ML20090L726: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20090L726
| number = ML20090L726
| issue date = 10/01/1976
| issue date = 10/01/1976
| title = Forwards Application for Amend to License DPR-22,revising TS Re Hydraulic Snubber Operability & Surveillance Requirements to Conform to Recommended TS in NRC 751217 Ltr
| title = Forwards Application for Amend to License DPR-22,revising TS Re Hydraulic Snubber Operability & Surveillance Requirements to Conform to Recommended TS in NRC
| author name = Mayer L
| author name = Mayer L
| author affiliation = NORTHERN STATES POWER CO.
| author affiliation = NORTHERN STATES POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9102120575
| document report number = NUDOCS 9102120575
| title reference date = 12-17-1975
| package number = ML20090L727
| package number = ML20090L727
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
Line 31: Line 32:
                                                                     #8/Tr''t '
                                                                     #8/Tr''t '
MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 License Amendment Request dated October 1. 1976 Attached are three oriB inals and 37 confomed copies of a request for change of Technical Specifications, Appendix A of the Provisional Operating License for the Monticello Nuclear Generating Plant. This change request has been reviewed by the Monticello Operations Cournittee and the Safety Audit Comittee.
MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 License Amendment Request dated October 1. 1976 Attached are three oriB inals and 37 confomed copies of a request for change of Technical Specifications, Appendix A of the Provisional Operating License for the Monticello Nuclear Generating Plant. This change request has been reviewed by the Monticello Operations Cournittee and the Safety Audit Comittee.
The proposed changes revise the Technical Specifications coverMg safety related hydraulic snubber operability and surveillance requiremet.ts to conform to the recomended Technical Specifications contained in a letter dated December 17, 1975 from Mr Dennis L Ziemann, USNRC.
The proposed changes revise the Technical Specifications coverMg safety related hydraulic snubber operability and surveillance requiremet.ts to conform to the recomended Technical Specifications contained in a {{letter dated|date=December 17, 1975|text=letter dated December 17, 1975}} from Mr Dennis L Ziemann, USNRC.
We have determined that these changes do not invalve an unreviewed safety question.
We have determined that these changes do not invalve an unreviewed safety question.
Yours very truly, L 0 Mayer, PE l
Yours very truly, L 0 Mayer, PE l

Latest revision as of 08:54, 25 September 2022

Forwards Application for Amend to License DPR-22,revising TS Re Hydraulic Snubber Operability & Surveillance Requirements to Conform to Recommended TS in NRC
ML20090L726
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/01/1976
From: Mayer L
NORTHERN STATES POWER CO.
To: Stello V
Office of Nuclear Reactor Regulation
Shared Package
ML20090L727 List:
References
NUDOCS 9102120575
Download: ML20090L726 (2)


Text

__

t .

NSED NOMTHEMN 5TATES POWEM COMPANY w iN w a m po s.e s. M lN N E S 4 00 ght .! e s

(p ,y' October 1, 1976 - Ig N' '

55 y:b' fi a n[.?) p Mr Victor Stello, Director CM 90'y Y # g . 2 GCT4 1976 1 J.. m Division of Operating Reactors A U S Nuclear Regulatory Cocunission I

N Ig 'gN V D'"E!'.

n7 Washington, DC 20555 9 '

b w A

Dear Mr Stello:

  1. 8/Trt '

MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 License Amendment Request dated October 1. 1976 Attached are three oriB inals and 37 confomed copies of a request for change of Technical Specifications, Appendix A of the Provisional Operating License for the Monticello Nuclear Generating Plant. This change request has been reviewed by the Monticello Operations Cournittee and the Safety Audit Comittee.

The proposed changes revise the Technical Specifications coverMg safety related hydraulic snubber operability and surveillance requiremet.ts to conform to the recomended Technical Specifications contained in a letter dated December 17, 1975 from Mr Dennis L Ziemann, USNRC.

We have determined that these changes do not invalve an unreviewed safety question.

Yours very truly, L 0 Mayer, PE l

Mantager, Nucicar Support Services l

LOM/DM4/ deb cc: G Charnoff J G Keppler MPCA Attn: J W Ferman MECCA Attn: H J Vogel S J Gadler l

l l

9102120575 761001 DR ADOCK 05 3 10037