Documents Already in PDR ML20127F5341985-04-18018 April 1985 Partial Response to FOIA Request for Records Re BNL Investigation of Ee Kent Allegations.Forwards App a Documents.Documents Also Available in Pdr.Remaining Documents Will Be Forwarded Upon Completion of NRC Review ML20099M2911985-03-15015 March 1985 Forwards Endorsement 27 to Nelia Policy NF-249 ML20129B9301985-02-19019 February 1985 FOIA Request for Documents Re DOJ Inquiry Into Potential Wrongdoing by NRC Employees in Dealing W/Tmi & Zimmer Plants & Dh Gamble Testimony from TMI Restart Proceeding ML20100B6181985-01-30030 January 1985 Forwards Payment of Bill D-0089.Fee Paid.W/O Encl ML20125B8661985-01-17017 January 1985 Further Response to FOIA Request for Documents Re Oct 1983 Rept by H Hoyt & Aloot on NRC Investigations.Forwards App a Documents.Documents Also Available in Pdr.Info Partially Withheld (Ref FOIA Exemptions 2,6 & 7) ML20128E4161984-12-27027 December 1984 Interim Response to FOIA Request for All Agency Documents Re Oct 1983 Rept by Judge H Hoyt & Aloot on NRC Investigations at Facility.Forwards Documents.Documents Partially & Completely Withheld (Ref FOIA Exemptions 5-7) ML20101F7621984-12-20020 December 1984 Forwards Endorsement 26 to Nelia Policy NF-249 ML20129J2141984-12-0707 December 1984 Responds to FOIA Request for Interim or Final Repts Generated by Ofc of Investigation Re Facility.Documents Withheld (Ref FOIA Exemption 5) ML20093M2541984-10-18018 October 1984 Requests Written Verification of Implementation of Site Restoration Plan So CPPR-88 May Be Terminated ML20129J2031984-10-11011 October 1984 FOIA Request for Interim or Final Repts Generated by Ofc of Investigation Re Facility ML20107L6521984-07-19019 July 1984 FOIA Request for All Documents Re Insp Rept 50-358/84-04 ML20105C9801984-07-19019 July 1984 FOIA Request for Documents Re Ofc of Investigation Rept on Facility.If Requested Matls Still Protected,Copies of Matls W/Protected Sections Redacted Requested ML20151J1601984-06-0505 June 1984 Forwards IE Insp Rept 50-358/84-04 on 840220-0426.Insp Covered Status of Welding Procedure & Welder Performance Qualifications ML20091L5991984-06-0404 June 1984 Forwards Util 840601 Response to NRC 840503 Request for Addl Info Re Environ Review of Request to Withdraw Application for Ol.Five Oversize Drawings Encl.Aperture Cards Are Available in Pdr.Related Correspondence ML20091J1321984-06-0101 June 1984 Forwards Environ Review of Zimmer Site Status for Cincinnati Gas & Electric Co, in Response to NRC 840503 Request for Addl Info Re Withdrawal of OL Application.W/ Three Oversize Figures.Apertures Cards Are Available in PDR ML20091A2141984-05-22022 May 1984 Forwards Ohio Edison Annual Rept,1983, Toledo Edison Co 1983 Annual Rept, Duquesne Light Co Annual Rept,1983 & Cleveland Electric Illuminating Co 1983 Annual Rept ML20128E3861984-05-22022 May 1984 FOIA Request for All Agency Records or Info Re Oct 1983 Rept by Judge H Hoyt & Aloot Re NRC Investigations at Facility ML20084P2401984-05-11011 May 1984 Advises That Addl Info for Environ Review of Request to Withdraw OL Application Will Be Provided by 840601,per 1993-09-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20072C9611993-06-18018 June 1993 FOIA Request for Listed OI Repts ML20079D3191991-06-10010 June 1991 Forwards B Tatalovich Correspondence Re Plant ML20235A1251987-12-16016 December 1987 Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs ML20235W0951987-10-0808 October 1987 FOIA Request for All FOIA Requests Made for Zimmer Plant or GE Mark I or II Containment by Cincinnati Gas & Electric, Dayton Power & Light or Columbus & Southern Ohio Electric & FOIA 87-40 ML20209G6751987-03-27027 March 1987 FOIA Request for All Matls Made Available in Accordance W/ FOIA 87-40 & All Matls Produced to Either Plaintiffs in Zimmer Litigation &/Or GE ML20210L2601986-03-20020 March 1986 Forwards Endorsement 31 to Nelia Policy NF-206 ML20099M2911985-03-15015 March 1985 Forwards Endorsement 27 to Nelia Policy NF-249 ML20129B9301985-02-19019 February 1985 FOIA Request for Documents Re DOJ Inquiry Into Potential Wrongdoing by NRC Employees in Dealing W/Tmi & Zimmer Plants & Dh Gamble Testimony from TMI Restart Proceeding ML20100B6181985-01-30030 January 1985 Forwards Payment of Bill D-0089.Fee Paid.W/O Encl ML20101F7621984-12-20020 December 1984 Forwards Endorsement 26 to Nelia Policy NF-249 ML20093M2541984-10-18018 October 1984 Requests Written Verification of Implementation of Site Restoration Plan So CPPR-88 May Be Terminated ML20129J2031984-10-11011 October 1984 FOIA Request for Interim or Final Repts Generated by Ofc of Investigation Re Facility ML20107L6521984-07-19019 July 1984 FOIA Request for All Documents Re Insp Rept 50-358/84-04 ML20105C9801984-07-19019 July 1984 FOIA Request for Documents Re Ofc of Investigation Rept on Facility.If Requested Matls Still Protected,Copies of Matls W/Protected Sections Redacted Requested ML20091L5991984-06-0404 June 1984 Forwards Util 840601 Response to NRC 840503 Request for Addl Info Re Environ Review of Request to Withdraw Application for Ol.Five Oversize Drawings Encl.Aperture Cards Are Available in Pdr.Related Correspondence ML20091J1321984-06-0101 June 1984 Forwards Environ Review of Zimmer Site Status for Cincinnati Gas & Electric Co, in Response to NRC 840503 Request for Addl Info Re Withdrawal of OL Application.W/ Three Oversize Figures.Apertures Cards Are Available in PDR ML20128E3861984-05-22022 May 1984 FOIA Request for All Agency Records or Info Re Oct 1983 Rept by Judge H Hoyt & Aloot Re NRC Investigations at Facility ML20091A2141984-05-22022 May 1984 Forwards Ohio Edison Annual Rept,1983, Toledo Edison Co 1983 Annual Rept, Duquesne Light Co Annual Rept,1983 & Cleveland Electric Illuminating Co 1983 Annual Rept ML20084P2401984-05-11011 May 1984 Advises That Addl Info for Environ Review of Request to Withdraw OL Application Will Be Provided by 840601,per ML20084M0911984-05-0404 May 1984 Advises That Preventive Maint & QA Programs Will Be Discontinued on 840518 Due to Termination of Const & Dismissal of Application.Snm Provisions Will Remain in Effect Until Removal of Matl ML20112H8101984-04-0505 April 1984 FOIA Request for Repts Resulting from Listed Environ Qualification of Equipment Site Audits to Be Placed in Pdr. Access to Any Repts Resulting from Audits Held Since Oct 1982 Also Requested ML20084P3501984-03-14014 March 1984 Requests Response to Encl W & V Smelser 840210 Inquiry Into NRC Attitude Toward Utils.Concerns Include Marble Hill & Bailly Cancellation,Withdrawal of Util Application for Zimmer & Denial of License for Byron Facility ML20114A3121984-03-12012 March 1984 FOIA Request for Facility Nonconformance Repts ML20113D2281984-03-0808 March 1984 FOIA Request for Copies of All Nonconformance Repts on Facility from Start of Const to Present ML20087D1131984-03-0505 March 1984 Forwards Natl Board of Boiler & Pressure Vessel Inspectors to State of Oh Re Util Abandonment of Facility as Nuclear Unit & Board Willingness to Provide Support Should Plant Be Reinstated ML20083P2521984-02-29029 February 1984 FOIA Request for Correspondence Between Util,Hj Kaiser & NRC Referenced in Encl Ohio Civil Rights Commission ML20114A3081984-02-28028 February 1984 FOIA Request for All Region III Insp Repts from Nov 1983 to Present & All Communications Between Region III & Bechtel, Dayton Power & Light Cincinnati Gas & Electric Co Representatives Re Facility ML20102A0241984-02-28028 February 1984 FOIA Request for Region III & IE Repts from Nov 1983 to Present & Communications Between Region III & Util,Bechtel or Kaiser Corp Officials ML20084R6521984-02-24024 February 1984 FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl ML20086P7291984-02-17017 February 1984 Forwards Revised Organization Chart,Effective as of 840217. Organizational Changes Due to Decision to Convert Station from Nuclear to coal-fueled Generating Facility ML20083N2371984-02-17017 February 1984 FOIA Request for Four Categories of Documents Re Facility ML20086P6321984-02-16016 February 1984 Confirms 840202 Telcon Understanding That,Pending Final Commission Action for Withdrawal of Application,No Need Exists to Continue Previously Required Submittals to NRC ML20083N2621984-02-16016 February 1984 FOIA Request for Interim Repts Issued by Ofc of Investigation Re Plant,Including DOJ Rept Re Harassment of QC Inspectors ML20112E1481984-02-10010 February 1984 Appeals Denial of 831123 FOIA Request for 831115 Transcript Re Pending Plant Investigations & Documents Prepared After Discussing 830701 Staff Decision Not to Approve Util Actions for Plant ML20080A9041984-01-30030 January 1984 Forwards Comments on Reactor Controls,Inc (Rci) 830915 Response to Draft IE Info Notice Re Const Deficiencies,Per 831017 Request.Work Orders for Lateral Restraint Beams Not Issued to Rci ML20079S2451984-01-27027 January 1984 Informs of 840120 Agreement to Cease Const of Facility as Nuclear Plant & Convert Plant to coal-fired Facility. Ej Wagner Designated Responsible for Closing Out Nuclear Activities at Facility ML20079P4161984-01-24024 January 1984 Requests Completion of Pending Actions on 831216 Plan to Verify Quality of Const,To Closeout Outstanding Items in 821112 Order to Show Cause & Order Immediately Suspending Const ML20079M8961984-01-20020 January 1984 Forwards Personnel Resumes Inadvertently Omitted from Re Independent Auditor for Plan to Verify Const ML20079N1991984-01-19019 January 1984 Informs That Training Directive ZPM-TR.101 & Master Training Plan Developed for NRC Review ML20079N2161984-01-19019 January 1984 Requests Written Concurrence for Training Activities,As Outlined.Facility Site Directives & Master Training Plan for All Site Training Will Be Provided to Region Iii,Per ML20079F1291984-01-16016 January 1984 Requests NRC Approval of Teledyne Engineering Svcs as Independent Design Review (Idr) Contractor.Teledyne Proposal Forwarded.Criteria Used During Evaluation & Presentation Matl from NRC 840113 Meeting Encl ML20079G1841984-01-13013 January 1984 Forwards Resumes for Principal Positions Noted on Organization Chart in Section IV of Ebasco 831205 Proposal Re Independent Auditor for Plan to Verify Const ML20080F0441984-01-13013 January 1984 Notifies of Approval of Resolution R/18-1984 Expressing City of Cincinnati Council Dissatisfaction Over NRC Failure to Require third-party Independent Review of Facility. Resolution Encl ML20086K1081984-01-13013 January 1984 Forwards Council of City of Cincinnati Resolution R/18-1984 Which Expresses Dissatisfaction Over NRC Failure to Require third-party Independent Review of Facility ML20079H2891984-01-11011 January 1984 Submits Partial Response to Util Plan to Verify Quality of Const for Facility.Counsel for Miami Valley Power Project Decision Not to Attend 840111 Public Meeting Clarified. Related Info Encl ML20086L8371984-01-11011 January 1984 Requests Development of Proposed Facility Public Oversight Committee.Committee Establishment Would Inspire Public Confidence ML20079E2401984-01-10010 January 1984 Forwards Quality Confirmation Program, Monthly Rept for Dec 1983,per Rf Warnick ML20079F3731984-01-10010 January 1984 Forwards Packet of Newspaper Articles Re Facility.Packet Acts as Chronological Summary of Major Events During 14 Months Prior to 831201 ML20080F0291984-01-10010 January 1984 Notifies of 840105 Adoption of Motion Advising NRC That Limiting Public Participation to Time Permitting at 840111 Meeting Not in Best Interest of City of Cincinnati or Citizens ML20083J1491984-01-10010 January 1984 Advises That Cincinnati City Council Adopted Vice-Mayor M Spencer Encl Motion Before Council Opposing Limited Public Participation at 840111 Meeting Between NRC & Util 1993-06-18
[Table view] Category:UTILITY TO NRC
MONTHYEARML20100B6181985-01-30030 January 1985 Forwards Payment of Bill D-0089.Fee Paid.W/O Encl ML20091J1321984-06-0101 June 1984 Forwards Environ Review of Zimmer Site Status for Cincinnati Gas & Electric Co, in Response to NRC 840503 Request for Addl Info Re Withdrawal of OL Application.W/ Three Oversize Figures.Apertures Cards Are Available in PDR ML20091A2141984-05-22022 May 1984 Forwards Ohio Edison Annual Rept,1983, Toledo Edison Co 1983 Annual Rept, Duquesne Light Co Annual Rept,1983 & Cleveland Electric Illuminating Co 1983 Annual Rept ML20084P2401984-05-11011 May 1984 Advises That Addl Info for Environ Review of Request to Withdraw OL Application Will Be Provided by 840601,per ML20084M0911984-05-0404 May 1984 Advises That Preventive Maint & QA Programs Will Be Discontinued on 840518 Due to Termination of Const & Dismissal of Application.Snm Provisions Will Remain in Effect Until Removal of Matl ML20086P7291984-02-17017 February 1984 Forwards Revised Organization Chart,Effective as of 840217. Organizational Changes Due to Decision to Convert Station from Nuclear to coal-fueled Generating Facility ML20086P6321984-02-16016 February 1984 Confirms 840202 Telcon Understanding That,Pending Final Commission Action for Withdrawal of Application,No Need Exists to Continue Previously Required Submittals to NRC ML20080A9041984-01-30030 January 1984 Forwards Comments on Reactor Controls,Inc (Rci) 830915 Response to Draft IE Info Notice Re Const Deficiencies,Per 831017 Request.Work Orders for Lateral Restraint Beams Not Issued to Rci ML20079S2451984-01-27027 January 1984 Informs of 840120 Agreement to Cease Const of Facility as Nuclear Plant & Convert Plant to coal-fired Facility. Ej Wagner Designated Responsible for Closing Out Nuclear Activities at Facility ML20079P4161984-01-24024 January 1984 Requests Completion of Pending Actions on 831216 Plan to Verify Quality of Const,To Closeout Outstanding Items in 821112 Order to Show Cause & Order Immediately Suspending Const ML20079N1991984-01-19019 January 1984 Informs That Training Directive ZPM-TR.101 & Master Training Plan Developed for NRC Review ML20079N2161984-01-19019 January 1984 Requests Written Concurrence for Training Activities,As Outlined.Facility Site Directives & Master Training Plan for All Site Training Will Be Provided to Region Iii,Per ML20079F1291984-01-16016 January 1984 Requests NRC Approval of Teledyne Engineering Svcs as Independent Design Review (Idr) Contractor.Teledyne Proposal Forwarded.Criteria Used During Evaluation & Presentation Matl from NRC 840113 Meeting Encl ML20079E2401984-01-10010 January 1984 Forwards Quality Confirmation Program, Monthly Rept for Dec 1983,per Rf Warnick ML20083J1551984-01-0606 January 1984 Forwards Rev 2 to Vols 1 & 2 of Environ Qualification Rept for Class IE Equipment & Vol 1 of Environ Qualification Rept for Mechanical Equipment ML20083J7881983-12-28028 December 1983 Responds to IE Bulletin 83-06, Nonconforming Matls Supplied by Tube-Line Corp Facilities at Long Island City,Ny;Houston, Tx & Coral Stream,Il. No Subj Matl Used in safety-related Sys.Approx 15 Manhours Expended in Review ML20083D6601983-12-22022 December 1983 Forwards Continuation of Const Plan, Submitted in Response to Section IV.B.(2)(b) of 821112 Order to Show Cause & Order Immediately Suspending Const.Response to 831028 & 1115 Questions Also Encl ML20083D6521983-12-22022 December 1983 Forwards Continuation of Const Plan, Submitted in Response to Section IV.B.(2)(b) of 821112 Order to Show Cause & Order Immediately Suspending Const (CLI-82-33) ML20083B6941983-12-19019 December 1983 Forwards Plan to Verify Quality of Const, in Response to Section IV.B.(2)(a) of NRC 821112 Order to Show Cause & Order Immediately Suspending Const (CLI-82-33) ML20083F6251983-12-16016 December 1983 Forwards Completed Facility Staffing Questionnaire,Per NRC 831206 Submittal.Eleven Reactor Operators & 35 Senior Reactor Operators Assigned to Shift Work ML20083B7171983-12-16016 December 1983 Forwards Plan to Verify Quality of Const, in Response to Section IV.B.(2)(a) of NRC 821112 Order to Show Cause & Order Immediately Suspending Const.Plan Includes Responses to Questions in 831028 & 1115 Ltrs ML20083G6181983-12-14014 December 1983 Notifies That WT Gott & RW Link Will Attend 840111 Meeting to Discuss Scheduling Problems W/Nrc Exam Process ML20083F9061983-12-14014 December 1983 Forwards Nov Monthly Status Rept for Quality Confirmation Program,Per ML20082V2151983-12-0909 December 1983 Forwards Correction to 831006 Response to NRC Request for Info Re Control of Heavy Loads.All Cranes & Hoists Purchased to Sargent & Lundy Specs ML20083A6641983-12-0808 December 1983 Forwards 831108 & 09 Deficiency Repts Re Evaluation of Cable Tray & Conduit Support Welding & Adequacy of Threaded Nelson Studs Used on Cable Tray Supports & Structural Steel Bolting ML20082T0801983-12-0808 December 1983 Submits Line Inadvertently Omitted from Page 20 of 831109 Response to NRC Question 5 Re Course of Action ML20083E4061983-12-0606 December 1983 Forwards Ebasco Svcs,Inc Proposal, Audit of Program to Verify Quality of Const & Continuation of Const Plan, for NRC Approval,Per 821112 Order to Show Cause Requiring Independent Auditor ML20082S5051983-11-30030 November 1983 Forwards Corrected Affidavit Replacing Affidavit Submitted w/830930 Application for Withholding from Public Disclosure Rev 1 to 003-1R-001, Safety Parameter Display Sys.. ML20082N0941983-11-29029 November 1983 Forwards Comments on Torrey Pines Technology 831116 Comments on Util Course of Action.Operations Personnel Will Be Intimately Involved in Planning,Managing & Executing Startup Testing Program ML20082M2461983-11-29029 November 1983 Suppls 831121 Response to NRC Re Util Course of Action.Responses to Questions 16,17 & 2 Encl.Responses Do Not Reflect Replacement of Hj Kaiser W/Bechtel as Constructor ML20082H5891983-11-23023 November 1983 Discusses Proposed Course of Action for Verification of Const Quality & Completion of Const in Response to NRC .Bechtel Will Assume Responsibilities of Constructor,W/Kaiser Co Performing Limited Role ML20087J8181983-11-22022 November 1983 Requests Addl 60 Days to Accomplish Review of Work Performed by Reactor Controls,Inc,In Response to NRC 831017 Draft Info Notice.Extension Required Due to Physical Walkdown of Selected Sys ML20082H7801983-11-21021 November 1983 Forwards Responses to NRC Questions Re Course of Action,Plan for Vertification of Quality of Const & Continuation of Const Plan.W/O Response to Plan Continuation ML20082E7991983-11-21021 November 1983 Forwards Responses to NRC Questions Re Scope of Plan to Verify Quality of Const Raised in Encl 1 to 831115 Submittal ML20082J0001983-11-18018 November 1983 Provides Addl Info Re Scope of Plan to Verify Const Quality & Extent of Hardware Insps,In Response to Questions Raised at 831101 Meeting.Scope Will Encompass All safety-related Structures,Sys & Components ML20082E8141983-11-18018 November 1983 Forwards Addl Info in Response to Questions Raised During 831101 Meeting Re Scope of Plan to Verify Quality of Const & Extent of Insp of Hardware.Visual Insp Will Be Conducted on Hvac,Piping & Electrical Sys ML20082K5241983-11-15015 November 1983 Forwards Quality Confirmation Program, Monthly Rept for Oct 1983 ML20082E7381983-11-15015 November 1983 Forwards Certificate of Svc for Amend 152 in Form of Rev 98 to FSAR ML20082E8401983-11-0909 November 1983 Forwards Responses to Questions in Encl 1 of NRC Re Planned Course of Action.Responses to Encls 2 & 3 Will Be Provided W/Plan for Verification of Quality of Const & Continuation of Const Plan ML20081F3211983-10-31031 October 1983 Comments on Course of Action (Coa) Submitted to NRC by Cincinnati Gas & Electric on 831005.COA Fails to Recognize Dayton Power & Light (Dp&L) Investment by Not Giving Dp&L Meaningful Participation in Project Oversight ML20081F2671983-10-27027 October 1983 Forwards Response to NRC 821112 Order to Show Cause & Order Immediately Suspending Const.Response Includes Charters for Oversight Committee & Advisory Staff & Lists of Bechtel,Ge, Sargent & Lundy & Util Personnel Assigned to Facility ML20082B5581983-10-26026 October 1983 Requests Concurrence in Outlined Approach to Independent Design Review.Approval Necessary Prior to Contract Award. Bidders List,Rfp & Portions of Order Suspending Const Encl ML20081F2201983-10-25025 October 1983 Forwards Aug & Sept 1983 Quality Confirmation Program Status Repts & Summary Sheet ML20081J9971983-10-21021 October 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-358/83-17.Corrective Actions:Policy for Reporting Deficiencies,Per 10CFR50.55(e),revised to Provide Immediate Corrective Action to Ensure 30-day Written Submittal ML20078R4961983-10-21021 October 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-358/83-12.Corrective Actions:Procedure Mcar 83-13, Reverification of CG&E Corrective Action Program, Developed & Personnel Adequately Trained ML20080U5141983-10-18018 October 1983 Responds to IE Bulletin 83-05 Re ASME Nuclear Code Pumps & Spare Parts Mfg by Hayward Tyler Pump Co.After Review of Purchasing Documentation & Investigation of Suppliers & Subvendors,Util Determined IE Bulletin Not Applicable ML20078N4401983-10-12012 October 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-358/81-13.Provides Addl Info Pending Changes to ASME Code,Paragraph Nx 4427 ML20078M0361983-10-11011 October 1983 Summarizes Proposed Welding Reinsp Program of Class I Structural Steel as Discussed During 830811 Site Meeting. Welds Found W/Major Deficiencies Will Be Reworked.Program Details Encl ML20085J5941983-10-0707 October 1983 Forwards Certificate of Svc of Amend 151 to 830930 Application for Licenses in Form of Rev 97 to FSAR ML20078G4821983-10-0606 October 1983 Forwards Response to Phase I of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, Per Bj Youngblood 830811 Request for Addl Info.All Cranes & Hoists Purchased to Sargent & Lundy Specs 1985-01-30
[Table view] |
Text
THE CINCINNATI GAS & ELECTRIC COMPANY d -
q y clNCINNATI, OHIO 45208 December 22, 1983 LOZ-83-0254 J. WILLIAM S. Jft stN*OmveCE #REsaDENT muC6 TAR OptmATechs Docket No. 50-358 U.S. Nuclear Regulatory Commission Recion III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J.G. Keppler Regional Administrator Gentlemen:
RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 CONTINUATION OF CONSTRUCTION PLAN (CCP) .
W.O. 57300, JOB E-5590, FILE NO. 956C Attached in accordance with Section IV.B(2) (b) of the Commission's November- 12, 1982, " Order to Show Cause and Order Immediately Suspending Construction," is the CG&E Construction (j Comoletion Plan (CCP) for the Zimmer Facility. The CCP contains responses to cuestions contained in your letters dated October 28, 1983 and November 15, 1983, as they pertain to this program.
These responses reference the section within the CCP which provides a more detailed response.
As indicated in my letter dated November 23, 1983, the scope of the independent audit of the PVQC recuired by the Commission's
- order has been expanded to cover the QA/QC aspects of the CCP so that all QA/QC activities through completion of the plant are subject to independent audit.
Should you have any cuestions, please let me know.
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPAl;Y
^
~
By MN c* j
. WILLIAMS, JR.
SENIOR VICE PRESIDENT GCP/sfr
(
8312280185 831222 PDR ADOCK 05000358 A pon
O Mr. J.G. Keppler Regional Administrator December 22, 1983 LOZ-83-0254 Page 2 cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Resident Site Supervisor ATTN: W.M. Hill NRC Zimmer Project Inspector, Region III ATTN: E. R. Schweibinz NRC Office of Nuclear Reactor Regulation ATTN D.G. Eisenhut '
. L.L. Kintner NEC Office of Executive Legal Director ATTN: Jim Lieberman C:5 i
9 O
12/22/83
() RESPONSES TO NRC QUESTIONS ON COA ROUND 1 (Reference NRC Letter J.G. Keppler to J. Williams, Jr. Dated 10/28/83,
! Enclosure 3)-
Does CG&E propose to resume work in an area or on a system for Question 1. which the PVQC has not been completed and unacceptable conditions resolved? If yes, how will the licensee irsure that ,
any work performed under this condition by the CCP will not have to be redone based on findings by the PVQCf Respo'n se: Yes it is CG&E's intent to perform CCP work in an area or on a system prior to PVQC being completed. The Continuation of Construction Plan (CCP) specifies that the initiation of construction work will not commence until the specific element of work (system, subsystem, component, etc.) has been released by PVQC. In this manner CG&E can ensure that the construction l work will not pre-empt the PVQC effort. Ref erence CCP, Sections 1.4 and 7.2. Also, see answer to Question 8 of Round 2 attached.
O
~ Question 2.
Under any situation, will the group responsible for identifying a nonconformance also be responsible for disposition of the ce rerma cer O The cognizant field engineers or QA/QC personnel may Response: Yes.
initiate an NCR. The field engineering group may identify the disposition to correct the condition to comply withOther the engineering requirements (i.e. rework or reject).
dispositions (i.e. use-as-is or repair) will be approved by Engineering. The disposition and the resultant work will be I
approved by QA/QC personnel. Reference CCP Section 5.4 and Appendix 10.
i Will all nonconformances be verified, and who will conduct this Question 3.
verification?
Response
Nonconformance reports will be validated by dhe cognizant QA/QC activity. Upon completion of the actions identified in the disposition instructions, reinspections will be performed as specified and recorded on the nonconformance reports, Reference CCP Section 5.4 and Appendix 10.
i l
c.
v gre
- e.gus-- . - -- w ,-r-- --e-.g- ---q rn--wa -.iy*p-p y,pr ,--ww r-wwy-wory , ywwy g --v--,-,ww9e,,g+- -ec-q,, . - --- - . = - ---w--.y,,-.m m-- -gei--r--y
12/22/83 P ge 2 Question 4. For each draf t nonconformance which is not verified to be a nonconforming condition, will a copy of the draf t be returned to the initiator with an explanation detailing the reason for
- lack of verification?
Response: Yes. Af ter each Nonconformance Report (NCR) is written it will be signed by the initiator, logged, and forwarded to the applicable QA/QC activity for review and validation. Once an NCR has been logged, it cannot be voided. Should it become necessary to discontinue processing the NCR for reasons of redundance, erroneous reporting, or other similar conditions, l
the cognizant QA/QC activity will document the basis for the action and sign-off the appropriate block. NCRs that have been logged, but not validated, shall be maintained as a quality l record with a qualifying statement as to why the NCR was not processed. If the NCR originator disagrees with the decision not to validate the NCR, he has the right of recourse to as high a level of management as necessary for resolution'.
Reference CCP Appendix 10.
Qhestion 5. If a design review is not performed on a particular system, how t will the project director assure that the drawings provided to I the constructor are acceptable for construction and include sufficient detail for that activity to be performed in.an acceptable manner?
O '
Bechtel has the responsibility for ' managing work of those
Response
performing construction-related design, under the CCP and PVQC prograns. In addition, there will be special desip engineering assignments which Bechtel may be assiped to either manage or perform. The greatest part of all remaining construction will be performed directly by Bechtel.
Where Bechtel manages others performing design engineering ,
Bechtel will effect continuing surveillance of the work of the responsible design engineering organizations through Bechtel's on-site engineering group. This will include monitoring the adequacy of design techniques, design calculations and design drawings for construction and will be assisted by direct feedback from Bechtel's construction and QC groups. In addition, Bechtel's quality groups will audit and otherwise monitor work of the responsible design engineering organizations under the Bechtel quality program. Reference CCP Section 5.5.
i O
e- . - - -- , _y ,,. - , , . . . -m
12/22/83 Pega 3 A Will the Project Director generate any drawings to supplement
(_) Question 6.
S&L drawings? What is the nature of these drawings?
Response: At present, it is not planned that Bechtel will generate any design drawings for construction, to supplement the S&L drawings. However, Bechtel will have the capability of discharging special design engineering assigaments which could involve drawings, but the nature of these is not now known. In addition, the Bechtel construction groups which will be directly performing construction, will develop sketches and other construction aids, but these will not be used to establish basic design requirements to which inspections may be made under the Bechtel quality program. Bedhtel field engineers (part of the construction group) will probably develop designs within a limited scope, for installation of such items as small pipe and instrumentation tubing. These field engineering drawings will be prepared in accordance vida criteria provided by the responsible design engineering organizations and will be checked or approved in accordance.
with accepted procedures.
Question 7. Why is Bechtel being made responsible for the review of CG&E's QA program?
Response: As part of the continuing effort to upgrade the Zimmer QA
.fr3
(_,1 Program, CG&.E has requested Bechtel as part of their Project Director's role to make a comprehensive review of the CG&E QA Program and make recommendations regarding any required improvements to the program. This review will take advantage of Bechtel's experience in the Nuclear Quality Assurance field and ensure compliance with Appendix B to 10CFR 50 and the QA commitments in the Safety Analysis Report.
Question 8. Will work packages include QA/QC documents / records? If yes, who will control these packages prior to completion.
Construction or Quality Assurance Department?
Response: The work packages will include or reference all documents necessary to accomplish and verify work covered by the package including inspection documents. Prior to co,mpletion these packages will be controlled by Construction Document Control in accordance with Quality Program requirements. QA/QC surveillance and monitoring will be performed to ensure die documents are controlled in accordance with the Quality Program requirements. Reference CCP Sections 3.7 and 7.3.
nv
12/22/83 PKg3 4
() Question 9. Will all records be reviewed for completeness and technical adequacy prior to transmittal to the records vault?
Response: During PVQC existing records will be reviewed for completeness and accuracy and PVQC documents will be generated to give evidence of those reviews and their results. The PVQC generated records will be reviewed and countersigned by QA/QC personnel.
During CCP, all Bechtel generated records will be reviewed for completeness and accuracy with a " bottom-line" signature i applied. Other CCP records, S&L, GE and contractors, will be reviewed on a sampling basis by Bechtel QA/QC personnel.
Reference CCP Section 3.7.2.
Question 10. Will a record be maintained by signature of the person conducting this review? How will records currently in the vault be controlled during the PVQC7 Response: Records reviewed will be signed or initialed by the reviewer on the record or on records traceable to the reviewed record.
(Ref. signature log). A PVQC records control group is being established with appropriate procedures to support PVQC. This l
group will receive records to be reviewed by PVQC by transmittal from the central records control group. Procedures
(,gj for their operation which will include all control elements necessary, comply with the Project QA program, and be reviewed and approved by Bechtel QC records management prior to implementation.
Question 11. During the PVQC, will the QC records / documents be reviewed by QC personnel in the same discipline as the document? If not ,
who will conduct a review of these records?
Response: Yes, the PVQC organization is established on a system or area discipline team concept. All field engineering and QA/QC reviews will be performed on a discipline oriented basis by personnel experienced in that discipline.
Question 12. Does control of inter'ference between CCP on a system, subsystem, or area and PVQC, require identification of all outstanding issues relative to PVQC prior to permitting construction to resume? Must the outstanding items be dispositioned prior to resumption of construction?
e
12/22/83 Page 5
() Response: In order to ensure that construction does not interfere with or preempt the conduct of PVQC or implementation of potential rework on systems or areas for which PVQC has not been completed controls are established as outlined in die CCP. .
Prior to commencing any construction work on a safety-related system, structure, or component, PVQC will release d2e work only if they are satisfied it will not interfere with the verification process. Outstanding issues relative to a system, structure or component will be identified and they will be dispositioned prior to physical work if the PVQC interface criteria would otherwise be violated.
O 9
W S
RESPONSES TO NRC QUESTIONS ROUND 2 (Reference NRC Letter J.G. Keppler to J. Williams, Jr. Dated 11/15/83, Enclosure 2)
Question 8. CG&E plans to submit the CCP shortly af ter the submittal of the PVQC. The Bechtel Project Director plans to have the organization unit conducting the PVQC be separate from die organization unit conducting the CCP in recogaition of the need to ensure that the completion of construction does not l interfere with or p.e-empt the verification of quality. The l proposed CCP is designed to proceed with construction of a j safety-related system or area af ter it has been determined that such construction will not affect the verification of dae quality of that system or area. Describe the planned method for resolving interferences between the simultaneous processes of verifying quality and completing construction. (Page 39, Volume I)
Construction of a system, subsystem, or area will be controlled i
Response
to assure that construction does not interfere with or preempt the conduct of the PVQC or implementation of potential rework on systems or areas for which verification has not been completed. These controls, detailed in the Continuation of Construction Plan include measures such as:
o Specific training of construction personnel regarding PVQC interface restrictions.
o Surveillance of construction personnel to assure compliance with the PVQC interface restrictions.
o Frequent schedule meetings to coordinate interface activities of PVQC and CCP personnel.
o Releases by PVQC based on evaluation and conclusion d2at a particular portion of CCP work will not interfere with-PVQC activities.