Letter Sequence Other |
---|
|
|
MONTHYEARML20134J1741985-08-22022 August 1985 Responds to Generic Ltr 85-12 Re Implementation of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Reactor Coolant Pump Manually Tripped by Depressing Trip Pushbuttons on Panel Located in Control Room Project stage: Other ML20199D4581986-06-10010 June 1986 Forwards Preliminary Review Results & Comments Re Responses to Generic Ltr 85-12 Concerning Implementation of TMI Action Item II.K.3.5, Automatic Trip Reactor Coolant Pumps. Alternatives for Completing Review Listed Project stage: Other ML20214K7481986-11-24024 November 1986 Forwards Addl Info Re Reactor Coolant Pump Trip,Per 860925 Request Project stage: Other 1986-11-24
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F8011999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0171999-08-13013 August 1999 Confirms Conversation Between M Cash & M Franovich on 990806 Re Mgt Meeting,Scheduled for 990917 to Present self- Assessment of Plant Performance.Meeting Will Be Held in Atlanta,Ga ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20210Q3701999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date in Order to Register Individuals to Take Exam ML20210H7691999-07-21021 July 1999 Submits Summary of 990715 Meeting at Facility Re Presentation of Results of Most Recent Periodic Ppr.List of Meeting Attendees Encl ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20210E1931999-07-13013 July 1999 Forwards Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20196J4381999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid Version 2 ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195D5691999-06-0303 June 1999 Submits Ltr to Facilitate Closing of Inspector Follow Up Item 50-369,370/97-15-05,re Revising Site Drawings in UFSAR Into Summary one-line Flow Diagrams,Per NRC 990327 Telcon ML20195F1851999-06-0202 June 1999 Forwards Insp Repts 50-369/99-03 & 50-370/99-03 on 990328- 0508.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20195E8771999-06-0202 June 1999 Confirms Telcon with M Cash on 990524 Re Public Meeting for 990715.Purpose of Meeting to Discuss Results of NRC Most Recent PPR ML20207D0521999-05-21021 May 1999 Informs That in Telcon on 990519 Between a Orton & Rf Aiello Arrangements Made for Administration of Initial Written Exam for McGuire Nuclear Station on 990603.Exam Will Be Administered at Catawba Simultaneously with Written Exam ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206R0791999-05-13013 May 1999 Forwards Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195D5691999-06-0303 June 1999 Submits Ltr to Facilitate Closing of Inspector Follow Up Item 50-369,370/97-15-05,re Revising Site Drawings in UFSAR Into Summary one-line Flow Diagrams,Per NRC 990327 Telcon ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20206R0791999-05-13013 May 1999 Forwards Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206S9151999-05-11011 May 1999 Forwards Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. Section 16.11-16.2 Has Been Revised to Apply Guidance of NUREG-0133 for Performing Gaseous Effluent Dose Pathway Calculations ML20206K1341999-05-0303 May 1999 Forwards 1999 Interim UFSAR for McGuire Nuclear Station. UFSAR Update Includes Items Relocated During Improved Tech Specs Implementation.Next Regular UFSAR Update as Required 10CFR50.71(e) Is Due in Oct 1999 ML20206F3321999-04-28028 April 1999 Forwards Annual Radioactive Effluent Release Rept for 1998 for McGuire Nuclear Station. Listed Attachments Are Contents of Rept.Revised ODCM Was Submitted to NRC on 990203 ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20206B4791999-04-20020 April 1999 Requests Exemption from GDC 57 Re Reactor Containment - Closed Sys Isolation Valves,As Described in 10CFR,App a for Containment Penetrations M393 & M261.Detailed Technical Evaluation & Justification for Exemption Request,Encl ML20205S9731999-04-19019 April 1999 Submits Info Re Quantity of SG Tubes Inspected,Tube Indications of Imperfections & Tubes Removed from Svc by Plugging,Per TS 5.6.8,part B 05000369/LER-1999-001, Forwards LER 99-01(S)-00 Re Contract Employee Submittal of False Info Resulting in Gaining Unescorted Access.No Licensee Planned Corrective Actions or Other Regulatory Commitments Were Identified as Result of Incidence1999-04-16016 April 1999 Forwards LER 99-01(S)-00 Re Contract Employee Submittal of False Info Resulting in Gaining Unescorted Access.No Licensee Planned Corrective Actions or Other Regulatory Commitments Were Identified as Result of Incidence ML20205P8891999-04-13013 April 1999 Forwards Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for Feb 1999 Encl ML20206K3561999-04-13013 April 1999 Forwards Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual. Significant Changes Are Marked by Vertical Bars on Right Margin ML20205K5131999-04-0707 April 1999 Forwards Complete Response to NRC 981209 & 990105 RAIs on Question 11 Re LARs for McGuire & Catawba Nuclear Stations. Addl Info Received from W & Contained in Encl W ML20205B6011999-03-23023 March 1999 Requests That NRC Place Technical Interface Agreement 97-02 Re URI 96-11-03,raising Operability & Design Criteria Conformance Issues Re Hydraulic Snubbers Installed at Plant & NRR Response on Dockets to Provide Record of Issue ML20205C4611999-03-23023 March 1999 Submits Correction to Violation Against 10CFR50 App B, Criterion VII, Control of Purchased Matl,Equipment & Svcs, Issued to McGuire Nuclear Station on 980807 ML20205B6161999-03-23023 March 1999 Provides Addl Info & Correction to Typo in Re License Bases Record Change Re License Amend Submittals ,approved as FOL NPF-9 & NPF-17,amends 184 & 166, respectively.Marked-up TS Pages,Encl ML20204J0051999-03-19019 March 1999 Forwards Response to 990127 & 28 RAIs Re GL 96-05 for Catawba & McGuire Nuclear Stations ML20204E1791999-03-18018 March 1999 Reflects 990318 Telcon Re License Bases Record Change for License Amend Submittals ,approved as Amends 184 & 166,respectively for Licenses NPF-9 & NPF-17.TS Pages Encl ML20204C8821999-03-15015 March 1999 Forwards Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for Jan 1999 Encl ML20207C2071999-02-25025 February 1999 Informs of Revised Expected Submittal Date of Proposed License Amend Presented at 990127 Meeting Re Soluble Boron & Boraflex.Util Plans to Submit Proposed License Amend in First Quarter of 1999 ML20207C7691999-02-22022 February 1999 Forwards Annual Occupational Radiation Exposure Rept for 1998. Rept Provides Tabulation of Number of Station,Utility & Other Personnel Receiving Exposure Greater than 100mRem/yr Followed by Total Dose for Each Respective Worker ML20207C6851999-02-22022 February 1999 Forwards Revised TS Bases Pages,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20206S3341999-01-28028 January 1999 Forwards Proprietary & non-proprietary Responses to NRC 981209 & 990105 RAIs Re Util Lars,Permitting Use of W Fuel at McGuire & Catawba Stations.Proprietary Info Withheld,Per 10CFR2.790 ML20199E0081999-01-12012 January 1999 Forwards MOR for Dec 1998 & Revised MOR for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199C9861999-01-0707 January 1999 Forwards Annual Lake Norman Environ Summary Rept for 1997,as Required by NPDES Permit NC0024392,including Detailed Results & Data Comparable to That of Previous Years.With Corrected Pages 3 & 19 to 1994-95 Lake Norman Creel Rept 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L0101990-09-19019 September 1990 Provides Addl Response to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per .Corrective Action:Operations & Compliance Mgt Further Examined Event & Concluded That Trains Vc/Yc Inoperable Per Special Order ML20059L0091990-09-18018 September 1990 Informs of Delay in Response to Violations Noted in Insp Repts 50-369/90-14 & 50-370/90-14.Delay Due to Ongoing Review ML20059L5491990-09-14014 September 1990 Forwards Proprietary Response to Question Re Scope of Review of Topical Rept, Safety Analysis Physics Parameter & Multidimensional Reactor Transients Methodology, Per & 900723 Meeting.Response Withheld ML20059J7121990-09-14014 September 1990 Forwards Monthly Operating Rept for Aug 1990 for McGuire Nuclear Station Units 1 & 2 & Monthly Operating Status Rept for Jul 1990 ML20059L5521990-09-14014 September 1990 Forwards Response to 18 Questions Re Topical Rept DPC-NE-2004,per NRC 900802 Request for Addl Info.Encl Withheld (Ref 10CFR2.790) ML20065D4671990-09-11011 September 1990 Informs of Delay in Response to Violation Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per Commitment in ML20064A8031990-09-10010 September 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-369/90-13 & 50-370/90-13.Corrective Actions:Procedures Dealing W/Fuel Handling Will Be Enhanced by Adding Sign Off to Sections Which Ref Fuel Handling in Tech Specs ML20059G3011990-09-0404 September 1990 Forwards Response to NRC 900327 Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20064A5741990-09-0404 September 1990 Discusses Re Info to Support Util Position Relative to Resolving Issue of Main Steam Line Breaks Inside Ice Condenser Containments & Requests That Info Be Withheld (Ref 10CFR2.790) ML20064A5671990-09-0101 September 1990 Advises That Corrective Actions Re Violation of Insp Rept 50-369/89-01 & 50-370/89-01 Will Be Completed by 910101 ML20059D3461990-08-30030 August 1990 Forwards Semiannual Effluent Release Rept for First Half of CY90 & Revs to Process Control Program ML20059G9141990-08-22022 August 1990 Forwards Public Version of Revised Epips,Including Change 0 to RP/O/A/5700/01,Change 0 to RP/O/A/5700/02 & Change 0 to RP/O/A/5700/03 ML20059D1901990-08-22022 August 1990 Responds to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11.Corrective Actions:Valves VC-1,VC-2,VC-3,VC-4, VC-9,VC-10,VC-11 & VC-12 Reopened Upon Discovery of VC-1 - VC-4 Being Closed & Procedure IP/0/13/3006/09 Revised ML16259A2391990-08-22022 August 1990 Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo ML20059C1201990-08-20020 August 1990 Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement ML20059B4451990-08-20020 August 1990 Requests That NRC Approval of Original Relief Request 89-02 Be Extended to Include Changes to Mods MG-22233 & MG-22243 as Described.Hydrostatic Testing Impractical Due to Inadequacy of Test Boundaries ML20059C1591990-08-17017 August 1990 Suppls by Providing Addl Info to Support Util Position Re Anl Confirmatory Analysis of Main Steamline Breaks in Ice Condenser Plants.Encl Withheld ML20063Q0901990-08-15015 August 1990 Forwards Monthly Operating Repts for Jul 1990 for McGuire Nuclear Station Units 1 & 2 & Revised Rept for June 1990 ML20063Q2671990-08-14014 August 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo ML20058N0181990-08-0808 August 1990 Forwards Response to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20063Q0181990-08-0707 August 1990 Confirms That Planned Corrective Actions Listed in Paragraph 3 of Insp Repts 50-369/90-10 & 50-370/90-10,appropriately Described ML20056A9541990-08-0101 August 1990 Provides Final Response to NUREG-0737,Item II.D.1, Performance Testing of Safety Relief Valves. Util Will Change Seal Configuration for Existing Valves to Seal on Steam Medium & Install Continuous Drain for Loop Piping ML20058L4061990-08-0101 August 1990 Forwards Rev 0 to Inservice Insp Rept Unit 1 McGuire 1990 Refueling Outage 6 ML20058L1811990-08-0101 August 1990 Forwards Safety Evaluation of Large Break LOCA Event Reanalysis Per 10CFR50.46 Re Peak Clad Temp Increases ML20059K0291990-08-0101 August 1990 Forwards Comments on Reactor Operator & Senior Reactor Operator Written Exams Administered on 900730 ML20056A1571990-07-23023 July 1990 Forwards Public Version of Change 0 to RP/0/A/5700/10 & Rev 25 to Section 18.2 of Radiation Protection Manual.W/ Dh Grimsley 900730 Release Memo NLS9000259, Responds to Violations Noted in Insp Repts 50-369/90-09 & 50-370/90-09.Corrective actions:in-house Training Will Be Provided on Correct Method for Determining Proper Response to Problem Investigation Processes1990-07-16016 July 1990 Responds to Violations Noted in Insp Repts 50-369/90-09 & 50-370/90-09.Corrective actions:in-house Training Will Be Provided on Correct Method for Determining Proper Response to Problem Investigation Processes ML20055F7721990-07-13013 July 1990 Forwards Monthly Operating Repts June 1990 for McGuire Nuclear Station Units 1 & 2 & Status Rept for May 1990 ML20044B0561990-07-0303 July 1990 Forwards Public Version of Epips,Consisting of RP/0/A/5700/02 & RP/0/A/5700/03 & RP/0/A/5700/04.W/ Dh Grimsley 900716 Release Memo ML20044A7941990-06-19019 June 1990 Forwards Public Version of Epips,Including HP/0/B/1009/06, HP/0/B/1009/10 & HP/0/B/1009/20 ML20043H5541990-06-18018 June 1990 Forwards Supplemental Info to Tech Spec Rev Request Re Auxiliary Bldg Filtered Ventilation Sys ML20043G1531990-06-15015 June 1990 Forwards Monthly Operating Repts for May 1990 & Corrected Unit Shutdowns & Power Reductions for Apr 1990 ML20043G1741990-06-0707 June 1990 Responds to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire. Correct RCS Operating Pressure Would Be 2,250 Psia as Identified in Table 3-1 ML20043G3451990-06-0707 June 1990 Forwards Proprietary Response to Request for Addl Info Re Topical Rept BAW-10174, Mark-BW Reload Safety Analysis for Catawba & Mcguire. Response Withheld ML20043G7171990-06-0606 June 1990 Forwards Population Dose Analysis Summary for Plant Liquid Release Pathways Based on 1986 Release Estimates ML20043G6321990-06-0505 June 1990 Responds to Violations Noted in Insp Repts 50-369/90-01 & 50-370/90-01.Corrective Actions:Memo Issued Reemphasizing Importance of Frisking & Outlining Frisking Requirement & Personnel Counseled Re Completing Required Documentation ML20043G6281990-06-0404 June 1990 Advises That Corrective Actions Re Departmental Interface Issues to Resolve & Train on Revised Directive Will Be Completed by 900901,per Insp Repts 50-369/89-01 & 50-370/89-01 ML20043F4761990-05-30030 May 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Consisting of Rev 20 to CMIP-13 & Deletion of CMIP-15 & CMIP-17.W/900612 Release Memo ML20043B5691990-05-23023 May 1990 Advises That Responses to Violations Noted in Insp Repts 50-369/90-01 & 50-370/90-01 Will Be Delayed Until 900601 ML20043C0781990-05-22022 May 1990 Responds to Violations Noted in Insp Repts 50-369/90-04 & 50-370/90-04.Corrective Actions:Correct Procedure Adherence Reemphasized to Job Supervisor & Engineering Group Involved in Authorization for Torque Change ML20043B9351990-05-16016 May 1990 Forwards Public Version of Epips,Including HP/1/B/1009/15 & HP/2/B/1009/15.W/DH Grimsley 900529 Release Memo ML20043A1041990-05-15015 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Mar 1990 for McGuire Nuclear Station Units 1 & 2 ML20042G8221990-05-10010 May 1990 Forwards Addl Info Re Events Leading to 900509 Emergency Tech Spec (TS) Request Re TS 4.6.1.8,per Ds Hood 900510 Telcon & Requests That Changes Also Be Made to Unit 2 Ts. Proposed TS Encl ML20043A8621990-05-10010 May 1990 Forwards Info for Facility 1990 Refueling Outage Re Steam Generator F* Tubes & Tubes Removed from Svc or Repaired ML16152A9621990-05-0909 May 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 35 to CMIP-1,Rev 26 to CMIP-2,Rev 31 to CMIP-4,Rev 35 to CMIP-5,Rev 40 to CMIP-6,Rev 39 to CMIP-7 & Rev 26 to CMIP-8.W/DH Grimsley 900517 Release Memo ML20042G8331990-05-0808 May 1990 Forwards Info for Facility Tube Rupture Outage Re Steam Generator Inservice Insp,Per Tech Spec 4.4.5.5 & 6.9.2 ML16152A9531990-05-0202 May 1990 Forwards Proprietary DPC-NE-2000P-A & Nonproprietary DPC-NE-2000-A, DCHF-1 Correlation for Predicting Heat Flux in Mixing Vane Grid Fuel Assemblies. Proprietary Rept Withheld ML20042F2611990-04-30030 April 1990 Forwards Technical Evaluation That Concludes Fireproofing of Supports for safety-related HVAC Ducts Not Required & Amends Fire Protection Commitment Re HVAC Sys Support Fireproofing ML20042F8331990-04-26026 April 1990 Forwards Public Version of Revised Epips,Including Change 0 to RP/0/A/5700/01,RP/0/A/5700/02 & RP/0/A/5700/03 ML20042E0631990-04-13013 April 1990 Forwards Monthly Operating Repts for McGuire Nuclear Station for Mar 1990 & Feb 1990 Rept Re Personnel Exposure 1990-09-04
[Table view] |
Text
. . _.. ~ , _ _ . . _ . ._ . ,. . .- _ ___ .
\ .,
,: ..o DUKE POWER GOMPANY
[ P.O. BOX 33189 j CHARLOTTE. N.C. 28242 HALH. TUCKER rer.myssons vum r===.n==v (704) omt ;
- m. = ,=on.mnow August 22, 1985 Mr. Hugh L. Thompson, Jr. . . Director
! Division of Licensing Office of Nuclear Reactor Regulation Washington, D. C. 20555
Subject:
McGuire Nuclear ion %gd Docket Nos. 50 d 50r4t4 Generic Letter 85-12
Dear Mr. Thompson:
Please find attached our response to Generic Letter 85-12 for McGuire Nuclear Station concerning implementation of TMI Action Item II.K.3.5 "Atomatic Trip of Reactor Coolant Pumps."
Very truly yours, d'BLL w Hal B. Tucker RLG/hrp Attachments.
cc: Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region-II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector
'McGuire Nuclear Station Mr. Darl Hood Office of Nuclear Reactor Regulation U. S.: Nuclear. Regulatory Commission
. Washington, D..C. 20555 l'
t L '
o
- 8508290199 DR ADOCK850822 k
05000369
, PDR '
l
-,- . ~ . _ , , , , ... -.- . .. - - __ _ .- . - . _ . _ - - -. ~ ... _ ..-, - ~ , , , - - - . . , _ . - - - - - - - ,
N
. Duke Power Company McGuire Nuclear Station Response to Generic Letter 85-12 A. Determination of RCP Trip Criteria
- 1. Identify the instrumentation to be used to determine the RCP trip setpoint, including the degree of redundancy of each parameter signal needed for the criterion chosen.
' Response: Since the RCS subcooling criterion has been selected, both pressure and temperature must be determined. The calculation 2 of subcooling will normally be made by a program on the plant computer using the following inputs:
i Pressure RCS Wide Range Pressure RCS Low Range Pressure Temperature Loop A Wide Range Hot Leg Temperature Loop B Wide Range Hot Leg Temperature Loop C Wide Range Hot Leg Temperature Loop D Wide Range Hot Leg Temperature Core Exit Thermocouple Temperatures The-pressure input is selected from the RCS Low Range Pressure, if valid, since this instrument has the smaller uncertainty.
Otherwise, the RCS Wide Range Pressure is used. If this indication is unavailable, Pressurizer Pressure is used as a substitute. The errors given below for RCS Wide Range Pressure bound those for Pressurizer Pressure. For the temperature input the five (5) highest valid thermocouple indications are averaged. This average is compared with the four (4) Loop Wide Range Hot Leg Temperatures. The highest valid indication from this comparison is used as the temperature input.
If the plant computer calculation is not available, a redundant means of determining subcooling is available to the operator via graphs maintained in the control room. All of the above instrumen-tation is available to the operator on control room indications.
Another channel of RCS Wide Range Pressure is also available as an additional pressure ^ indication.
- 2. a) Identify the instrumentation uncertainties for both normal and adverse containment conditions.
b) Describe the basis for the selection of the adverse containment parameters.
L c) Address, as appropriate, local conditions such as fluid jets or pipe whip which might influence the instrumentation reliability.
1
l 1
-w
Response
l a) The uncertainties use in the subcooling determination described
! above are listed below for each instrument.
Normal Adverse Instrument Conditions Conditions
-RCS Wide Range Pressure 63 psi 213 psi RCS Low Range Pressure 29 psi 125 psi Loop Wide Range Hot Leg. Temperature 8.1 *F 8.5 *F Core Exit Thermocouple Temperature 7.2 *F* 8.5 *F*
- The core exit thermocouple error increases with increasing temperature. The' error shown is for 530*F and is conservatively used for temperatures below 530*F.
b) A value of 3 psig, which corresponds approximately to the high-high containment pressure setpoint, is used as the basis for the selection of adverse containment parameters. This value is more appropriate, for an ice condenser plant such as McGuire, than the Westinghouse Emergency Response Guidelines
! (ERG) value, "approximately 5 psig", which is for a dry containment.
c) Local conditions which might influence instrument reliability have been addressed in the McGuire Nuclear Station Response to NUREG-0588, as currently revised in a letter from H. B. Tucker, ,
Duke Power Co., to H. R. Denton, NRC, October 15, 1984.
'3. In addressing the selection of the criterion, consideration of uncertainties associated with the WOG supplied analyses values must be provided. These uncertainties include both uncertainties in the computer program results and uncertainties resulting from plant specific features not representative of the generic data group.
Response
- The LOFTRAN computer code was used to perform the alternate RCP trip
( criteria analyses. Both Steam Generator Tube Rupture (SGTR) and L non-LOCA events were simulated in these analyses. Results from the SGTR analyses were used to obtain all but three of the trip parameters. 'LOFTRAN is a Westinghouse licensed code used for FSAR SGTR and non-LOCA analyses. The code has been validated against the January 1982 SGTR event at the Ginna plant. The results of this validation show that LOFTRAN can accurately predict RCS pressure, RCS temperatures and secondary pressures especially in the first ten minutes of the transient. This is the critical time period when minimum pressure and subcooling is determined.
l The major causes of uncertainties and conservatism in the computer program results, assuming no changes in the initial plant-conditions (i.e., full power, pressurizer lever, all SI and AFW pumps running) are due to either models in or inputs to LOFTRAN. The following are i
2
P l l
1 I
l considered to have the most impact on the determination of the RCP trip criteria:
- 1. Break flow
- 2. SI flow
- 3. Decay heat
- 4. Auxiliary feedwater flow The following sections provide an evaluation of the uncertainties associated with each of these items.
To conservatively simulate a double ended tube rupture in safety analyses, the break flow model used in LOFTRAN includes substantial amount of conservatism (i.e. , predicts higher break flow than actually expected). Westinghouse has performed analyses and developed a more realistic break flow model that has been validated against the Ginna SGTR tube rupture data. The break flow model used in the WOG analyses has been shown to be approximately 30%
conservative when the effect of the higher predicted break flow is compared to the more realistic model. The consequence of the higher predicted break flow is a lower than expected predicted' minimum pressure.
The SI flow inputs used were derived from best estimate calculations, assuming all SI trains operating. An evaluation of the calculational methodology show that these inputs have a maximum uncertainty of 10%.
The decay heat model used in the WOG analyses was based on the 1971 ANS 5.1 standard. When compared with the more recent 1979 ANS 5.1 decay heat inputs, the values used in the WOG analyses is higher by about 5%. To determine the effect of the uncertainty due to the p decay heat model, a sensitivity study was conducted for SGTR. The results of this study show that a 20% decrease in decay heat l
resulted in only a 1% decrease in RCS pressure for the first 10 i minutes of the transient. Since RCS temperature is controlled by
! the steam dump, it is not affected by the decay heat model l uncertainty.
The AFW flow rate input used in the WOG analyses are best estimate
! values, assuming that all auxiliary feed pumps running, minimum pump l
start delay, and no throttling. To evaluate the uncertainties with AFW flow rate, a sensitivity study was performed. Results from the two loop plant study show that, a 64% increase in AFW flow resulted in only an 8% decrease in minimum RCS pressure, a 3% decrease in minimum RCS subcooling, and an 8% decrease in minimum pressure differential. Results from the 3 loop plant study show that, a 27%
increase in AFW flow resulted in only a 3% decrease in minimum RCS pressure, a 2% decrease in minimum RCS subcooling, and a 2% decrease e in pressure differential.
The effects of all these uncertainties with the models and input parameters were evaluated and it was concluded that the contributions from the break flow conservatism and the SI 3
uncertainty dominate. _The calculated overall uncertainty in the WOG analyses as a result of these considerations for the McGuire units is -10*F to +10*F for the RCS subcooling RCP trip setpoint.
Due to the minimal effects from the decay heat model and AFW input, these results include only the effects of the uncertainties due to the break flow model and SI flow inputs.
B. Potential Reactor Coolant Pump Problems
- 1. Assure that containment isolation, including inadver'.ent isolation, will not cause problems if it occurs for non-LOCA transients and accider's.
- a. Demonstrate that, if water services needed for RCP operations are terminated, they can be restored fast enough once a non-LOCA situation is confirmed to prevent seal damage or failure.
Response: Reactor coolant pump seal damage is prevented by-a continued supply of cooling water from the Chemical and Volume Control System (seal injection) and/or from the Component Cooling System (thermal barrier cooling). Only one of these supplies is necessary to prevent seal damage or failure.
Although_ thermal barrier cooling is isolated on Phase B con-tainment isolation, seal injection is maintained regardless of isolation status. Thus seal damage or failure will be avoided for LOCA, non-LOCA, or inadvertent containment isolation.
- b. Confirm that containment isolation with continued pump operation will not lead to seal or pump damage or failure.
Response: The effects of containment isolation on reactor coolant pump seals are addressed in the previous item.
Component cooling and service water to the reactor coolant pump motors and thermal barriers is isolated on Phase B containment isolation (high-high containment pressure). This is done to isolate any piping in these systems which might be damaged by pipe whip or jet impingement caused by a LOCA. The~ operators are trained to trip the reactor coolant pumps promptly upon the loss of water services due to Phase B containment isolation.
Thus, there will be no continued operation which will lead to pump damage. There are no water services, needed for continued pump operation, which are lost due to Phase A containment isolation (high containment pressure).
- 2. Identify the components required to trip the RCPs, including relays, power supplies and breakers. Assure that RCP trip, when determined to be necessary, will occur. If necessary, as a result of the loca-tion of any critical component, include the effects of adverse con-tainment-conditions on RCP trip reliability. Describe the basis for the adverse containment parameters selected.
4
~
, O, Response: The reactor coolant pumps are manually tripped by-depressing the trip pushbuttons (one for each pump) on a panel located in the control room. This action will energize one of the two indepen~ dent shunt trip coils located in each of the 6.9KV RCP switchgear assemblies, causing the RCP switchgear breakers to open (and hence the RCPs to trip). There are four RCP switchgear assemblies per unit,.one for each RCP motor, located in the penetration rooms of the auxiliary building.
All RCP switchgear protective relays, including the trip coils, rely on 125VDC power to trip the. breakers. The breaker control power is furnished by 125VDC Auxiliary Control Power System dis-tribution centers located in the auxiliary building. In the event
. control power is lost, the RCP switchgear breakers may be manually tripped by means of the trip /close levers located in the breaker cubicles.
Since none of the critical component are located inside the reactor building, adverse containment conditions need not be considered.
C. Operator Training and Procedures (RCP Trip)
.1. Describe the operator training program for RCP trip. Include the general philosophy regarding the need-to trip pumps versus the desire to keep pumps running.
Response: Reactor Coolant Pump Training is conducted formally during various types of classroom training sessions. These sessions
[ include License Prep Reactor Operator Training, License Prep Senior l
, Reactor Operator Training and Requalification Training. During each of these training sessions a variety of topics are discussed.
Among these topics are: The Purpose, Component Description, Component Operation, Instrumentation and Control, Setpoints, Limits and Precautions. During the Component Operation and Limits and l Precautions discussions, a variety of Reactor Coolant Pump Trips and u their associated limits are discussed. Among these trips are: High Upper and/or Lower Bearing Temperature Trips, High Motor Stator Winding Temperature Trip, Excessive Vibration on the Rotor and Casing, High Number One Seal Outlet Temperature Trips, High Pump Radial Bearing Temperature Trips and Loss of RCS Subcooling Trip.
Further training on Reactor Coolant Pump Trips include formal classroom training on Abnormal and Emergency Procedures. Abnormal Procedure " Malfunction of Reactor Coolant Pumps" describes the various Symptoms, Immediate Actions and Subscquent Actions the operator is required to take in the event of a pump malfunction.
Several Emergency Procedures describe the required pump trip following loss of RCS subcooling. The Abnormal Procedure " Loss of Reactor Coolant Flow" will refer the operator to the " Malfunction of Reactor Coolant Pump" Abnormal Procedure in the event the loss of flow was due to a pump malfunction.
5
=
2 Various industry incident reports pertaining to NC Pumps are. discussed with all Licensed personnel in the classroom. The WOG criteria for the simultaneous tripping of all four NC Pumps are discussed each time the lesson is taught. -All procedures discussed in paragraphs above are taught during Simulator Requalification in both annual and biannual sessions. Any NRC and/or INPO recommendations concerning RCPs are discussed, analyzed and implemented wherever applicable.
- 2. Identify those procedures which include RCP trip related operations:
(a). RCP trip using WOG alternate criteria Response: EP/01, Safety Injection EP/02, High Energy Line Break Inside Containment EP/03, Steam Line Break Outside Containment EP/04, Steam Generator Tube Rupture (b) RCP restart Response: EP/1.1, Natural Circulation Cooldown EP/2.1, SI Termination Following High Energy Line Break Inside Containment EP/2.2, Post-LOCA Cooldown And Depressurization EP/3.1, S1 Termination Following Steam Line Break EP/04, Steam Generator Tube Rupture EP/5.1, SGTR With Continuous NC System Leakage:
Subcooled Recovery EP/5.2, SGTR With Continuous NC System Leakage:
Saturated Recovery EP/5.3, SGTR Without Pressurizer Pressure Control EP/12.1, Response To Inadequate Core Cooling EP/13.1, Response To Loss Of Secondary Heat Sink EP/14.1, Response To Imminent Pressurized Thermal Shock Conditions EP/14.2, Response To Anticipated Pressurized Thermal Shock Conditions EP/16.3, Response To Voids In Reactor Vessel (c) Decay heat removal by natural circulation
-Response: All McGuire emergency procedures, as appropriate, are written to address either forced or natural circulation decay heat s removal.
(d) Primary system void removal Response: Although several different procedures refer to void
~ removal, the only one which restarts reactor coolant pumps for this purpose is EP/16.3, Response To Void In Reactor Vessel.
(e) Use of steam generators with and without RCPs operating Response: In the McGuire emergency procedures, steam generators
, are used for decay heat removal and for reactor coolant system 6
4 cooldown. Decay heat removal is addressed in item C.2.(c) above.
The emergency procedures which use the steam generators for cooling down are
- EP/1.1,. Natural Circulation Cooldown EP/2.2, Post-LOCA Cooldown And Depressurization EP/04; Steam Generator Tube Rupture EP/4.1,-SGTR Cooldown Using Steam Dump EP/4.2, SGTR Cooldown Using Backfill EP/4.3, SGTR.Cooldown Using Blowdown EP/5.1, SGTR With Continuous NC System Leakage:
Subcooled Recovery EP/5.2, SGTR With Continuous NC System Leakage:
Saturated Recovery EP/5.3, SGTR Without Pressurizer Pressure Control EP/06, Loss Of Emergency Coolant Recirculation EP/09,' Loss Of All AC Power EP/12.1, Response To Inadequate. Core Cooling EP/12.2, Response To Degraded Core Cooling EP/13.3, Response To Steani Generator Overpressure
- (f) RCP trip for other reasons Response: Reactor coolant pumps are tripped in the McGuire emergency procedures for two additional reasons:
i) prevention of pump damage from operation under abnormal conditions 1
ii) prevention of heat addition to the reactor coolant system under degraded heat _ sink conditions The emergency procedures which contain these additional trip in-structions are EP/2.1, SI Termination Following High Energy Line Break Inside Containment EP/2.2, Post-LOCA Cooldown And Depressurization EP/3.1, SI Termination Following Steam Line Break EP/4.1, SGTR Cooldown Using Steam Dump EP/4.2, SGTR Cooldown Using Backfill EP/4.3, SGTR Cooldown Using Blowdown EP/5.1, SGTR With Continuous NC System Leakage:
Subcooled Recovery.
EP/5.2, SGTR With Continuous NC System Leakage:
Saturated Recovery EP/5.3, SGTR Without Pressurizer Pressure Control EP/06, Loss Of Emergency Coolant Recirculation EP/13.1, Response To Loss Of Secondary Heat Sink The McGuire emergency procedures are very similar to the Catawba
- emergency procedures already reviewed and approved by the NRC as documented in Catawba SSER No. 4, December, 1984. Both sets of 7
procedures are based on the Westinghouse Owners Group Emergency Response Guidelines (ERGS) which are currently under review by the NRC.
8